NYISO Tariffs --> Open Access Transmission Tariff (OATT) --> 2 OATT Common Service Provisions --> 2.3 OATT Ancillary Services

2.3Ancillary Services

Ancillary Services are needed with Transmission Service to maintain reliability within and among the Control Areas affected by the Transmission Service.  The ISO

provides the following Ancillary Services:  (i) Scheduling, System Control and Dispatch, (ii) Voltage Support Service, (iii) Regulation Service, (iv) Energy Imbalance; (v) Operating Reserves Service, and (vi) Black Start Service. 

The specific Ancillary Services, prices and/or compensation methods are described on the schedules that are attached to and made a part of this Tariff.    Sections 2.3.1 through 2.3.6 below list the six Ancillary Services.

2.3.1Scheduling, System Control and Dispatch Service: 

The costs for Scheduling, System Control, and Dispatch Service are included among those costs recovered through Schedule 1.

2.3.2Voltage Support Service: 

The rates and/or methodology are described in Schedule 2.

2.3.3Regulation Service: 

The rates and/or methodology are described in Schedule 3.

2.3.4Energy Imbalance Service: 

The rates and/or methodology are described in Schedule 4.

2.3.5Operating Reserve Service: 

The rates and/or methodology are described in Schedule 5.

2.3.6ISO Black Start Capability: 

The rates and/or methodology are described in Schedule 6.

Effective Date: 10/7/2011 - Docket #: ER11-4257-000 - Page 1