35.21 Schedules A and B

Schedule A - Description Of Interconnection Facilities

The NYISO – PJM Joint Operating Agreement covers the PJM – NYISO Interconnection Facilities under the Operational Control of the NYISO and PJM. 

 

NYISO and PJM shall jointly develop and maintain a ‘PJM – NYISO Interconnection Facilities List’ (including a description of the facilities and metering points) and post the most current mutually agreed upon list on their respective public websites.  The Parties may jointly revise the list by mutual written agreement. After the Parties mutually agree to changes, NYISO and PJM shall post an updated list on their respective websites.  Neither Party shall knowingly post a list that includes changes that are not the product of mutual agreement.

 

The PJM-NYISO Interconnection contains twenty-five (25) alternating current (“AC”) Interconnection Facilities, seven (7) of which form one (1) AC pseudo-tie[1]; and further contains two (2) HVDC Interconnection Facilities as well as one (1) Variable Frequency Transformer (VFT).

 

For Operational Control purposes, the point of demarcation for each of the Interconnection Facilities is the point at which the Interconnection Facility crosses the PJM-New York State boundary, except as otherwise noted in the PJM – NYISO Interconnection Facilities List posting.

 

The following table identifies NY/PJM Interfaces at which NYISO and PJM are Authorized to Consider CTS Interface Bids:

 

PJM Interface Name

PNODE ID

Corresponding NYISO Proxy Generator Buses[2]

PTID

NYIS

5413134

PJM_GEN_KEYSTONE

 

24065

NYIS

5413134

PJM_LOAD_KEYSTONE

 

55857

LindenVFT

81436855

PJM_GEN_VFT_PROXY

 

323633

LindenVFT

81436855

PJM_LOAD_VFT_PROXY

 

355723

Neptune

56958967

PJM_GEN_NEPTUNE_PROXY

 

323594

Neptune

56958967

PJM_LOAD_NEPTUNE_PROXY

 

355615

HudsonTP

1124361945

PJM_HTP_GEN

 

323702

HudsonTP

1124361945

HUDSONTP_345KV_HTP_LOAD

 

355839

 

 

Schedule B - Other Existing Agreements:

1.0 Lake Erie Emergency Redispatch (LEER)

2.0 RAMAPO PHASE ANGLE REGULATOR OPERATING PROCEDURE prepared by the NYPP/PJM Circulation Study Operating Committee.

 

3.0 Northeastern ISO/RTO Coordination of Planning Protocol

4.0 Inter Control Area Transaction Agreement.

5.0 Procedures to Protect for Loss of Phase II Imports (effective January 16, 2007, pursuant to Order issued January 12, 2007, in FERC Docket No. ER07-231-000).

6.0 Joint Emergency Operating Protocol dated September 10, 2009, among PJM Interconnection, L.L.C., New York Independent System Operator, Inc., and Linden VFT, LLC (Filed by PJM on October 1, 2009, in FERC Docket No. ER09-996-000).

Effective Date: 2/14/2024 - Docket #: ER24-686-000 - Page 1


[1] WEQ-007 “Inadvertent Interchange Payback Standards,” North American Energy Standards Board (NAESB), on-line at www.naesb.org.

[2] See NYISO Market Administration and Control Area Services Tariff Section 4.4.4 for additional information.