NYISO Agreements --> Service Agreements --> Implementation Agreement NYISO and Helix Ravenswood
SERVICE AGREEMENT NO. 2575
UNITED STATES OF AMERICA
BEFORE THE
FEDERAL ENERGY REGULATORY COMMISSION
)
New York Independent System Operator, Inc.)Docket No. ER21___
)
IMPLEMENTATION AGREEMENT
Pursuant to Section 205 of the Federal Power Act (“FPA”), 16 U.S.C. § 824d, and Part 35
of the Federal Energy Regulatory Commission’s (“Commission”) regulations, 18 C.F.R. § 35, et
seq., and Section 4.1.9.3 of the New York Independent System Operator Inc. (“NYISO”) Market
Administration and Control Area Services Tariff (“Services Tariff”), Helix Ravenswood, LLC
(“Helix”) and the NYISO (each individually, a “Party” and together, the “Parties”) hereby
submit this Implementation Agreement fully resolving issues related to the compensation and
terms and conditions under which Helix constructed a new fuel oil storage tank in order to
accommodate the conversion of the Ravenswood Generating Station1 to fire No. 4 fuel oil in lieu
of No. 6 fuel oil. The conversion of the Ravenswood Generating Station to No. 4 fuel oil is
required in order to allow the Ravenswood Generating Station to be in compliance with Chapter
2 of Title 15 of the Rules of the City of New York, while also furthering its compliance with
New York State Reliability Council’s Local Reliability Rule G.2 (Loss of Generator Gas Supply
- New York City) (“Rule G.2”). This Implementation Agreement establishes a mechanism
whereby Helix and the Loads in the Consolidated Edison Transmission District (as described in
the Services Tariff) will each pay approximately one-third of the prudently incurred capital costs
1 The Ravenswood Generating Station units that provide services pursuant to Rule G.2 consist of Ravenswood ST 01, Ravenswood ST 02, and Ravenswood ST 03.
1
Effective Date: 11/5/2020 - Docket #: ER21-302-000 - Page 1
NYISO Agreements --> Service Agreements --> Implementation Agreement NYISO and Helix Ravenswood
SERVICE AGREEMENT NO. 2575
associated with constructing key elements of the new fuel oil storage tank and fuel oil system.2 The total prudently incurred project cost was approximately $32 million (the “Total Fuel Oil Storage Tank Cost”).
As this Implementation Agreement is fair, reasonable and in the public interest, the Parties urge prompt approval by the Commission of this Implementation Agreement without condition, modification or delay, to be effective as of November 5, 2020 (“Effective Date”).
SECTION ONE
PROJECT IMPLEMENTATION AND COST RECOVERY
1.1 After consulting with the NYISO, Consolidated Edison Company of New York, Inc.
(“Consolidated Edison”), and other interested parties, Helix proceeded with the
construction of a new fuel oil storage tank. The new fuel oil storage tank supports phasing
out the use of No. 6 Fuel Oil to comply with New York City regulations. The new tank
was placed into commercial operation on November 1, 2019. Helix demonstrated its actual
project costs in good faith by providing project invoices and other supporting information
documenting costs directly related to the construction of its new fuel oil storage tank.
1.2 “Recoverable Project Costs” are those amounts to be recovered by NYISO from all load
withdrawals in the Consolidated Edison Transmission District (other than withdrawals to supply station power) and paid by NYISO to Helix pursuant to this Section 1. The Recoverable Project Costs shall be paid monthly as follows:
1.2.1 An initial November 2020 payment of $732,897.98; and
1.2.2 A monthly payment in each month from December 2020 through and including
2 Pursuant to a separate agreement, Consolidated Edison Company of New York, Inc.’s steam business (“Con
Edison Steam”) will reimburse Helix for approximately one-third of the prudently incurred capital costs associated with constructing key elements of the new fuel oil storage tank and fuel oil system.
2
Effective Date: 11/5/2020 - Docket #: ER21-302-000 - Page 1
NYISO Agreements --> Service Agreements --> Implementation Agreement NYISO and Helix Ravenswood
SERVICE AGREEMENT NO. 2575
September 2025 of $216,448.99.
1.3 The term of this Implementation Agreement is November 5, 2020 through September 30,
2025 (“Term”). The total Recoverable Project Cost paid by the NYISO will not exceed $13,286,939.40.
1.4 In the event Helix ceases usage of the new fuel oil storage tank and related equipment to
operate one or more of Ravenswood ST 01, Ravenswood ST 02 and Ravenswood ST 03 within the first 24 months after the tank was placed in commercial operation, then:
1.4.1 Helix shall notify NYISO and Consolidated Edison immediately if it determines or
learns that it will no longer use, or that it will no longer be able to use, the new fuel
oil storage tank and related equipment to operate one or more of Ravenswood ST
01, Ravenswood ST 02 and Ravenswood ST 03 for any reason;
1.4.2 Except as set forth in Section 1.6 of this Implementation Agreement, the NYISO
will cease making payments to Helix as of the first month after usage
ceased; and
1.4.3 Except as set forth in Section 1.6 of this Implementation Agreement, Helix shall
refund to the NYISO all amounts paid by the NYISO for the project within 30
calendar days after Helix ceases using the new fuel oil storage tank and related
equipment to operate one or more of Ravenswood ST 01, Ravenswood ST 02 and
Ravenswood ST 03. If payment is not rendered within 30 calendar days, interest
on any monies not yet paid to the ISO shall be calculated in accordance with the
methodology specified for interest on refunds in the Commission’s regulations at
18 C.F.R. § 35.19a (a)(2)(iii).
1.5In the event Helix ceases usage of the new fuel oil storage tank and related equipment to
operate one or more of Ravenswood ST 01, Ravenswood ST 02, and Ravenswood ST 03
3
Effective Date: 11/5/2020 - Docket #: ER21-302-000 - Page 1
NYISO Agreements --> Service Agreements --> Implementation Agreement NYISO and Helix Ravenswood
SERVICE AGREEMENT NO. 2575
at any time during the 60-month term of this Implementation Agreement, starting with the 25th month after the tank was placed in commercial operations, then:
1.5.1 Helix shall notify NYISO and Consolidated Edison immediately if it determines or
learns that it will no longer use, or that it will no longer be able to use, the new fuel oil storage tank and related equipment to operate one or more of Ravenswood ST 01, Ravenswood ST 02 and Ravenswood ST 03 for any reason;
1.5.2 Except as set forth in Section 1.6 of this Implementation Agreement, the NYISO
will cease making payments to Helix as of the first month after NYISO receives
notice from Helix, or should have received notice from Helix consistent with
Section 1.5.1 of this Implementation Agreement, and shall not be required to make
any further payments to Helix under this Implementation Agreement;
1.5.3 If the NYISO has paid more than $5,711,224.75 to Helix then, except as set forth
in Section 1.6 of this Implementation Agreement, Helix shall refund to the NYISO
all amounts paid by the NYISO in excess of $5,711,224.75 within 30 calendar days
after Helix ceases using the new fuel oil storage tank and related equipment to
operate one or more of Ravenswood ST 01, Ravenswood ST 02 and Ravenswood
ST 03. If payment is not rendered within 30 calendar days, interest on any monies
not yet paid to the ISO shall be calculated in accordance with the methodology
specified for interest on refunds in the Commission’s regulations at 18 C.F.R. §
35.19a (a)(2)(iii).
1.6 Throughout the Term of this Implementation Agreement, the provisions of paragraphs 1.4
and 1.5 will not apply, and the NYISO will continue to make monthly payments, if Helix’s
4
Effective Date: 11/5/2020 - Docket #: ER21-302-000 - Page 1
NYISO Agreements --> Service Agreements --> Implementation Agreement NYISO and Helix Ravenswood
SERVICE AGREEMENT NO. 2575
cessation of all usage of the new fuel oil storage tank and related equipment to operate one
or more of Ravenswood ST 01, Ravenswood ST 02 and Ravenswood ST 03 is due to:
1.6.1 A catastrophic equipment failure affecting all of Ravenswood ST 01, Ravenswood
ST 02 and Ravenswood ST 03, and Helix decides not to rebuild or replace the equipment. For purposes of this Section “catastrophic” has the meaning set forth in Section 23.2.1 of the Services Tariff; or
1.6.2 A change in law or regulation, issuance of an administrative order, or other
governmental action (collectively referred to as “governmental action” in this
paragraph) after the Effective Date of this Implementation Agreement that prevents
the economic operation of all of Ravenswood ST 01, Ravenswood ST 02 and
Ravenswood ST 03. For purposes of this Section, Helix must demonstrate to the
NYISO that the cost to continue operation of Ravenswood ST 01, Ravenswood ST
02 and/or Ravenswood ST 03, including any risk-adjusted cost of capital, could not
reasonably be expected to be recouped over the reasonably anticipated remaining
life of the generator(s). The elements of such demonstration may include, as
appropriate, the historical revenue and maintenance cost data for the purpose of the
baseline, the cost of necessary repairs or modifications, the costs (including, but not
limited to, capital expenditures) necessary to comply with a governmental action
that must be met in order to operate, anticipated capacity, energy and ancillary
services revenues following the governmental action, the projected costs of
operating following the governmental action, and other relevant data.
1.7 For purposes of this Agreement, cessation of all usage of the new fuel oil storage tank and
related equipment means that Helix no longer uses the tank to provide fuel to produce
5
Effective Date: 11/5/2020 - Docket #: ER21-302-000 - Page 1
NYISO Agreements --> Service Agreements --> Implementation Agreement NYISO and Helix Ravenswood
SERVICE AGREEMENT NO. 2575
electricity at any of Ravenswood ST 01, Ravenswood ST 02 or Ravenswood ST 03. For avoidance of doubt, Helix will not be considered to have completely ceased use of the tank and the NYISO’s payment obligation will continue so long as Helix continues to use the tank to serve at least one generating unit.
1.8 In the event there is a catastrophic failure of the fuel oil tank and/or related equipment, and
Helix decides to rebuild the tank and/or equipment, Helix will not be entitled to recover
more than Total Fuel Oil Storage Tank Cost. To the extent Helix receives combined
payments from NYISO, Consolidated Edison Steam, and insurance proceeds that exceed
the Total Fuel Oil Storage Tank Cost, any excess proceeds will first be applied equally to
reduce each of NYISO’s and Consolidated Edison Steam’s obligation to pay any remaining
unrecovered portion of the Total Fuel Oil Storage Tank Cost. In the event that such excess
is greater than the NYISO’s and Consolidated Edison Steam’s remaining payment
obligations, Helix shall next pay one-third of the proceeds in excess of the Total Fuel Oil
Storage Tank Cost to the NYISO.
1.9 In the event there is a catastrophic failure of the fuel oil tank and/or related equipment, and
Helix decides not to rebuild the facility, the insurance proceeds will be applied first to
compensate Helix for any portion of the Total Fuel Oil Storage Tank Cost it had not
recovered from the NYISO or Consolidated Edison Steam. If the insurance proceeds
exceed the amount necessary to compensate Helix for the portion of the Total Fuel Oil
Storage Tank Cost not recovered from the NYISO or Consolidated Edison Steam, then
one-third of the balance of such excess insurance proceeds shall be paid to the NYISO.
6
Effective Date: 11/5/2020 - Docket #: ER21-302-000 - Page 1
NYISO Agreements --> Service Agreements --> Implementation Agreement NYISO and Helix Ravenswood
SERVICE AGREEMENT NO. 2575
SECTION TWO
PAYMENT
2.1 The NYISO will pay Helix the Recoverable Project Costs monthly using the NYISO’s
normal billing cycle described in Section 2.7.3 of the NYISO Open Access Transmission
Tariff (“OATT”), commencing with the Effective Date of this Implementation
Agreement.
2.1.1 The NYISO’s obligation to pay Helix is conditioned on the NYISO’s continuing
authority to obtain the Recoverable Project Costs from all load withdrawals in the
Consolidated Edison Transmission District (other than withdrawals to supply
station power) under this Implementation Agreement, the OATT and the Services
Tariff.
2.2 The NYISO will allocate Recoverable Project Costs paid to Helix pursuant to this
Implementation Agreement, in accordance with the provisions of Section 6.1.7 of the
NYISO OATT that are in effect at the time this Implementation Agreement is executed,
to all load withdrawals in the Consolidated Edison Transmission District (other than
withdrawals to supply station power) based on each Load Serving Entity’s (“LSE’s”)
load ratio share. Payments to the NYISO and Refunds issued by the NYISO will utilize
the NYISO’s normal billing cycle, as described in Section 2.7.3 of the NYISO OATT.
2.2.1 Recoverable Project Costs, paid pursuant to Section 2.1 of this Implementation
Agreement, will be allocated based on each LSE’s load ratio share for each month
during which the NYISO is obligated to pay Recoverable Project Costs under this
Implementation Agreement.
7
Effective Date: 11/5/2020 - Docket #: ER21-302-000 - Page 1
NYISO Agreements --> Service Agreements --> Implementation Agreement NYISO and Helix Ravenswood
SERVICE AGREEMENT NO. 2575
2.2.2 Refunds and insurance proceeds paid to the NYISO in accordance with this
Implementation Agreement shall be refunded to all load withdrawals in the
Consolidated Edison Transmission District (other than withdrawals to supply
station power) based on each LSE’s load ratio share. Refunds shall be allocated
based on each LSE’s load ratio share for the period during which refunds are issued,
using the same load ratio share basis that the NYISO uses to allocate the
Recoverable Project Costs.
SECTION THREE
EXPIRATION/AMENDMENT
3.1Except for outstanding payment obligations under Section 2 hereof, this Implementation
Agreement shall expire on September 30, 2025.
3.2 The Parties shall retain all rights under the FPA, Section 4.1.9 of the Services Tariff, and
all other provisions in the Services Tariff, to the extent applicable, as described in Sections
6 and 7 of this Implementation Agreement.
SECTION FOUR
SECTION 4.1.9 OF THE NYISO SERVICES TARIFF
4.1 This Implementation Agreement constitutes the full and complete agreement of the Parties
with respect to the new fuel oil storage tank addressed herein, and supersedes all prior
negotiations, understandings, and agreements, whether written or oral, between the Parties
with respect to the subject matter described herein. The Parties also agree that this
Implementation Agreement does not affect or change any provisions of the Services Tariff,
including Section 4.1.9, or any other implementation agreement between the Parties related
to Helix’s costs to generate electric energy using fuel oil in lieu of natural gas in furtherance
of New York State Reliability Council (“NYSRC”) Local Reliability Rule G.2.
8
Effective Date: 11/5/2020 - Docket #: ER21-302-000 - Page 1
NYISO Agreements --> Service Agreements --> Implementation Agreement NYISO and Helix Ravenswood
SERVICE AGREEMENT NO. 2575
4.2 Where there are differences between Section 4.1.9 of the Services Tariff and the terms of
this Implementation Agreement, the terms of this Implementation Agreement shall govern.
4.3 All references within this Implementation Agreement to Section 4.1.9 of the Services Tariff
refer to the provisions of Section 4.1.9 as they exist as of the date this Implementation Agreement is executed.
SECTION FIVE
COMMISSION ORDER
5.1 To the extent the Commission accepts this Implementation Agreement subject to a
condition or modification, each Party shall have the right to withdraw from this Implementation Agreement, which withdrawal may be exercised in such Party’s sole discretion but subject to the provisions of Section 7.2.
SECTION SIX
FILING RIGHTS
6.1 No Party will make a Section 205 filing or a Section 206 filing seeking to amend the terms
of this Implementation Agreement, or seeking a rate or a revised rate to compensate Helix
for construction of a new fuel oil storage tank in order to accommodate the conversion of
the Ravenswood Generating Station to fire No. 4 fuel oil in lieu of No. 6 fuel oil during
the term of this Implementation Agreement, unless the Parties, by mutual consent, agree to
modify the terms and conditions of this Implementation Agreement. This Implementation
Agreement has been negotiated at arm’s-length by Parties of equal bargaining power, and
it is the intent of the Parties that this Implementation Agreement is subject to the “public
interest” standard of review set forth in United Gas Pipe Line Co. v. Mobile Gas Service
Corp., 350 U.S. 332 (1956) and Federal Power Commission v. Sierra Pacific Power Co.,
350 U.S. 348 (1956) (“Mobile Sierra doctrine”) to the full extent legally permissible and
9
Effective Date: 11/5/2020 - Docket #: ER21-302-000 - Page 1
NYISO Agreements --> Service Agreements --> Implementation Agreement NYISO and Helix Ravenswood
SERVICE AGREEMENT NO. 2575
as interpreted in Morgan Stanley Capital Group Inc. v. Pub. Util District No. 1, 128 S. Ct. 2733 (2008), NRG Power Marketing LLC v. Me. Pub. Utils, Comm’n, 130 S. Ct. 693 (2010) and Dominion Transmission Inc. v. FERC, 533 F.3d 845 (D.C. Cir. 2008).
6.2 For the sole purpose of settling the compensation matters described herein, this
Implementation Agreement represents a fair and reasonable negotiated settlement that is in
the public interest. The term of this Implementation Agreement shall not limit or restrict
the arguments that the Parties may put forth or the positions that the Parties may take in
any future proceeding before the Commission that are not specifically agreed to herein.
SECTION SEVEN
EFFECTIVE DATE AND GENERAL RESERVATIONS
7.1 This Implementation Agreement shall become effective on November 5, 2020, subject to
the Commission issuing an order accepting the Implementation Agreement. If the
Commission accepts the Implementation Agreement without modification, no Party will
request rehearing or otherwise appeal or support rehearing requests or appeals by others.
If the Commission does not accept the Implementation Agreement for filing, then Helix
will refund to the NYISO all amounts paid by the NYISO within 30 days of the
Commission’s order. The NYISO will then refund the money to all load withdrawals in
the Consolidated Edison Transmission District in accordance with Section 2.2.2 of this
Implementation Agreement.
7.2 This Implementation Agreement is an integrated whole and is expressly conditioned on the
Commission’s acceptance of all provisions herein without modification or condition.
Notwithstanding the foregoing, if the Commission’s approval of this Implementation
Agreement is conditioned on a modification of this Implementation Agreement or on any
other condition, such modification or condition shall be considered to be accepted unless a
10
Effective Date: 11/5/2020 - Docket #: ER21-302-000 - Page 1
NYISO Agreements --> Service Agreements --> Implementation Agreement NYISO and Helix Ravenswood
SERVICE AGREEMENT NO. 2575
Party objecting to such condition or modification serves written notice on the other Party
of its intent to seek rehearing of the order approving the Implementation Agreement as
modified or conditioned within a period of 10 calendar days from the date of such order.
Should Commission approval be subject to condition or modification of this Implementation Agreement, each Party shall then have the right, as determined in its sole discretion, to withdraw as a signatory of the Implementation Agreement.
7.3 Commission approval of this Implementation Agreement shall constitute the requisite
prospective waiver of any and all otherwise applicable Commission regulations, to the
extent necessary, to permit implementation of the provisions of this Implementation
Agreement.
7.4 This Implementation Agreement is made upon the express understanding that it constitutes
a negotiated agreement and, except as otherwise expressly provided for herein, no Party
shall be deemed to have approved, accepted, agreed to, or consented to any principle or
policy relating to rate design, rate calculation, or any other matter affecting or relating to
any of the compensation, charges, classifications, terms, conditions, principles, or issues
associated with this Implementation Agreement. This Implementation Agreement shall
not be deemed to be a “settled practice” as that term was interpreted and applied in Public
Service Commission of New York v. FERC, 642 F.2d 1335 (D.C. Cir. 1980), and shall not
be the basis for any decision with regard to the burden of proof in any future litigation.
This Implementation Agreement shall not be cited as precedent, nor shall it be deemed to
bind either Party in any future proceeding including, but not limited to, any Commission
proceeding, except in any proceeding to enforce this Implementation Agreement.
11
Effective Date: 11/5/2020 - Docket #: ER21-302-000 - Page 1
NYISO Agreements --> Service Agreements --> Implementation Agreement NYISO and Helix Ravenswood
SERVICE AGREEMENT NO. 2575
7.5 The discussions among the Parties and other entities that have produced this
Implementation Agreement have been conducted on the explicit understanding, pursuant
to Rules 602(e) and 606 of the Commission’s Rules of Practice and Procedures, that all
offers and any comments on these offers are privileged and not admissible as evidence
against any participant who objects to their admission and that any discussions of the
Parties and other entities with respect to offers of settlement is not subject to discovery or
admissible in evidence.
7.6Headings in this Implementation Agreement are included for convenience of reference only
and are not intended to have any significance in interpretation of this Implementation
Agreement.
7.7 This Implementation Agreement may be executed in separate counterparts, each of which
when executed and delivered shall be deemed to be an original and all of which
counterparts taken together shall constitute but one and the same instrument. For purposes
of this Implementation Agreement, facsimile or electronic signatures shall be deemed
originals.
SECTION EIGHT
SUPPORT OF FULL SETTLEMENT
8.1 The Parties agree that this Implementation Agreement resolves all issues related to the
manner in which Helix will be compensated for conversion of the Ravenswood Generating Station to fire No. 4 fuel oil in lieu of No. 6 fuel oil.
IN WITNESS WHEREOF, the Parties hereto have caused this Implementation Agreement to be signed by their duly authorized representatives on the date written below.
12
Effective Date: 11/5/2020 - Docket #: ER21-302-000 - Page 1
NYISO Agreements --> Service Agreements --> Implementation Agreement NYISO and Helix Ravenswood
SERVICE AGREEMENT NO. 2575
5HVSHFWIXOO\ VXEPLWWHG
+(/,; 5$9(16:22' //&
: cn=Clinton Plummer, o=Ravenswood Development,
Clinton Plummer LLC, ou, email=cplummer@ravenswoodgenerating.com,
%\ BBBBBBBBBBBBBBBBDate: 2020.10.28 23:19:15 -04'00'BBBBBB
Clinton Plummer, Authorized Signatory
'DWHG BB10/29/2020BBBBBBBBBBBBBBBBB
1(: <25. ,1'(3(1'(17 6<67(0 23(5$725 ,1&
%\ BBBBBBBBBBBBBBBBBBBBBBBBBBBBBB
'DWHG BBBBBBBBBBBBBBBBBBBBBBBBBBBBB
Effective Date: 11/5/2020 - Docket #: ER21-302-000 - Page 1
NYISO Agreements --> Service Agreements --> Implementation Agreement NYISO and Helix Ravenswood
SERVICE AGREEMENT NO. 2575
Respectfully submitted,
HELIX RAVENSWOOD, LLC
By: ______________________________
Dated: _____________________________
NEW YORK INDEPENDENT SYSTEM OPERATOR, INC.
Effective Date: 11/5/2020 - Docket #: ER21-302-000 - Page 1
NYISO Agreements --> Service Agreements --> Implementation Agreement NYISO and Helix Ravenswood
By:
Dated:
: cn=Wesley Yeomans, o=NYISO, ou=VP,
Wesley Yeomans O
________________Date: 2020.10.29 15:40:58 -04'00'yiso.com, c=US
10/29/2020
_____________________________
13
Effective Date: 11/5/2020 - Docket #: ER21-302-000 - Page 1