40.25.4 APPENDIX 4 TO ATTACHMENT HH
PRE-APPLICATION REQUEST FORM
Pursuant to Section 40.4.2 of Attachment HH to the NYISO Open Access Transmission Tariff, a prospective Interconnection Customer (“Requestor”) may request a Pre-Application Report from the NYISO regarding the proposed interconnection of a Generating Facility or Cluster Study Transmission Project at a particular point on the New York State Transmission System or Distribution System. To request a Pre-Application Report, Requestor must complete and execute this request form and submit the form to the NYISO via the NYISO Interconnection Projects Portal, along with submitting a non-refundable fee of $5,000 for each Point of Interconnection (POI). Requestor must provide a substantive answer to each of the questions in this request form and should not specify that the requested information is “to be determined” or “not available.” Requestor should direct any questions regarding the requested information and the completion of this form to:
Designated Contact Person: | Stakeholder Services IP Support Team |
Telephone Number: | 518-356-6060, Option#2 |
E-Mail Address: | stakeholder_services_ipsupport@nyiso.com |
Requestor shall submit the fee electronically via wire transfer. Wiring instructions are provided in the NYISO Interconnection Projects Portal.
Upon its confirmation of a completed request form and its receipt of the required fee, the NYISO will send the request form to the relevant Connecting Transmission Owner for completion of the Pre-Application Report in the form set forth in Appendix A to this request form. The Connecting Transmission Owner shall complete this report to the extent readily available data exists. If the ISO, in consultation with the relevant Connecting Transmission Owner, determines that the interconnection, as proposed, does not appear to be subject to the NYISO’s interconnection procedures under the NYISO OATT, (1) the NYISO will inform the Requestor that its proposed interconnection is not subject to the NYISO’s interconnection procedures, and (2) the Connecting Transmission Owner will provide the Requestor with the Pre-Application Report set forth in Appendix A that is completed to the extent possible. The Pre-Application Report is non-binding and does not confer any rights or obligations.
Notwithstanding its request for a Pre-Application Report, a Requestor must still successfully complete the interconnection requirements set forth in Attachment HH to the NYISO OATT to interconnect to the New York State Transmission System or Distribution System, to the extent that the NYISO OATT is applicable to the proposed interconnection.
Project Name: |
| ||
Requestor: | Name: |
| |
Address: |
| ||
Contact Person: | Name: |
| |
Email: |
| ||
Phone #: |
| ||
Project Type | (e.g., generation, transmission, combined resource) | ||
Energy Source(s): | (e.g, solar, wind, energy storage, etc.) | ||
Nameplate Size: | MW: | MVA: | |
For storage facility:
Capacity (MWh): |
|
Max Charging (MWh/hr): |
|
Max Discharging (MWh/hr): |
|
Max aggregate injection (hybrid) (MWh/hr): |
|
If combined resource, will storage charge from grid? (Yes/No): _________________
Estimated Initial Backfeed Date: _____________________________________
Connecting Transmission Owner (CTO), if known: __________________________________________
Affected Transmission Owner(s), if known: _______________________________________________
a. Primary POI
| |
Line Name: |
|
POI Location (Decimal Lat / Long): ________________________________
Expected POI Voltage (34.5 kV, 115 kV, etc): _________________________
☐ Conceptual or Breaker Level One Line Diagram Provided
b. Secondary POI
Station Name: |
|
Line Name: |
|
POI Location (Decimal Lat / Long): ________________________________
Expected POI Voltage (34.5 kV, 115 kV, etc): _________________________
☐ Conceptual or Breaker Level One Line Diagram Provided
c. Project Location:
☐ Map identifying the location of project in relation to proposed POI(s) (e.g., preliminary general layout, property boundaries, etc.)
New Service Requested (yes or no): __________
If No, and there is existing service, provide:
Customer Account Number: ______________________
Site Load:
| Minimum (kW) | Maximum (kW) |
Current |
|
|
Proposed |
|
|
If known, will the facility be used for the following:
☐ Net Metering
☐ To supply power only to the Requestor
☐ To supply power to others through wholesale sales over the New York State Transmission System or Distribution System.
☐ Is the project an uprate to a project in the current Queue or an existing facility.
If yes, provide description:
|
|
|
|
Additional Information or Comments:
|
|
I hereby certify that, to the best of my knowledge, all the information provided in this Pre- Application Request Form is true and correct.
Requestor:______________________________________________ Date:__________
APPENDIX A
PRE-APPLICATION REPORT
This Pre-Application Report has been completed based on readily available data. The information provided is preliminary and non-binding and does not confer any rights on the part of the Requestor or obligations on the part of the Connecting Transmission Owner. Information is provided based on applicability to the proposed Point(s) of Interconnection (“POI(s)”).
This Pre-Application Report is for the following proposed project:
____________________________________________________________________________________________________________________________________________________________
a. Transmission or Distribution Line
Line Name | Utility Line Id Number | Bus Numbers and Circuit Id Number (PSS/e From/To) | Voltage (kV) |
|
|
|
|
☐ FERC Jurisdictional Distribution ☐ Networked ☐ Radial
Ratings (MVA):
| Normal | LTE | STE |
Summer |
|
|
|
Winter |
|
|
|
Terminal End Stations:
Name | Distance to POI (miles) |
|
|
|
|
|
|
For a Generation Facility or Cluster Study Transmission Project and sub-transmission or distribution POIs:
Circuit Loading (MW):
| |
Minimum |
|
Generation (MW):
Existing |
|
Proposed |
|
|
|
|
|
|
b. Substation
Name | PSS/e Bus Number | Voltage (kV) |
|
|
|
☐ FERC Jurisdictional Distribution
Substation Connected Line Ratings (MVA):
Line Information | Summer | Winter | |||||
Line Name | Utility Line Id Number | Normal | LTE | STE | Normal | LTE | STE |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
For a Generation Facility or Cluster Study Transmission Project and sub-transmission or distribution POIs:
Customer Load (MW):
Peak |
|
Minimum |
|
Generation (MW):
Existing |
|
Proposed |
|
Additional information (e.g., known physical feasibility issues, available breaker positions; planned transmission upgrades, breaker rating, existing/known constraints):
|
|
|
|
|
a. Transmission or Distribution Line
Line Name | Utility Line Id Number | Bus Numbers and Circuit Id Number (PSS/e From/To) | Voltage (kV) |
|
|
|
|
☐ FERC Jurisdictional Distribution ☐ Networked ☐ Radial
Ratings (MVA):
| Normal | LTE | STE |
Summer |
|
|
|
Winter |
|
|
|
Terminal End Stations:
Name | PSS/e Bus Number | Distance to POI (miles) |
|
|
|
|
|
|
|
|
|
Circuit Loading (MW):
Peak |
|
Minimum |
|
Generation (MW):
Existing |
|
Proposed |
|
Additional information (e.g., potential new substation bus configuration, transmission constraints, planned transmission upgrades, parallel lines, breaker rating, existing/known constraints):
|
|
|
|
|
b. Substation
Name | PSS/e Bus Number | Voltage (kV) |
|
|
|
☐ FERC Jurisdictional
Substation Connected Line Ratings (MVA):
Line Information | Summer | Winter | |||||
Line Name | Utility Line Id Number | Normal | LTE | STE | Normal | LTE | STE |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
For a Generation Facility or Cluster Study Transmission Project and sub-transmission or distribution POIs:
Customer Load (MW):
Peak |
|
Minimum |
|
Generation (MW):
Existing |
|
Proposed |
|
Additional information (e.g., known physical feasibility issues, available breaker positions, planned transmission upgrades breaker rating, existing/known constraints):
|
|
|
|