NYISO Agreements --> Service Agreements --> SGIA No. 2293 between National Grid and Innovative/Colonie
FERC rendition of the electronically filed tariff records in Docket No. ER16-2287
Filing Data:
CID: C000038
Filing Title: SGIA 2293 between National Grid and Innovative/Colonie Company Filing Identifier: 1173
Type of Filing Code: 130
Associated Filing Identifier: 1172
Tariff Title: NYISO Agreements
Tariff ID: 58
Payment Confirmation: N
Suspension Motion:
Tariff Record Data:
Record Content Description: Agreement No. 2293
Tariff Record Title: SGIA No. 2293 between National Grid and Innovative/Colonie Record Version Number: 0.1.0
Option Code: A
Tariff Record ID: 206
Tariff Record Collation Value: 8081100
Tariff Record Parent Identifier: 2
Proposed Date: 2016-04-29
Priority Order: 600
Record Change Type: Change Record Content Type: 2
Associated Filing Identifier: 1172
Effective Date: 9/26/2016 - Docket #: ER16-2287-001 - Page 1
NYISO Agreements --> Service Agreements --> SGIA No. 2293 between National Grid and Innovative/Colonie
NYISO OATT SERVICE AGREEMENT No. 2293
INTERCONNECTION AGREEMENT
BETWEEN
NIAGARA MOHAWK POWER CORPORATION D/B/A NATIONAL GRID
AND
INNOVATIVE/COLONIE, LLC
Effective Date: 9/26/2016 - Docket #: ER16-2287-001 - Page 1
NYISO Agreements --> Service Agreements --> SGIA No. 2293 between National Grid and Innovative/Colonie
TABLE OF CONTENTS
Article 1 Scope and Limitations of Agreement............................2
1.1 Applicability............................................ 2
1.2 Purpose................................................ 2
1.3 Scope of Interconnection Service............................... 2
1.4 Limitations............................................. 2
1.5 Responsibilities of the Parties................................. 3
1.6 Parallel Operation Obligations................................. 3
1.7 Metering............................................... 4
1.8 Reactive Power........................................... 4
1.9 Capitalized Terms......................................... 4
Article 2 Inspection, Testing, Authorization, and Right of Access..............5
2.1 Equipment Testing and Inspection.............................. 5
2.2 Authorization Required Prior to Parallel Operation................... 5
2.3 Right of Access.......................................... 6
Article 3 Effective Date, Term, Termination, and Disconnection...............7
3.1 Effective Date........................................... 7
3.2 Term of Agreement........................................ 7
3.3 Termination............................................. 7
3.4 Temporary Disconnection.................................... 8
Article 4 Cost Responsibility for Interconnection Facilities and Distribution
Upgrades..............................................11
4.1 Interconnection Facilities................................... 11
4.2 Distribution Upgrades..................................... 11
Article 5 Cost Responsibility for System Upgrade Facilities and System
Deliverability Upgrades....................................12
5.1 Applicability........................................... 12
5.2 System Upgrades......................................... 12
5.3 Special Provisions for Affected Systems......................... 12
Article 6 Billing, Payment, Milestones, and Financial Security................13
6.1 Billing and Payment Procedures and Final Accounting................ 13
6.2 Milestones............................................. 13
6.3 Financial Security Arrangements.............................. 14
Article 7 Assignment, Liability, Indemnity, Force Majeure, Consequential
Damages, and Default.....................................15
7.1 Assignment............................................ 15
7.2 Limitation of Liability..................................... 15
7.3 Indemnity............................................. 15
7.4 Consequential Damages.................................... 16
7.5 Force Majeure.......................................... 16
i
Effective Date: 9/26/2016 - Docket #: ER16-2287-001 - Page 1
NYISO Agreements --> Service Agreements --> SGIA No. 2293 between National Grid and Innovative/Colonie
7.6 Breach and Default....................................... 17
Article 8 Insurance..............................................19
Article 9 Confidentiality..........................................20
Article 10 Disputes...............................................22
Article 11 Taxes................................................23
Article 12 Miscellaneous...........................................24
12.1 Governing Law, Regulatory Authority, and Rules................... 24
12.2 Amendment............................................ 24
12.3 No Third-Party Beneficiaries................................. 24
12.4 Waiver............................................... 24
12.5 Entire Agreement........................................ 24
12.6 Multiple Counterparts..................................... 25
12.7 No Partnership.......................................... 25
12.8 Severability............................................ 25
12.9 Security Arrangements..................................... 25
12.10 Environmental Releases.................................... 25
12.11 Subcontractors.......................................... 25
Article 13 Notices....................................................24
13.1 General............................................... 27
13.2 Billing and Payment....................................... 27
13.3 Alternative Forms of Notice................................. 28
13.4 Designated Operating Representative........................... 28
13.5 Changes to the Notice Information............................. 30
Article 14 Signatures.............................................31
Attachment 1 Glossary of Terms
Attachment 2 Detailed Scope of Work, Including Description and Costs of the Small Generating Facility, Interconnection Facilities, and Metering Equipment
Attachment 3 One-line Diagram Depicting the Small Generating Facility, Interconnection Facilities, Metering Equipment, and Upgrades
Attachment 4 Milestones
Attachment 5 Additional Operating Requirements for the New York State Transmission System, the Distribution System and Affected Systems Needed to Support the
Interconnection Customer’s Needs
Attachment 6 Connecting Transmission Owner’s Description of its Upgrades and Best Estimate of Upgrade Costs
Attachment 7 Insurance Coverage
ii
Effective Date: 9/26/2016 - Docket #: ER16-2287-001 - Page 1
NYISO Agreements --> Service Agreements --> SGIA No. 2293 between National Grid and Innovative/Colonie
This Interconnection Agreement (“Agreement”) is made and entered into this 29th day
of April, 2016, by and between Niagara Mohawk Power Corporation d/b/a National Grid,
a corporation existing under the laws of the State of New York (“Connecting
Transmission Owner”), and Innovative Colonie, a limited liability company organized
and existing under the laws of the State of Delaware (“Interconnection Customer”) each
hereinafter sometimes referred to individually as “Party” or referred to together as the
“Parties.”
Connecting Transmission Owner Information
Niagara Mohawk Power Corporation d/b/a National Grid
Attention: Kathryn Cox-Arslan Director, Transmission Commercial Address: 40 Sylvan Road
City: Waltham State: MA Zip: 02451 Phone: (781) 907-2406
Fax: (781) 907-5707
Interconnection Customer Information
Innovative/Colonie, LLC
Attention: Dennis Plaster Senior Vice President Operations
Address: 2999 Judge Road
City: Oakfield State: New York Zip: 14125 Phone: 585-948-8580
Fax: 585-948-8584
With copies to:
Innovative/Colonie, LLC c/o Aria Energy Attention: General Counsel
Address: 6280 Dylan Dr #200 City: Novi, MI 48377
Phone: 248-380-3920
Fax: 248-380-2038
Interconnection Customer Application No: N/A
In consideration of the mutual covenants set forth herein, the Parties agree as follows:
1
Effective Date: 9/26/2016 - Docket #: ER16-2287-001 - Page 1
NYISO Agreements --> Service Agreements --> SGIA No. 2293 between National Grid and Innovative/Colonie
Article 1 Scope and Limitations of Agreement
1.1 Applicability
This Small Generator Interconnection Agreement (“SGIA”) shall be used for all
Interconnection Requests submitted under the Small Generator Interconnection Procedures (SGIP) except for those submitted under the 10 kW Inverter Process contained in SGIP
Attachment 5.
1.2 Purpose
This Agreement governs the terms and conditions under which the Interconnection
Customer’s Small Generating Facility will interconnect with, and operate in parallel with, the New York State Transmission System or the Distribution System.
1.3 Scope of Interconnection Service
1.3.1 The Parties understand that the New York Independent System Operator
(“NYISO”) will provide Energy Resource Interconnection Service and/or
Capacity Resource Interconnection Service to Interconnection Customer at the Point of Interconnection.
1.3.2 This Agreement does not constitute an agreement to purchase or deliver the
Interconnection Customer’s power. The purchase or delivery of power and other
services that the Interconnection Customer may require will be covered under
separate agreements, if any, or applicable provisions of NYISO’s or Connecting
Transmission Owner’s tariffs. The Interconnection Customer will be responsible
for separately making all necessary arrangements (including scheduling) for
delivery of electricity in accordance with the applicable provisions of the NYISO
OATT and Connecting Transmission Owner’s tariff. The execution of this
Agreement does not constitute a request for, nor agreement to, provide energy,
any Ancillary Services or Installed Capacity under the NYISO Services Tariff or
any Connecting Transmission Owner’s tariff. If Interconnection Customer wishes
to supply or purchase energy, Installed Capacity or Ancillary Services, then
Interconnection Customer will make application to do so in accordance with the
NYISO Services Tariff or Connecting Transmission Owner’s tariff.
1.4 Limitations
Nothing in this Agreement is intended to affect any other agreement between Connecting
Transmission Owner and the Interconnection Customer, except as otherwise expressly provided
herein.
2
Effective Date: 9/26/2016 - Docket #: ER16-2287-001 - Page 1
NYISO Agreements --> Service Agreements --> SGIA No. 2293 between National Grid and Innovative/Colonie
1.5 Responsibilities of the Parties
1.5.1 The Parties shall perform all obligations of this Agreement in accordance with all
Applicable Laws and Regulations, Operating Requirements, and Good Utility Practice.
1.5.2 The Interconnection Customer shall construct, interconnect, operate and maintain
its Small Generating Facility and construct, operate, and maintain its
Interconnection Facilities in accordance with the applicable manufacturer’s
recommended maintenance schedule, and in accordance with this Agreement, and with Good Utility Practice.
1.5.3 The Connecting Transmission Owner shall construct, operate, and maintain its
Interconnection Facilities and Upgrades covered by this Agreement in accordance with this Agreement, and with Good Utility Practice.
1.5.4 The Interconnection Customer agrees to construct its facilities or systems in
accordance with applicable specifications that meet or exceed those provided by
the National Electrical Safety Code, the American National Standards Institute,
IEEE, Underwriter’s Laboratory, and Operating Requirements in effect at the time
of construction and other applicable national and state codes and standards. The
Interconnection Customer agrees to design, install, maintain, and operate its Small
Generating Facility so as to reasonably minimize the likelihood of a disturbance
adversely affecting or impairing the system or equipment of the Connecting
Transmission Owner or Affected Systems.
1.5.5 The Connecting Transmission Owner and Interconnection Customer shall operate,
maintain, repair, and inspect, and shall be fully responsible for the facilities that it
now or subsequently may own unless otherwise specified in the Attachments to
this Agreement. Each Party shall be responsible for the safe installation,
maintenance, repair and condition of their respective lines and appurtenances on
their respective sides of the point of change of ownership. The Connecting
Transmission Owner and the Interconnection Customer, as appropriate, shall
provide Interconnection Facilities that adequately protect the Connecting
Transmission Owner’s electric system, personnel, and other persons from damage
and injury. The allocation of responsibility for the design, installation, operation,
maintenance and ownership of Interconnection Facilities shall be delineated in the
Attachments to this Agreement.
1.5.6 The Connecting Transmission Owner shall cooperate with the NYISO to
coordinate with all Affected Systems to support the interconnection.
1.6 Parallel Operation Obligations
Once the Small Generating Facility has been authorized to commence parallel operation,
the Interconnection Customer shall abide by all rules and procedures pertaining to the parallel
operation of the Small Generating Facility in the applicable control area, including, but not
limited to: (1) the rules and procedures concerning the operation of generation set forth in the
3
Effective Date: 9/26/2016 - Docket #: ER16-2287-001 - Page 1
NYISO Agreements --> Service Agreements --> SGIA No. 2293 between National Grid and Innovative/Colonie
NYISO tariffs or ISO Procedures or the Connecting Transmission Owner’s tariff; (2) any
requirements consistent with Good Utility Practice or that are necessary to ensure the safe and reliable operation of the Transmission System or Distribution System; and (3) the Operating Requirements set forth in Attachment 5 of this Agreement.
1.7 Metering
The Interconnection Customer shall be responsible for the Connecting Transmission
Owner’s reasonable and necessary cost for the purchase, installation, operation, maintenance,
testing, repair, and replacement of metering and data acquisition equipment specified in
Attachments 2 and 3 of this Agreement. The Interconnection Customer’s metering (and data
acquisition, as required) equipment shall conform to applicable industry rules and Operating
Requirements.
1.8 Reactive Power
1.8.1 The Interconnection Customer shall design its Small Generating Facility to
maintain a composite power delivery at continuous rated power output at the
Point of Interconnection at a power factor within the range established by the
Connecting Transmission Owner on a comparable basis, until NYISO has
established different requirements that apply to all similarly situated generators in the New York Control Area on a comparable basis.
1.8.2 The Parties understand that Interconnection Customer shall be paid by the NYISO
for reactive power, or voltage support service, that the Interconnection Customer
provides from the Small Generating Facility in accordance with Rate Schedule 2
of the NYISO Services Tariff.
1.9 Capitalized Terms
Capitalized terms used herein shall have the meanings specified in the Glossary of Terms in Attachment 1 or the body of this Agreement. Capitalized terms used herein that are not so
defined shall have the meanings specified in Section 32.5 or Attachment S or Attachment X of
the NYISO OATT.
4
Effective Date: 9/26/2016 - Docket #: ER16-2287-001 - Page 1
NYISO Agreements --> Service Agreements --> SGIA No. 2293 between National Grid and Innovative/Colonie
Article 2 Inspection, Testing, Authorization, and Right of Access
2.1 Equipment Testing and Inspection
2.1.1 The Interconnection Customer shall test and inspect its Small Generating Facility
and Interconnection Facilities prior to interconnection. The Interconnection
Customer shall notify the NYISO and the Connecting Transmission Owner of
such activities no fewer than five Business Days (or as may be agreed to by the
Parties) prior to such testing and inspection. Testing and inspection shall occur on
a Business Day. The Connecting Transmission Owner may, at its own expense,
send qualified personnel to the Small Generating Facility site to inspect the
interconnection and observe the testing. The Interconnection Customer shall
provide the NYISO and Connecting Transmission Owner a written test report
when such testing and inspection is completed. The Small Generating Facility
may not commence parallel operations if the NYISO, in consultation with the
Connecting Transmission Owner, finds that the Small Generating Facility has not
been installed as agreed upon or may not be operated in a safe and reliable
manner.
2.1.2 The Connecting Transmission Owner shall, and the NYISO may, provide the
Interconnection Customer written acknowledgment that it has received the
Interconnection Customer’s written test report. Such written acknowledgment
shall not be deemed to be or construed as any representation, assurance,
guarantee, or warranty by the NYISO or Connecting Transmission Owner of the
safety, durability, suitability, or reliability of the Small Generating Facility or any
associated control, protective, and safety devices owned or controlled by the
Interconnection Customer or the quality of power produced by the Small
Generating Facility.
2.2 Authorization Required Prior to Parallel Operation
2.2.1 The Connecting Transmission Owner, in consultation with the NYISO, shall use
Reasonable Efforts to list applicable parallel Operating Requirements in
Attachment 5 of this Agreement. Additionally, the Connecting Transmission
Owner, in consultation with the NYISO, shall notify the Interconnection
Customer of any changes to these requirements as soon as they are known. The
Connecting Transmission Owner shall make Reasonable Efforts to cooperate with
the Interconnection Customer in meeting requirements necessary for the
Interconnection Customer to commence parallel operations by the in-service date.
2.2.2 The Interconnection Customer shall not operate its Small Generating Facility in
parallel with the New York State Transmission System or the Distribution System
without prior written authorization of the NYISO. The Parties understand that the
NYISO, in consultation with the Connecting Transmission Owner, will provide
such authorization once the NYISO receives notification that the Interconnection
Customer has complied with all applicable parallel Operating Requirements.
Such authorization shall not be unreasonably withheld, conditioned, or delayed.
5
Effective Date: 9/26/2016 - Docket #: ER16-2287-001 - Page 1
NYISO Agreements --> Service Agreements --> SGIA No. 2293 between National Grid and Innovative/Colonie
2.3 Right of Access
2.3.1 Upon reasonable notice, the NYISO and/or Connecting Transmission Owner may
send a qualified person to the premises of the Interconnection Customer at or
immediately before the time the Small Generating Facility first produces energy
to inspect the interconnection, and observe the commissioning of the Small
Generating Facility (including any required testing), startup, and operation for a
period of up to three Business Days after initial start-up of the unit. In addition,
the Interconnection Customer shall notify the NYISO and Connecting
Transmission Owner at least five Business Days prior to conducting any on-site
verification testing of the Small Generating Facility.
2.3.2 Following the initial inspection process described above, at reasonable hours, and
upon reasonable notice, or at any time without notice in the event of an
emergency or hazardous condition, the NYISO and Connecting Transmission
Owner each shall have access to the Interconnection Customer’s premises for any
reasonable purpose in connection with the performance of the obligations
imposed on them by this Agreement or if necessary to meet their legal obligation
to provide service to their customers.
2.3.3 Each Party shall be responsible for its own costs associated with following this
article.
6
Effective Date: 9/26/2016 - Docket #: ER16-2287-001 - Page 1
NYISO Agreements --> Service Agreements --> SGIA No. 2293 between National Grid and Innovative/Colonie
Article 3 Effective Date, Term, Termination, and Disconnection
3.1 Effective Date
This Agreement shall become effective upon execution by the Parties subject to
acceptance by FERC (if applicable), or if filed unexecuted, upon the date specified by the FERC. The Connecting Transmission Owner shall promptly file, or cause to be filed, this Agreement with FERC upon execution, if required. If the Agreement is disputed and the Interconnection Customer requests that it be filed with FERC in an unexecuted form, the Connecting
Transmission Owner shall file, or cause to be filed, this Agreement and the Connecting
Transmission Owner shall identify the disputed language.
3.2 Term of Agreement
This Agreement shall become effective on the Effective Date and shall remain in effect
for a period of [ten] years from the Effective Date and shall be automatically renewed for each
successive one-year period thereafter, unless terminated earlier in accordance with article 3.3 of
this Agreement.
3.3 Termination
No termination shall become effective until the Parties have complied with all Applicable
Laws and Regulations applicable to such termination, including the filing with FERC of a notice
of termination of this Agreement (if required), which notice has been accepted for filing by
FERC.
3.3.1 The Interconnection Customer may terminate this Agreement at any time by
giving Connecting Transmission Owner 20 Business Days written notice. The
Connecting Transmission Owner may terminate this Agreement after the Small
Generating Facility is Retired.
3.3.2 Either Party may terminate this Agreement after Default pursuant to article 7.6.
3.3.3 Upon termination of this Agreement, the Small Generating Facility will be
disconnected from the New York State Transmission System or the Distribution System, as applicable. All costs required to effectuate such disconnection shall be borne by the terminating Party, unless such termination resulted from the nonterminating Party’s Default of this SGIA or such non-terminating Party otherwise is responsible for these costs under this SGIA.
3.3.4 The termination of this Agreement shall not relieve either Party of its liabilities
and obligations, owed or continuing at the time of the termination. The
Interconnection Customer shall pay all amounts in excess of any deposit or other
security without interest within 30 calendar days after receipt of the invoice for
such amounts. If the deposit or other security exceeds the invoice, the Connecting
Transmission Owner shall refund such excess within 30 calendar days of the
invoice without interest. If the Interconnection Customer disputes an amount to
be paid the Interconnection Customer shall pay the disputed amount to the
7
Effective Date: 9/26/2016 - Docket #: ER16-2287-001 - Page 1
NYISO Agreements --> Service Agreements --> SGIA No. 2293 between National Grid and Innovative/Colonie
Connecting Transmission Owner or into an interest bearing escrow account,
pending resolution of the dispute in accordance with Article 10 of this Agreement. To the extent the dispute is resolved in the Interconnection Customer’s favor, that portion of the disputed amount will be returned to the Interconnection Customer with interest at rates applicable to refunds under the Commission’s regulations.
To the extent the dispute is resolved in the Connecting Transmission Owner’s
favor, that portion of any escrowed funds and interest will be released to the
Connecting Transmission Owner.
3.3.5 The limitations of liability, indemnification and confidentiality provisions of this
Agreement shall survive termination or expiration of this Agreement.
3.4 Temporary Disconnection
Temporary disconnection shall continue only for so long as reasonably necessary under Good Utility Practice.
3.4.1 Emergency Conditions
“Emergency Condition” shall mean a condition or situation: (1) that in the judgment of
the Party making the claim is imminently likely to endanger life or property; or (2) that, in the
case of the NYISO or Connecting Transmission Owner, is imminently likely (as determined in a
non-discriminatory manner) to cause a material adverse effect on the security of, or damage to
the New York State Transmission System or Distribution System, the Connecting Transmission
Owner’s Interconnection Facilities or the electric systems of others to which the New York State
Transmission System or Distribution System is directly connected; or (3) that, in the case of the
Interconnection Customer, is imminently likely (as determined in a non-discriminatory manner)
to cause a material adverse effect on the security of, or damage to, the Small Generating Facility
or the Interconnection Customer’s Interconnection Facilities. Under Emergency Conditions, the
NYISO or Connecting Transmission Owner may immediately suspend interconnection service
and temporarily disconnect the Small Generating Facility. The Connecting Transmission Owner
shall notify the Interconnection Customer promptly when it becomes aware of an Emergency
Condition that may reasonably be expected to affect the Interconnection Customer’s operation of the Small Generating Facility. The Interconnection Customer shall notify the NYISO and
Connecting Transmission Owner promptly when it becomes aware of an Emergency Condition
that may reasonably be expected to affect the New York State Transmission System or
Distribution System or any Affected Systems. To the extent information is known, the
notification shall describe the Emergency Condition, the extent of the damage or deficiency, the expected effect on the operation of each Party’s facilities and operations, its anticipated duration, and the necessary corrective action.
3.4.2 Routine Maintenance, Construction, and Repair
The NYISO or Connecting Transmission Owner may interrupt interconnection service or curtail the output of the Small Generating Facility and temporarily disconnect the Small
Generating Facility from the New York State Transmission System or Distribution System when necessary for routine maintenance, construction, and repairs on the New York State
8
Effective Date: 9/26/2016 - Docket #: ER16-2287-001 - Page 1
NYISO Agreements --> Service Agreements --> SGIA No. 2293 between National Grid and Innovative/Colonie
Transmission System or Distribution System. NYISO or the Connecting Transmission Owner shall provide the Interconnection Customer with five Business Days notice prior to such
interruption. The Connecting Transmission Owner shall use Reasonable Efforts to coordinate such reduction or temporary disconnection with the Interconnection Customer. The Parties understand that any actions the NYISO is authorized to take under this article 3.4.2 are
conditioned upon the NYISO’s use of Reasonable Efforts to coordinate such reduction or
temporary disconnection with the Interconnection Customer.
3.4.3 Forced Outages
During any forced outage, the NYISO or Connecting Transmission Owner may suspend
interconnection service to the Interconnection Customer to effect immediate repairs on the New
York State Transmission System or the Distribution System. The Connecting Transmission
Owner shall use Reasonable Efforts to provide the Interconnection Customer with prior notice.
If prior notice is not given, the Connecting Transmission Owner shall, upon request, provide the
Interconnection Customer written documentation after the fact explaining the circumstances of
the disconnection.The Parties understand that any suspension or disconnection the NYISO is
authorized to make under this article 3.4.3 are conditioned upon: (i) the NYISO’s use of
Reasonable Efforts to provide the Interconnection Customer with prior notice; and (ii) if prior
notice is not given, the NYISO’s provision to the Interconnection Customer, upon request, of
written documentation after the fact explaining the circumstances of the disconnection.
3.4.4 Adverse Operating Effects
The NYISO or Connecting Transmission Owner shall notify the Interconnection
Customer as soon as practicable if, based on Good Utility Practice, operation of the Small
Generating Facility may cause disruption or deterioration of service to other customers served from the same electric system, or if operating the Small Generating Facility could cause damage to the New York State Transmission System, the Distribution System or Affected Systems, or if disconnection is otherwise required under Applicable Reliability Standards or the NYISO
OATT. Supporting documentation used to reach the decision to disconnect shall be provided to the Interconnection Customer upon request. If, after notice, the Interconnection Customer fails to remedy the adverse operating effect within a reasonable time, the NYISO or Connecting
Transmission Owner may disconnect the Small Generating Facility. The NYISO or Connecting Transmission Owner shall provide the Interconnection Customer with five Business Day notice of such disconnection, unless the provisions of article 3.4.1 apply.
3.4.5 Modification of the Small Generating Facility
The Interconnection Customer must receive written authorization from the NYISO and
Connecting Transmission Owner before making any change to the Small Generating Facility that
may have a material impact on the safety or reliability of the New York State Transmission
System or the Distribution System. Such authorization shall not be unreasonably withheld.
Modifications shall be done in accordance with Good Utility Practice. If the Interconnection
Customer makes such modification without the prior written authorization of the NYISO and
Connecting Transmission Owner, the Connecting Transmission Owner shall have the right to
9
Effective Date: 9/26/2016 - Docket #: ER16-2287-001 - Page 1
NYISO Agreements --> Service Agreements --> SGIA No. 2293 between National Grid and Innovative/Colonie
temporarily disconnect the Small Generating Facility. If disconnected, the Small Generating
Facility will not be reconnected until the unauthorized modifications are authorized or removed.
3.4.6 Reconnection
The Parties shall cooperate with each other to restore the Small Generating Facility,
Interconnection Facilities, and the New York State Transmission System and Distribution
System to their normal operating state as soon as reasonably practicable following a temporary disconnection.
10
Effective Date: 9/26/2016 - Docket #: ER16-2287-001 - Page 1
NYISO Agreements --> Service Agreements --> SGIA No. 2293 between National Grid and Innovative/Colonie
Article 4 Cost Responsibility for Interconnection Facilities and Distribution Upgrades
4.1 Interconnection Facilities
4.1.1 The Interconnection Customer shall pay for the cost of the Interconnection
Facilities itemized in Attachment 2 of this Agreement. The Connecting
Transmission Owner shall provide a best estimate cost, including overheads, for the purchase and construction of its Interconnection Facilities and provide a
detailed itemization of such costs. Costs associated with Interconnection
Facilities may be shared with other entities that may benefit from such facilities by agreement of the Interconnection Customer, such other entities, and the
Connecting Transmission Owner.
4.1.2 The Interconnection Customer shall be responsible for its share of all reasonable
expenses, including overheads, associated with (1) owning, operating,
maintaining, repairing, and replacing its own Interconnection Facilities, and
(2) operating, maintaining, repairing, and replacing the Connecting Transmission
Owner’s Interconnection Facilities, as set forth in Attachment 2 to this
Agreement.
4.2 Distribution Upgrades
The Connecting Transmission Owner shall design, procure, construct, install, and own
the Distribution Upgrades described in Attachment 6 of this Agreement. If the Connecting
Transmission Owner and the Interconnection Customer agree, the Interconnection Customer may
construct Distribution Upgrades that are located on land owned by the Interconnection Customer.
The actual cost of the Distribution Upgrades, including overheads, shall be directly assigned to
the Interconnection Customer. The Interconnection Customer shall be responsible for its share
of all reasonable expenses, including overheads, associated with owning, operating, maintaining,
repairing, and replacing the Distribution Upgrades, as set forth in Attachment 6 to this
Agreement.
11
Effective Date: 9/26/2016 - Docket #: ER16-2287-001 - Page 1
NYISO Agreements --> Service Agreements --> SGIA No. 2293 between National Grid and Innovative/Colonie
Article 5 Cost Responsibility for System Upgrade Facilities and System Deliverability
Upgrades
5.1 Applicability
No portion of this article 5 shall apply unless the interconnection of the Small Generating Facility requires System Upgrade Facilities or System Deliverability Upgrades.
5.2 System Upgrades
The Connecting Transmission Owner shall procure, construct, install, and own the
System Upgrade Facilities and System Deliverability Upgrades described in Attachment 6 of this Agreement. To the extent that design work is necessary in addition to that already accomplished in the Class Year facilities study for the Interconnection Customer, the Connecting Transmission Owner shall perform or cause to be performed such work. If the Parties agree, the
Interconnection Customer may construct System Upgrade Facilities and System Deliverability Upgrades that are located on land owned by the Interconnection Customer.
5.2.1 As described in Section 32.3.5.3 of the SGIP in Attachment Z of the NYISO
OATT, the responsibility of the Interconnection Customer for the cost of the
System Upgrade Facilities and System Deliverability Upgrades described in
Attachment 6 of this Agreement shall be determined in accordance with
Attachment S of the NYISO OATT, as required by Section 32.3.5.3.2 of
Attachment Z. The Interconnection Customer shall be responsible for all System Upgrade Facility costs as required by Section 32.3.5.3.2 of Attachment Z or its share of any System Upgrade Facilities and System Deliverability Upgrades costs resulting from the final Attachment S process, as applicable, and Attachment 6 to this Agreement shall be revised accordingly.
5.2.2 Pending the outcome of the Attachment S cost allocation process, if applicable,
the Interconnection Customer may elect to proceed with the interconnection of its
Small Generating Facility in accordance with Section 32.3.5.3 of the SGIP.
5.3 Special Provisions for Affected Systems
For the repayment of amounts advanced to Affected System Operator for System
Upgrade Facilities or System Deliverability Upgrades, the Interconnection Customer and
Affected System Operator shall enter into an agreement that provides for such repayment, but only if responsibility for the cost of such System Upgrade Facilities is not to be allocated in accordance with Attachment S of the NYISO OATT. The agreement shall specify the terms governing payments to be made by the Interconnection Customer to Affected System Operator as well as the repayment by Affected System Operator.
12
Effective Date: 9/26/2016 - Docket #: ER16-2287-001 - Page 1
NYISO Agreements --> Service Agreements --> SGIA No. 2293 between National Grid and Innovative/Colonie
Article 6 Billing, Payment, Milestones, and Financial Security
6.1 Billing and Payment Procedures and Final Accounting
6.1.1 The Connecting Transmission Owner shall bill the Interconnection Customer for
the design, engineering, construction, and procurement costs of Interconnection
Facilities and Upgrades contemplated by this Agreement on a monthly basis, or as otherwise agreed by the Parties. The Interconnection Customer shall pay all
invoice amounts within 30 calendar days after receipt of the invoice.
6.1.2 Within three months of completing the construction and installation of the
Connecting Transmission Owner’s Interconnection Facilities and/or Upgrades
described in the Attachments to this Agreement, the Connecting Transmission
Owner shall provide the Interconnection Customer with a final accounting report
of any difference between (1) the Interconnection Customer’s cost responsibility
for the actual cost of such facilities or Upgrades, and (2) the Interconnection
Customer’s previous aggregate payments to the Connecting Transmission Owner
for such facilities or Upgrades. If the Interconnection Customer’s cost
responsibility exceeds its previous aggregate payments, the Connecting
Transmission Owner shall invoice the Interconnection Customer for the amount
due and the Interconnection Customer shall make payment to the Connecting
Transmission Owner within 30 calendar days. If the Interconnection Customer’s
previous aggregate payments exceed its cost responsibility under this Agreement,
the Connecting Transmission Owner shall refund to the Interconnection Customer
an amount equal to the difference within 30 calendar days of the final accounting
report.
6.1.3 If the Interconnection Customer disputes an amount to be paid, the
Interconnection Customer shall pay the disputed amount to the Connecting
Transmission Owner or into an interest bearing escrow account, pending
resolution of the dispute in accordance with Article 10 of this Agreement. To the extent the dispute is resolved in the Interconnection Customer’s favor, that portion of the disputed amount will be credited or returned to the Interconnection
Customer with interest at rates applicable to refunds under the Commission’s
regulations. To the extent the dispute is resolved in the Connecting Transmission Owner’s favor, that portion of any escrowed funds and interest will be released to the Connecting Transmission Owner.
6.2 Milestones
Subject to the provisions of the SGIP, the Parties shall agree on milestones for which
each Party is responsible and list them in Attachment 4 of this Agreement. A Party’s obligations
under this provision may be extended by agreement. If a Party anticipates that it will be unable
to meet a milestone for any reason other than a Force Majeure event, it shall immediately notify
the other Party of the reason(s) for not meeting the milestone and (1) propose the earliest
reasonable alternate date by which it can attain this and future milestones, and (2) requesting
appropriate amendments to Attachment 4. The Party affected by the failure to meet a milestone
13
Effective Date: 9/26/2016 - Docket #: ER16-2287-001 - Page 1
NYISO Agreements --> Service Agreements --> SGIA No. 2293 between National Grid and Innovative/Colonie
shall not unreasonably withhold agreement to such an amendment unless: (1) it will suffer
significant uncompensated economic or operational harm from the delay, (2) attainment of the same milestone has previously been delayed, or (3) it has reason to believe that the delay in
meeting the milestone is intentional or unwarranted notwithstanding the circumstances explained by the Party proposing the amendment.
6.3 Financial Security Arrangements
At least 20 Business Days prior to the commencement of the design, procurement,
installation, or construction of a discrete portion of the Connecting Transmission Owner’s
Interconnection Facilities and Upgrades, the Interconnection Customer shall provide the
Connecting Transmission Owner, at the Interconnection Customer’s option, a guarantee, a surety
bond, letter of credit or other form of security that is reasonably acceptable to the Connecting
Transmission Owner and is consistent with the Uniform Commercial Code of the jurisdiction
where the Point of Interconnection is located. Such security for payment shall be in an amount
sufficient to cover the costs for constructing, designing, procuring, and installing the applicable
portion of the Connecting Transmission Owner’s Interconnection Facilities and Upgrades and
shall be reduced on a dollar-for-dollar basis for payments made to the Connecting Transmission
Owner under this Agreement during its term. The Connecting Transmission Owner may draw
on any such security to the extent that the Interconnection Customer fails to make any payments
due under this Agreement. In addition:
6.3.1 The guarantee must be made by an entity that meets the creditworthiness
requirements of the Connecting Transmission Owner, and contain terms and conditions that guarantee payment of any amount that may be due from the Interconnection Customer, up to an agreed-to maximum amount.
6.3.2 The letter of credit or surety bond must be issued by a financial institution or
insurer reasonably acceptable to the Connecting Transmission Owner and must
specify a reasonable expiration date.
6.3.3 Notwithstanding the above, Security posted for System Upgrade Facilities for a
Small Generating Facility required to enter the Class Year process, or cash or
Security provided for System Deliverability Upgrades, shall meet the
requirements for Security contained in Attachment S to the NYISO OATT.
14
Effective Date: 9/26/2016 - Docket #: ER16-2287-001 - Page 1
NYISO Agreements --> Service Agreements --> SGIA No. 2293 between National Grid and Innovative/Colonie
Article 7 Assignment, Liability, Indemnity, Force Majeure, Consequential Damages,
and Default
7.1 Assignment
This Agreement, and each and every term and condition hereof, shall be binding upon and inure to the benefit of the Parties hereto and their respective successors and assigns. This Agreement may be assigned by either Party upon 15 Business Days prior written notice and opportunity to object by the other Party; provided that:
7.1.1 A Party may assign this Agreement without the consent of the other Party to any
affiliate of the assigning Party with an equal or greater credit rating and with the
legal authority and operational ability to satisfy the obligations of the assigning
Party under this Agreement, provided that the Interconnection Customer promptly
notifies the Connecting Transmission Owner of any such assignment. A Party
may assign this Agreement without the consent of the other Party in connection
with the sale, merger, restructuring, or transfer of a substantial portion of all of its
assets, including the Interconnection Facilities it owns, so long as the assignee in
such a transaction directly assumes all rights, duties and obligation arising under
this Agreement.
7.1.2 The Interconnection Customer shall have the right to assign this Agreement,
without the consent of the Connecting Transmission Owner, for collateral security purposes to aid in providing financing for the Small Generating Facility.
7.1.3 Any attempted assignment that violates this article is void and ineffective.
Assignment shall not relieve a Party of its obligations, nor shall a Party’s
obligations be enlarged, in whole or in part, by reason thereof. An assignee is responsible for meeting the same financial, credit, and insurance obligations as the Interconnection Customer. Where required, consent to assignment will not be unreasonably withheld, conditioned or delayed.
7.2 Limitation of Liability
Each Party’s liability to the other Party for any loss, cost, claim, injury, liability, or
expense, including reasonable attorney’s fees, relating to or arising from any act or omission in its performance of this Agreement, shall be limited to the amount of direct damage actually incurred. In no event shall either Party be liable to the other Party for any indirect, special, consequential, or punitive damages.
7.3 Indemnity
7.3.1 This provision protects each Party from liability incurred to third parties as a
result of carrying out the provisions of this Agreement. Liability under this
provision is exempt from the general limitations on liability found in article 7.2.
7.3.2 Each Party (the “Indemnifying Party”) shall at all times indemnify, defend, and
hold harmless the other Party (the “ Indemnified Party”) from, any and all
15
Effective Date: 9/26/2016 - Docket #: ER16-2287-001 - Page 1
NYISO Agreements --> Service Agreements --> SGIA No. 2293 between National Grid and Innovative/Colonie
damages, losses, claims, including claims and actions relating to injury to or death of any person or damage to property, the alleged violation of any Environmental Law, or the release or threatened release of any Hazardous Substance, demand,
suits, recoveries, costs and expenses, court costs, attorney fees, and all other
obligations by or to third parties (any and all of these a “Loss”), arising out of or resulting from (i) the Indemnified Party’s performance under this Agreement on
behalf of the Indemnifying Party, except in cases where the Indemnifying Party
can demonstrate that the Loss of the Indemnified Party was caused by the gross
negligence or intentional wrongdoing by the Indemnified Party or (ii) the
violation by the Indemnifying Party of any Environmental Law or the release by the Indemnifying Party of a Hazardous Substance.
7.3.3 If a Party is entitled to indemnification under this article as a result of a claim by a
third party, and the Indemnifying Party fails, after notice and reasonable
opportunity to proceed under this article, to assume the defense of such claim,
such Indemnified Party may at the expense of the Indemnifying Party contest,
settle or consent to the entry of any judgment with respect to, or pay in full, such
claim.
7.3.4 If an Indemnifying Party is obligated to indemnify and hold an Indemnified Party
harmless under this article, the amount owing to the Indemnified Party shall be
the amount of such Indemnified Party’s actual loss, net of any insurance or other
recovery.
7.3.5 Promptly after receipt by an Indemnified Party of any claim or notice of the
commencement of any action or administrative or legal proceeding or
investigation as to which the indemnity provided for in this article may apply, the
Indemnified Party shall notify the Indemnifying Party of such fact. Any failure of
or delay in such notification shall not affect a Party’s indemnification obligation
unless such failure or delay is materially prejudicial to the Indemnifying Party.
7.4 Consequential Damages
Other than as expressly provided for in this Agreement, no Party shall be liable under any provision of this Agreement for any losses, damages, costs or expenses for any special, indirect, incidental, consequential, or punitive damages, including but not limited to loss of profit or
revenue, loss of the use of equipment, cost of capital, cost of temporary equipment or services,
whether based in whole or in part in contract, in tort, including negligence, strict liability, or any other theory of liability; provided, however, that damages for which a Party may be liable to the other Party under another agreement will not be considered to be special, indirect, incidental, or
consequential damages hereunder.
7.5 Force Majeure
7.5.1 As used in this article, a Force Majeure Event shall mean “any act of God, labor
disturbance, act of the public enemy, war, insurrection, riot, fire, storm or flood,
explosion, breakage or accident to machinery or equipment, any order, regulation
16
Effective Date: 9/26/2016 - Docket #: ER16-2287-001 - Page 1
NYISO Agreements --> Service Agreements --> SGIA No. 2293 between National Grid and Innovative/Colonie
or restriction imposed by governmental, military or lawfully established civilian
authorities, or any other cause beyond a Party’s control. A Force Majeure Event
does not include an act of negligence or intentional wrongdoing.” For the
purposes of this article, this definition of Force Majeure shall supersede the
definitions of Force Majeure set out in Section 32.10.1 of the NYISO OATT.
7.5.2 If an event of Force Majeure prevents a Party from fulfilling any obligations
under this Agreement, the Party affected by the Force Majeure event (Affected
Party) shall promptly notify the other Party, either in writing or via the telephone,
of the existence of the Force Majeure event. The notification must specify in
reasonable detail the circumstances of the Force Majeure event, its expected
duration, and the steps that the Affected Party is taking to mitigate the effects of
the event on its performance. The Affected Party shall keep the other Party
informed on a continuing basis of developments relating to the Force Majeure
event until the event ends. The Affected Party will be entitled to suspend or
modify its performance of obligations under this Agreement (other than the
obligation to make payments) only to the extent that the effect of the Force
Majeure event cannot be mitigated by the use of Reasonable Efforts. The
Affected Party will use Reasonable Efforts to resume its performance as soon as
possible.
7.6 Breach and Default
7.6.1 No Breach of this Agreement shall exist where such failure to discharge an
obligation (other than the payment of money) is the result of a Force Majeure
event or the result of an act or omission of the other Party. Upon a Breach, the
non-breaching Party shall give written notice of such Breach to the Breaching
Party. Except as provided in article 7.6.2, the Breaching Party shall have 60
calendar days from receipt of the Breach notice within which to cure such Breach;
provided however, if such Breach is not capable of cure within 60 calendar days,
the Breaching Party shall commence such cure within 20 calendar days after
notice and continuously and diligently complete such cure within six months from
receipt of the Breach notice; and, if cured within such time, the Breach specified
in such notice shall cease to exist.
7.6.2 If a Breach is not cured as provided in this article, or if a Breach is not capable of
being cured within the period provided for herein, a Default shall exist and the
non-defaulting Party acting together shall thereafter have the right to terminate
this Agreement, in accordance with article 3.3 hereof, by written notice to the
Defaulting Party at any time until cure occurs, and be relieved of any further
obligation hereunder and, whether or not that Party terminates this Agreement, to
recover from the Defaulting Party all amounts due hereunder, plus all other
damages and remedies to which they are entitled at law or in equity. The
provisions of this article shall survive termination of this Agreement.
7.6.3 In cases where the Interconnection Customer has elected to proceed under
Section 32.3.5.3 of the SGIP, if the Interconnection Request is withdrawn or
17
Effective Date: 9/26/2016 - Docket #: ER16-2287-001 - Page 1
NYISO Agreements --> Service Agreements --> SGIA No. 2293 between National Grid and Innovative/Colonie
deemed withdrawn pursuant to the SGIP during the term of this Agreement, this Agreement shall terminate.
18
Effective Date: 9/26/2016 - Docket #: ER16-2287-001 - Page 1
NYISO Agreements --> Service Agreements --> SGIA No. 2293 between National Grid and Innovative/Colonie
Article 8 Insurance
8.1 The Interconnection Customer shall, at its own expense, maintain in force general
liability insurance without any exclusion for liabilities related to the interconnection
undertaken pursuant to this Agreement. The amount of such insurance shall be sufficient
to insure against all reasonably foreseeable direct liabilities given the size and nature of
the generating equipment being interconnected, the interconnection itself, and the
characteristics of the system to which the interconnection is made. Such insurance
coverage is specified in Attachment 7 to this Agreement. The Interconnection Customer
shall obtain additional insurance only if necessary as a function of owning and operating
a generating facility. Such insurance shall be obtained from an insurance provider
authorized to do business in New York State where the interconnection is located.
Certification that such insurance is in effect shall be provided upon request of the
Connecting Transmission Owner, except that the Interconnection Customer shall show
proof of insurance to the Connecting Transmission Owner no later than ten Business
Days prior to the anticipated commercial operation date. An Interconnection Customer
of sufficient creditworthiness may propose to self-insure for such liabilities, and such a
proposal shall not be unreasonably rejected.
8.2 Connecting Transmission Owner agrees to maintain general liability insurance or self-
insurance consistent with the existing commercial practice. Such insurance or self-
insurance shall not exclude the liabilities undertaken pursuant to this Agreement.
8.3 The Parties further agree to notify one another whenever an accident or incident occurs
resulting in any injuries or damages that are included within the scope of coverage of such insurance, whether or not such coverage is sought.
19
Effective Date: 9/26/2016 - Docket #: ER16-2287-001 - Page 1
NYISO Agreements --> Service Agreements --> SGIA No. 2293 between National Grid and Innovative/Colonie
Article 9 Confidentiality
9.1 Confidential Information shall mean any confidential and/or proprietary information
provided by one Party to the other Party that is clearly marked or otherwise designated
“Confidential.” For purposes of this Agreement all design, operating specifications, and
metering data provided by the Interconnection Customer shall be deemed Confidential
Information regardless of whether it is clearly marked or otherwise designated as such.
Confidential Information shall include, without limitation, information designated as
such by the NYISO Code of Conduct contained in Attachment F to the NYISO OATT.
9.2 Confidential Information does not include information previously in the public domain,
required to be publicly submitted or divulged by Governmental Authorities (after notice
to the other Party and after exhausting any opportunity to oppose such publication or
release), or necessary to be divulged in an action to enforce this Agreement. Each Party
receiving Confidential Information shall hold such information in confidence and shall
not disclose it to any third party nor to the public without the prior written authorization
from the Party providing that information, except to fulfill obligations under this
Agreement, or to fulfill legal or regulatory requirements.
9.2.1 Each Party shall employ at least the same standard of care to protect Confidential
Information obtained from the other Party as it employs to protect its own Confidential Information.
9.2.2 Each Party is entitled to equitable relief, by injunction or otherwise, to enforce its
rights under this provision to prevent the release of Confidential Information
without bond or proof of damages, and may seek other remedies available at law or in equity for breach of this provision.
9.3 Notwithstanding anything in this article to the contrary, and pursuant to 18 CFR §
lb.20, if FERC, during the course of an investigation or otherwise, requests
information from the other Party that is otherwise required to be maintained in
confidence pursuant to this Agreement, the Party shall provide the requested
information to FERC, within the time provided for in the request for information.
In providing the information to FERC, the Party may, consistent with 18 CFR §
388.112, request that the information be treated as confidential and non-public by
FERC and that the information be withheld from public disclosure. Each Party is
prohibited from notifying the other Party to this Agreement prior to the release of
the Confidential Information to FERC. The Party shall notify the other Party to
this Agreement when it is notified by FERC that a request to release Confidential
Information has been received by FERC, at which time either of the Parties may
respond before such information would be made public, pursuant to 18 CFR §
388.112. Requests from a state regulatory body conducting a confidential
investigation shall be treated in a similar manner if consistent with the applicable
state rules and regulations.
9.4 Consistent with the provisions of this article 9, the Parties to this Agreement will
cooperate in good faith to provide each other, Affected Systems, Affected System
20
Effective Date: 9/26/2016 - Docket #: ER16-2287-001 - Page 1
NYISO Agreements --> Service Agreements --> SGIA No. 2293 between National Grid and Innovative/Colonie
Operators, and state and federal regulators the information necessary to carry out the terms of the SGIP and this Agreement.
21
Effective Date: 9/26/2016 - Docket #: ER16-2287-001 - Page 1
NYISO Agreements --> Service Agreements --> SGIA No. 2293 between National Grid and Innovative/Colonie
Article 10 Disputes
10.1 The Connecting Transmission Owner and Interconnection Customer agree to attempt to
resolve all disputes arising out of the interconnection process according to the provisions of this article.
10.2 In the event of a dispute, the Parties will first attempt to promptly resolve it on an
informal basis. If the Parties cannot promptly resolve the dispute on an informal basis, then either Party shall provide the other Party with a written Notice of Dispute. Such Notice shall describe in detail the nature of the dispute.
10.3 If the dispute has not been resolved within two Business Days after receipt of the Notice,
either Party may contact FERC’s Dispute Resolution Service (DRS) for assistance in resolving the dispute.
10.4 The DRS will assist the Parties in either resolving their dispute or in selecting an
appropriate dispute resolution venue (e.g., mediation, settlement judge, early neutral
evaluation, or technical expert) to assist the Parties in resolving their dispute. The result of this dispute resolution process will be binding only if the Parties agree in advance. DRS can be reached at 1-877-337-2237 or via the internet at
http://www.ferc.gov/legal/adr.asp.
10.5 Each Party agrees to conduct all negotiations in good faith and will be responsible for
one-half of any costs paid to neutral third-parties.
10.6 If either Party elects to seek assistance from the DRS, or if the attempted dispute
resolution fails, then either Party may exercise whatever rights and remedies it may have in equity or law consistent with the terms of this Agreement.
22
Effective Date: 9/26/2016 - Docket #: ER16-2287-001 - Page 1
NYISO Agreements --> Service Agreements --> SGIA No. 2293 between National Grid and Innovative/Colonie
Article 11 Taxes
11.1 The Parties agree to follow all applicable tax laws and regulations, consistent with FERC
policy and Internal Revenue Service requirements.
11.2 Each Party shall cooperate with the other Party to maintain the other Party’s tax status.
Nothing in this Agreement is intended to adversely affect the tax status of either Party or the status of any Connecting Transmission Owner with respect to the issuance of bonds including, but not limited to, Local Furnishing Bonds. Notwithstanding any other
provisions of this Agreement, LIPA, NYPA and Consolidated Edison Company of New York, Inc. shall not be required to comply with any provisions of this Agreement that
would result in the loss of tax-exempt status of any of their Tax-Exempt Bonds or impair their ability to issue future tax-exempt obligations. For purposes of this provision, TaxExempt Bonds shall include the obligations of the Long Island Power Authority, NYPA and Consolidated Edison Company of New York, Inc., the interest on which is not
included in gross income under the Internal Revenue Code.
11.3 LIPA and NYPA do not waive their exemptions, pursuant to Section 201(f) of the FPA,
from Commission jurisdiction with respect to the Commission’s exercise of the FPA’s general ratemaking authority.
11.4 Any payments due to the Connecting Transmission Owner under this Agreement shall be
adjusted to include any tax liability incurred by the Connecting Transmission Owner with respect to the interconnection request which is the subject of this Agreement. Such
adjustments shall be made in accordance with the provisions of Article 5.17 of the LGIA in Attachment X of the NYISO OATT. Except where otherwise noted, all costs,
deposits, financial obligations and the like specified in this Agreement shall be assumed not to reflect the impact of applicable taxes.
23
Effective Date: 9/26/2016 - Docket #: ER16-2287-001 - Page 1
NYISO Agreements --> Service Agreements --> SGIA No. 2293 between National Grid and Innovative/Colonie
Article 12 Miscellaneous
12.1 Governing Law, Regulatory Authority, and Rules
The validity, interpretation and enforcement of this Agreement and each of its provisions shall be governed by the laws of the state of New York, without regard to its conflicts of law principles. This Agreement is subject to all Applicable Laws and Regulations. Each Party
expressly reserves the right to seek changes in, appeal, or otherwise contest any laws, orders, or regulations of a Governmental Authority.
12.2 Amendment
The Parties may amend this Agreement by a written instrument duly executed by the Parties, or under article 12.12 of this Agreement.
12.3 No Third-Party Beneficiaries
This Agreement is not intended to and does not create rights, remedies, or benefits of any character whatsoever in favor of any persons, corporations, associations, or entities other than the Parties, and the obligations herein assumed are solely for the use and benefit of the Parties, their successors in interest and where permitted, their assigns. Notwithstanding the foregoing, any
subcontractor of the Connecting Transmission Owner assisting that Party with the
Interconnection Request covered by this Agreement shall be entitled to the benefits of
indemnification provided for under Article 7.3 of this Agreement and the limitation of liability
provided for in Article 7.2 of this Agreement.
12.4 Waiver
12.4.1 The failure of a Party to this Agreement to insist, on any occasion, upon strict
performance of any provision of this Agreement will not be considered a waiver of any obligation, right, or duty of, or imposed upon, such Party.
12.4.2 Any waiver at any time by a Party of its rights with respect to this Agreement
shall not be deemed a continuing waiver or a waiver with respect to any other
failure to comply with any other obligation, right, duty of this Agreement.
Termination or default of this Agreement for any reason by Interconnection
Customer shall not constitute a waiver of the Interconnection Customer’s legal
rights to obtain an interconnection from the NYISO. Any waiver of this
Agreement shall, if requested, be provided in writing.
12.5 Entire Agreement
This Agreement, including all Attachments, constitutes the entire agreement between the Parties with reference to the subject matter hereof, and supersedes all prior and contemporaneous understandings or agreements, oral or written, between the Parties with respect to the subject matter of this Agreement. There are no other agreements, representations, warranties, or
covenants which constitute any part of the consideration for, or any condition to, either Party’s compliance with its obligations under this Agreement.
24
Effective Date: 9/26/2016 - Docket #: ER16-2287-001 - Page 1
NYISO Agreements --> Service Agreements --> SGIA No. 2293 between National Grid and Innovative/Colonie
12.6 Multiple Counterparts
This Agreement may be executed in two or more counterparts, each of which is deemed an original but all constitute one and the same instrument.
12.7 No Partnership
This Agreement shall not be interpreted or construed to create an association, joint
venture, agency relationship, or partnership between the Parties or to impose any partnership
obligation or partnership liability upon either Party. No Party shall have any right, power or
authority to enter into any agreement or undertaking for, or act on behalf of, or to act as or be an agent or representative of, or to otherwise bind, the other Party.
12.8 Severability
If any provision or portion of this Agreement shall for any reason be held or adjudged to be invalid or illegal or unenforceable by any court of competent jurisdiction or other
Governmental Authority, (1) such portion or provision shall be deemed separate and
independent, (2) the Parties shall negotiate in good faith to restore insofar as practicable the
benefits to each Party that were affected by such ruling, and (3) the remainder of this Agreement shall remain in full force and effect.
12.9 Security Arrangements
Infrastructure security of electric system equipment and operations and control hardware and software is essential to ensure day-to-day reliability and operational security. FERC expects the NYISO, the Connecting Transmission Owner, Market Participants, and Interconnection
Customers interconnected to electric systems to comply with the recommendations offered by
the President’s Critical Infrastructure Protection Board and, eventually, best practice
recommendations from the electric reliability authority. All public utilities are expected to meet basic standards for system infrastructure and operational security, including physical,
operational, and cyber-security practices.
12.10 Environmental Releases
Each Party shall notify the other Party, first orally and then in writing, of the release of
any hazardous substances, any asbestos or lead abatement activities, or any type of remediation
activities related to the Small Generating Facility or the Interconnection Facilities, each of which
may reasonably be expected to affect the other Party. The notifying Party shall (1) provide the
notice as soon as practicable, provided such Party makes a good faith effort to provide the notice
no later than 24 hours after such Party becomes aware of the occurrence, and (2) promptly
furnish to the other Party copies of any publicly available reports filed with any governmental authorities addressing such events.
12.11 Subcontractors
Nothing in this Agreement shall prevent a Party from utilizing the services of any
subcontractor as it deems appropriate to perform its obligations under this Agreement; provided,
25
Effective Date: 9/26/2016 - Docket #: ER16-2287-001 - Page 1
NYISO Agreements --> Service Agreements --> SGIA No. 2293 between National Grid and Innovative/Colonie
however, that each Party shall require its subcontractors to comply with all applicable terms and conditions of this Agreement in providing such services and each Party shall remain primarily liable to the other Party for the performance of such subcontractor.
12.11.1 The creation of any subcontract relationship shall not relieve the hiring
Party of any of its obligations under this Agreement. The hiring Party
shall be fully responsible to the other Party to the extent provided for in
Sections 32.7.2 and 32.7.3 above for the acts or omissions of any
subcontractor the hiring Party hires as if no subcontract had been made;
provided, however, that in no event shall Connecting Transmission Owner
be liable for the actions or inactions of the Interconnection Customer or its
subcontractors with respect to obligations of the Interconnection Customer
under this Agreement. Any applicable obligation imposed by this
Agreement upon the hiring Party shall be equally binding upon, and shall
be construed as having application to, any subcontractor of such Party.
12.11.2 The obligations under this article will not be limited in any way by any
limitation of subcontractor’s insurance.
12.12 Reservation of Rights
Nothing in this Agreement shall alter the right of Connecting Transmission Owner to
make unilateral filings with FERC to modify this Agreement with respect to any rates, terms and conditions, charges, classifications of service, rule or regulation under Section 205 or any other applicable provision of the Federal Power Act and FERC’s rules and regulations thereunder
which rights are expressly reserved herein, and the existing rights of the Interconnection
Customer to make a unilateral filing with FERC to modify this Agreement under any applicable provision of the Federal Power Act and FERC’s rules and regulations are also expressly reserved herein; provided that each Party shall have the right to protest any such filing by the other Party and to participate fully in any proceeding before FERC in which such modifications may be
considered. Nothing in this Agreement shall limit the rights of the Parties or of FERC under
Sections 205 or 206 of the Federal Power Act and FERC’s rules and regulations, except to the
extent that the Parties otherwise agree as provided herein.
26
Effective Date: 9/26/2016 - Docket #: ER16-2287-001 - Page 1
NYISO Agreements --> Service Agreements --> SGIA No. 2293 between National Grid and Innovative/Colonie
Article 13 Notices
13.1 General
Unless otherwise provided in this Agreement, any written notice, demand, or request required or authorized in connection with this Agreement (“Notice”) shall be deemed properly given if delivered in person, delivered by recognized national currier service, or sent by first class mail, postage prepaid, to the person specified below:
If to the Interconnection Customer:
Innovative/Colonie, LLC
Attention: Dennis Plaster Senior Vice President Operations
Address: 2999 Judge Road
City: Oakfield State: New York Zip: 14125 Phone: 585-948-8580
Fax: 585-948-8584
If to the Connecting Transmission Owner:
Niagara Mohawk Power Corporation d/b/a/ National Grid
Attention: Kathryn Cox-Arslan, Director, Transmission Commercial Address:40 Sylvan Road
City: Waltham State: MA Zip: 02451
Phone: (781) 907-2406
Fax: (781) 907-5707
E-mail: Kathryn.cox@nationalgrid.com
If to the NYISO:
Before commercial operation of the Small Generating Facility:
Attention: Vice President, System and Resource Planning
Address: New York Independent System Operator, Inc., 10 Krey Boulevard
City: Rensselaer State: NY Zip: 12144
Phone: (518) 356-6000
Fax: (518) 356-6118
After commercial operation of the Small Generating Facility:
Attention: Vice President, Operations
Address: New York Independent System Operator, Inc., 3890 Carman Road City: Schenectady State: NY Zip: 12303
Phone: (518) 356-6000
Fax: (518) 356-6118
13.2 Billing and Payment
Billings and payments shall be sent to the addresses set out below:
27
Effective Date: 9/26/2016 - Docket #: ER16-2287-001 - Page 1
NYISO Agreements --> Service Agreements --> SGIA No. 2293 between National Grid and Innovative/Colonie
Interconnection Customer: Innovative/Colonie, LLC c/o Aria Energy
Attention: Accounting Payables
Address: 6280 Dylan Dr #200, City: Novi, State: MI, Zip: 48377
Connecting Transmission Owner: Niagara Mohawk Corporation d/b/a National Grid
Attention: William L. Malee, Director, Transmission Commercial
Address: 40 Sylvan Road
City: Waltham State: MA Zip: 02451
E-mail: bill.malee@nationalgrid.com
13.3 Alternative Forms of Notice
Any notice or request required or permitted to be given by either Party to the other and
not required by this Agreement to be given in writing may be so given by telephone, facsimile or e-mail to the telephone numbers and e-mail addresses set out below:
If to the Interconnection Customer:
[Innovative / Colonie,LLC c/o Aria Energy
Attention: Dennis Plaster Senior Vice President Operations Address: 2999 Judge Road
City: Oakfield State: New York Zip: 14125 Phone: 585-948-8580
Fax: 585-948-8584
If to the Connecting Transmission Owner:
Niagara Mohawk Power Corporation d/b/a National Grid
Attention: Kathryn Cox-Arslan, Director, Transmission Commercial Address: 40 Sylvan Road
City: Waltham State: MA Zip: 02451
Phone: (781) 907-2406
Fax: (781) 907-5707
E-mail: Kathryn.cox@nationalgrid.com
If to the NYISO:
Before commercial operation of the Small Generating Facility:
Attention: Vice President, System and Resource Planning
Address: New York Independent System Operator, Inc., 10 Krey Boulevard
City: Rensselaer State: NY Zip: 12144
Phone: (518) 356-6000
Fax: (518) 356-6118
28
Effective Date: 9/26/2016 - Docket #: ER16-2287-001 - Page 1
NYISO Agreements --> Service Agreements --> SGIA No. 2293 between National Grid and Innovative/Colonie
After commercial operation of the Small Generating Facility:
Attention: Vice President, Operations
Address: New York Independent System Operator, Inc., 3890 Carman Road City: Schenectady State: NY Zip: 12303
Phone: (518) 356-6000
Fax: (518) 356-6118
13.4 Designated Operating Representative
The Parties may also designate operating representatives to conduct the communications
which may be necessary or convenient for the administration of this Agreement. This person
will also serve as the point of contact with respect to operations and maintenance of the Party’s
facilities.
Interconnection Customer’s Operating Representative:
Innovative/Colonie, LLC
Attention: Dennis Plaster Senior Vice President Operations
Address: 2999 Judge Road
City: Oakfield State: New York Zip: 14125 Phone: 585-948-8580
Fax: 585-948-8584
With copies to:
Innovative/Colonie, LLC c/o Aria Energy Attention: General Counsel
Address: 6280 Dylan Dr #200 City: Novi, MI 48377
Phone: 248-380-3920
Fax: 248-380-2038
Connecting Transmission Owner’s Operating Representative:
Niagara Mohawk Corporation d/b/a National Grid Attention: Kathryn Cox-Arslan
Address: 40 Sylvan Road
City: Waltham State: MA Zip: 02451
Phone: (781) 907-2406
Fax: (781) 907-5707
E-mail: Kathryn.cox@nationalgrid.com
NYISO’s Operating Representative:
Before commercial operation of the Small Generating Facility:
29
Effective Date: 9/26/2016 - Docket #: ER16-2287-001 - Page 1
NYISO Agreements --> Service Agreements --> SGIA No. 2293 between National Grid and Innovative/Colonie
Attention: Vice President, System and Resource Planning
Address: New York Independent System Operator, Inc., 10 Krey Boulevard
City: Rensselaer State: NY Zip: 12144
Phone: (518) 356-6000
Fax: (518) 356-6118
After commercial operation of the Small Generating Facility:
Attention: Vice President, Operations
Address: New York Independent System Operator, Inc., 3890 Carman Road City: Schenectady State: NY Zip: 12303
Phone: (518) 356-6000
Fax: (518) 356-6118
13.5 Changes to the Notice Information
Either Party may change this information by giving five Business Days written notice prior to the effective date of the change.
30
Effective Date: 9/26/2016 - Docket #: ER16-2287-001 - Page 1
NYISO Agreements --> Service Agreements --> SGIA No. 2293 between National Grid and Innovative/Colonie
Article 14 Signatures
IN WITNESS WHEREOF, the Parties have caused this Agreement to be executed by their respective duly authorized representatives.
31
Effective Date: 9/26/2016 - Docket #: ER16-2287-001 - Page 1
NYISO Agreements --> Service Agreements --> SGIA No. 2293 between National Grid and Innovative/Colonie
Attachment 1
Glossary of Terms
Affected System -An electric system other than the transmission system owned, controlled or operated by the Connecting Transmission Owner that may be affected by the proposed
interconnection.
Affected System Operator- Affected System Operator shall mean the operator of any Affected
System.
Affected Transmission Owner -- The New York public utility or authority (or its designated agent) other than the Connecting Transmission Owner that (i) owns facilities used for the
transmission of Energy in interstate commerce and provides Transmission Service under the Tariff, and (ii) owns, leases or otherwise possesses an interest in a portion of the New York State Transmission System where System Deliverability Upgrades or System Upgrade Facilities are installed pursuant to Attachment Z and Attachment S to the NYISO OATT.
Applicable Laws and Regulations -All duly promulgated applicable federal, state and local
laws, regulations, rules, ordinances, codes, decrees, judgments, directives, or judicial or
administrative orders, permits and other duly authorized actions of any Governmental Authority, including but not limited to Environmental Law.
Applicable Reliability Standards - The criteria, requirements and guidelines of the North
American Electric Reliability Council, the Northeast Power Coordinating Council, the New York State Reliability Council and related and successor organizations, or the Transmission District to which the Interconnection Customer’s Small Generating Facility is directly interconnected, as
those criteria, requirements and guidelines are amended and modified and in effect from time to time; provided that no Party shall waive its right to challenge the applicability of or validity of any criterion, requirement or guideline as applied to it in the context of Attachment Z to the
NYISO OATT and this Agreement. For the purposes of this Agreement, this definition of
Applicable Reliability Standards shall supersede the definition of Applicable Reliability
Standards set out in Attachment X to the NYISO OATT.
Base Case -- The base case power flow, short circuit, and stability data bases used for the
Interconnection Studies by NYISO, Connecting Transmission Owner or Interconnection
Customer; described in Section 32.2.3 of the Large Facility Interconnection Procedures.
Breach - The failure of a Party to perform or observe any material term or condition of this Agreement.
Business Day -Monday through Friday, excluding federal holidays.
Capacity Resource Interconnection Service -- The service provided by NYISO to
interconnect the Interconnection Customer’s Small Generating Facility to the New York State
Transmission System or Distribution System in accordance with the NYISO Deliverability
Effective Date: 9/26/2016 - Docket #: ER16-2287-001 - Page 1
NYISO Agreements --> Service Agreements --> SGIA No. 2293 between National Grid and Innovative/Colonie
Interconnection Standard, to enable the New York State Transmission System to deliver electric capacity from the Small Generating Facility, pursuant to the terms of the NYISO OATT.
Connecting Transmission Owner - The New York public utility or authority (or its designated agent) that (i) owns facilities used for the transmission of Energy in interstate commerce and provides Transmission Service under the Tariff, (ii) owns, leases or otherwise possesses an
interest in the portion of the New York State Transmission System or Distribution System at the Point of Interconnection, and (iii) is a Party to this SGIA.
Deliverability Interconnection Standard - The standard that must be met by any Small
Generating Facility larger than 2MW proposing to interconnect to the New York State
Transmission System or Distribution System and to become a qualified Installed Capacity
Supplier, and must be met by any merchant transmission project proposing to interconnect to the
New York State Transmission System and receive Unforced Capacity Delivery Rights. To meet
the NYISO Deliverability Interconnection Standard, the Interconnection Customer must, in
accordance with the rules in Attachment S to the NYISO OATT, fund or commit to fund the
System Deliverability Upgrades identified for its project in the Class Year Deliverability Study.
Default -The failure of a Party in Breach of this Agreement to cure such Breach under this
SGIA.
Distribution System -The Transmission Owner’s facilities and equipment used to distribute electricity that are subject to FERC jurisdiction, and are subject to the NYISO’s LGIP or SGIP under FERC Order Nos. 2003 and/or 2006. For the purpose of this Agreement, the term
Distribution System shall not include LIPA’s distribution facilities.
Distribution Upgrades -The additions, modifications, and upgrades to the Connecting
Transmission Owner’s Distribution System at or beyond the Point of Interconnection to facilitate interconnection of the Small Generating Facility and render the transmission service necessary to effect the Interconnection Customer’s wholesale sale of electricity in interstate commerce.
Distribution Upgrades do not include Interconnection Facilities or System Upgrade Facilities or System Deliverability Upgrades.
Energy Resource Interconnection Service - The service provided by NYISO to interconnect
the Interconnection Customer’s Small Generating Facility to the New York State Transmission
System or Distribution System in accordance with the NYISO Minimum Interconnection
Standard, to enable the New York State Transmission System to receive Energy and Ancillary
Services from the Small Generating Facility, pursuant to the terms of the NYISO OATT.
Force Majeure - Any act of God, labor disturbance, act of the public enemy, war, insurrection,
riot, fire, storm or flood, explosion, breakage or accident to machinery or equipment, any order,
regulation or restriction imposed by governmental, military or lawfully established civilian
authorities, or any other cause beyond a Party’s control. A Force Majeure event does not include
an act of negligence or intentional wrongdoing. For the purposes of this Agreement, this
definition of Force Majeure shall supersede the definitions of Force Majeure set out in Section
32.2.11 of the NYISO Open Access Transmission Tariff.
Effective Date: 9/26/2016 - Docket #: ER16-2287-001 - Page 1
NYISO Agreements --> Service Agreements --> SGIA No. 2293 between National Grid and Innovative/Colonie
Good Utility Practice - Any of the practices, methods and acts engaged in or approved by a
significant portion of the electric industry during the relevant time period, or any of the practices,
methods and acts which, in the exercise of reasonable judgment in light of the facts known at the
time the decision was made, could have been expected to accomplish the desired result at a
reasonable cost consistent with good business practices, reliability, safety and expedition. Good
Utility Practice is not intended to be limited to the optimum practice, method, or act to the
exclusion of all others, but rather to be acceptable practices, methods, or acts generally accepted
in the region.
Governmental Authority -Any federal, state, local or other governmental regulatory or
administrative agency, court, commission, department, board, or other governmental subdivision, legislature, rulemaking board, tribunal, or other governmental authority having jurisdiction over the Parties, their respective facilities, or the respective services they provide, and exercising or entitled to exercise any administrative, executive, police, or taxing authority or power; provided, however, that such term does not include the Interconnection Customer, NYISO, Affected
Transmission Owner, Connecting Transmission Owner or any Affiliate thereof.
Interconnection Customer -Any entity, including the Transmission Owner or any of the
affiliates or subsidiaries, that proposes to interconnect its Small Generating Facility with the New York State Transmission System or the Distribution System.
Interconnection Facilities -The Connecting Transmission Owner’s Interconnection Facilities and the Interconnection Customer’s Interconnection Facilities. Collectively, Interconnection Facilities include all facilities and equipment between the Small Generating Facility and the
Point of Interconnection, including any modification, additions or upgrades that are necessary to physically and electrically interconnect the Small Generating Facility to the New York State
Transmission System or the Distribution System. Interconnection Facilities are sole use facilities and shall not include Distribution Upgrades or System Upgrade Facilities.
Interconnection Request -The Interconnection Customer’s request, in accordance with the
Tariff, to interconnect a new Small Generating Facility, or to materially increase the capacity of,
or make a material modification to the operating characteristics of, an existing Small Generating
Facility that is interconnected with the New York State Transmission System or the Distribution
System. For the purposes of this Agreement, this definition of Interconnection Request shall
supersede the definition of Interconnection Request set out in Attachment X to the NYISO
OATT.
Interconnection Study - Any study required to be performed under Sections 32.2 or 32.3 of the
SGIP.
Material Modification -A modification that has a material impact on the cost or timing of any Interconnection Request with a later queue priority date.
Minimum Interconnection Standard -The reliability standard that must be met by any Small
Generating Facility proposing to connect to the New York State Transmission System or
Distribution System. The Standard is designed to ensure reliable access by the proposed project
Effective Date: 9/26/2016 - Docket #: ER16-2287-001 - Page 1
NYISO Agreements --> Service Agreements --> SGIA No. 2293 between National Grid and Innovative/Colonie
to the New York State Transmission System. The Standard does not impose any deliverability test or deliverability requirement on the proposed interconnection.
New York State Transmission System -New York State Transmission System shall mean the
entire New York State electric transmission system, which includes: (i) the Transmission
Facilities under ISO Operational Control; (ii) the Transmission Facilities Requiring ISO
Notification; and (iii) all remaining transmission facilities within the New York Control Area.
Operating Requirements -Any operating and technical requirements that may be applicable due to Regional Transmission Organization, Independent System Operator, control area, or the Connecting Transmission Owner’s requirements, including those set forth in this SGIA.
Operating Requirements shall include Applicable Reliability Standards.
Party or Parties -Connecting Transmission Owner or Interconnection Customer or both.
Point of Interconnection -The point where the Interconnection Facilities connect with the New York State Transmission System or the Distribution System.
Reasonable Efforts -With respect to an action required to be attempted or taken by a Party
under this Agreement, efforts that are timely and consistent with Good Utility Practice and are otherwise substantially equivalent to those a Party would use to protect its own interests.
Small Generating Facility -The Interconnection Customer’s device no larger than 20 MW for the production of electricity identified in the Interconnection Request, but shall not include the Interconnection Customer’s Interconnection Facilities.
System Deliverability Upgrades - The least costly configuration of commercially available components of electrical equipment that can be used, consistent with Good Utility Practice and Applicable Reliability Requirements, to make the modifications or additions to the existing New York State Transmission System that are required for the proposed project to connect reliably to the system in a manner that meets the NYISO Deliverability Interconnection Standard for
Capacity Resource Interconnection Service.
System Upgrade Facilities - The least costly configuration of commercially available
components of electrical equipment that can be used, consistent with good utility practice and
Applicable Reliability Requirements to make the modifications to the existing transmission
system that are required to maintain system reliability due to: (i) changes in the system,
including such changes as load growth and changes in load pattern, to be addressed in the form
of generic generation or transmission projects; and (ii) proposed interconnections. In the
additions to the existing New York State Transmission System that are required for the proposed
project to connect reliably to the system in a manner that meets the NYISO Minimum
Interconnection Standard.
Tariff - The NYISO’s Open Access Transmission Tariff, as filed with the FERC, and as amended or supplemented from time to time, or any successor tariff.
Upgrades -The required additions and modifications to the Connecting Transmission Owner’s
portion of the New York State Transmission System or the Distribution System at or beyond the
Effective Date: 9/26/2016 - Docket #: ER16-2287-001 - Page 1
NYISO Agreements --> Service Agreements --> SGIA No. 2293 between National Grid and Innovative/Colonie
Point of Interconnection. Upgrades may be System Upgrade Facilities or System Deliverability Upgrades Distribution Upgrades. Upgrades do not include Interconnection Facilities.
Effective Date: 9/26/2016 - Docket #: ER16-2287-001 - Page 1
NYISO Agreements --> Service Agreements --> SGIA No. 2293 between National Grid and Innovative/Colonie
Attachment 2
Detailed Scope of Work, Including Description and Costs of the Small Generating Facility,
Interconnection Facilities, and Metering Equipment
Equipment, including the Small Generating Facility, Interconnection Facilities, and metering equipment shall be itemized and identified as being owned by the Interconnection Customer, or the Connecting Transmission Owner. The Connecting Transmission Owner will provide a best estimate itemized cost, including overheads, of its Interconnection Facilities and metering equipment, and a best estimate itemized cost of the annual operation and maintenance expenses associated with its Interconnection Facilities and metering equipment.
The expansion is the addition of one (1) Caterpillar G3520C Landfill Gas Engine
Generator Set rated at 1.6 MW to the existing Landfill Gas to Electric Power Facility rated at 4.8
MWH consisting of three (3) Caterpillar G3520C Landfill Gas Engine Generator Sets each rated
at 1.6 MW.
a) Developer’s Attachment Facilities: Colonie Landfill Cogen is served by a
radial tap from the Company’s 34.5kV sub-transmission system, CrescentSchool Street #17 line. The developer accepts service through their own Customer-owned electric substation which includes a main disconnect (Switch #1788), Company metering, Circuit Breaker R61, Transformer and various relay and associated protective devices.
(b) Connecting Transmission Owner’s Attachment Facilities: The
Connecting Transmission Owner, National Grid, provides a three-phase
34.5kV, single circuit service lateral (tap) to the Customer’s Facility. The
Company attaches to the Customer’s take-off structure with Company-
owned strain insulators, which provide the line of demarcation between
the Company and Customer facilities (with exception of Company billing
metering transformers and meter, which are the only assets within the
substation owned, operated and maintained by National Grid). Reference
Colonie Operating Landfill Cogen Operating Diagram dated 1-14
(attached). The lightning arresters which are tapped on the line side of the
Colonie Landfill Substation 1788 switch are owned, operated and
maintained by Colonie Landfill.
(c) Point of Interconnection: The Company provides a three phase single
circuit tap to the Customer’s take-off structure. The point of
interconnection between the Company and Customer facilities is the jawside of Customer-owned switch #1788 located on the Company’s take-off structure. Note the presence of Customer-owned arresters upstream of Customer-owned switch 1788. See “b” above.
Effective Date: 9/26/2016 - Docket #: ER16-2287-001 - Page 1
NYISO Agreements --> Service Agreements --> SGIA No. 2293 between National Grid and Innovative/Colonie
(d) Point of Change of Ownership: The Customer owns all facilities
electrically downstream from the Company’s strain insulators, located on
the Customer’s take-off structure (with exception of Company billing
metering transformers and meter and lightning arresters which are tapped
on the line side of the Customer’s main disconnect switch 1788).
Effective Date: 9/26/2016 - Docket #: ER16-2287-001 - Page 1
NYISO Agreements --> Service Agreements --> SGIA No. 2293 between National Grid and Innovative/Colonie
Attachment 3
One-line Diagram Depicting the Small Generating Facility, Interconnection Facilities,
Metering Equipment, and Upgrades
Effective Date: 9/26/2016 - Docket #: ER16-2287-001 - Page 1
NYISO Agreements --> Service Agreements --> SGIA No. 2293 between National Grid and Innovative/Colonie
Effective Date: 9/26/2016 - Docket #: ER16-2287-001 - Page 1
NYISO Agreements --> Service Agreements --> SGIA No. 2293 between National Grid and Innovative/Colonie
Attachment 4
Milestones
In-Service Date:
Critical milestones and responsibility as agreed to by the Parties:
Effective Date: 9/26/2016 - Docket #: ER16-2287-001 - Page 1
Milestone/Date
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
Agreed to by:
For the Connecting Transmission Owner ______________________
Interconnection Customer __________________________________
Responsible Party
Date___________
Date___________
NYISO Agreements --> Service Agreements --> SGIA No. 2293 between National Grid and Innovative/Colonie
Attachment 5
Additional Operating Requirements for the New York State Transmission System, the Distribution System and Affected Systems Needed to Support the Interconnection
Customer’s Needs
The Connecting Transmission Owner shall also provide requirements that must be met by the Interconnection Customer prior to initiating parallel operation with the New York State Transmission System or the Distribution System.
Effective Date: 9/26/2016 - Docket #: ER16-2287-001 - Page 1
NYISO Agreements --> Service Agreements --> SGIA No. 2293 between National Grid and Innovative/Colonie
Attachment 6
Connecting Transmission Owner’s Description of its Upgrades and Best Estimate of
Upgrade Costs
The Connecting Transmission Owner shall describe Upgrades and provide an itemized
best estimate of the cost, including overheads, of the Upgrades and annual operation and
maintenance expenses associated with such Upgrades. The Connecting Transmission Owner
shall functionalize Upgrade costs and annual expenses as either transmission or distribution
related.
The cost estimate for System Upgrade Facilities and System Deliverability Upgrades
shall be taken from the NYISO OATT Attachment S cost allocation process or applicable
Interconnection Study, as required by Section 32.3.5.3.2 of Attachment Z. The cost estimate for Distribution Upgrades shall include the costs of Distribution Upgrades that are reasonably
allocable to the Interconnection Customer at the time the estimate is made, and the costs of any Distribution Upgrades not yet constructed that were assumed in the Interconnection Studies for the Interconnection Customer but are, at the time of the estimate, an obligation of an entity other than the Interconnection Customer.
The cost estimates for Distribution Upgrades and System Upgrade Facilities and System Deliverability Upgrades are estimates. The Interconnection Customer is ultimately responsible for the actual cost of the Distribution Upgrades and System Upgrade Facilities and System
Deliverability Upgrades needed for its Small Generating Facility, as that is determined under Attachments S and X and Z of the NYISO OATT.
Effective Date: 9/26/2016 - Docket #: ER16-2287-001 - Page 1