The NYISO – PJM Coordination Agreement covers the PJM – NYISO Interconnection Facilities under the Operational Control of the NYISO and PJM. For Operational Control purposes, the point of demarcation for each of the Interconnection Facilities listed below is the point at which each Interconnection Facility crosses the PJM-New York State boundary, except as noted below.
The PJM-NYISO Interconnection contains twenty-three (23) alternating current (“AC”) Interconnection Facilities, seven (7) of which form one (1) AC pseudo-tie[1]; and further contains one (1) HVDC Interconnection Facility as well as one (1) Variable Frequency Transformer (VFT). These are tabulated below:
NY/PJM AC Interconnection Facilities:
PJMNYISODesignated (kV)Common Meter Point
BranchburgRamapo5018 500 Ramapo
Closter Cresskill Sparkill751 69 ClosterCresskill
E. Sayre N. Waverly956 115 E. Sayre
E. Towanda Hillside70 230 Hillside
Erie East South Ripley69 230 South Ripley
FranklinSugar LoafSJ 115 Sugar Loaf
FranklinSugar LoafSD 115 Sugar Loaf
Harings CornersBurns702 138 Harings
Harings Corners NanuetPearl River 45 34Harings
Harings CornersW. Nyack701 69 Harings
Homer City Watercure30 345 Homer
Homer CityStolle Road37 345 Homer
Hudson FarragutC3403 345 Farragut
Hudson FarragutB3402 345 Farragut
Linden GoethalsA2253 230 Goethals
Linden VFTLinden CogenVFT 345 Linden VFT
Montvale Pearl River491 69 Montvale
Montvale Blue Hill44 69 Montvale
Montvale Blue Hill43 69 Montvale
S. Mahwah Hilburn65 69 S. Mahwah
S. Mahwah S. Mahwah138/345BK 258 138/345 S. Mahwayh
S. Mahwah Ramapo51 138 S. Mahwah
S. MahwahWaldwickJ3410 345 Waldwick
S. MahwahWaldwickK3411 345 Waldwick
Tiffany Goudey952 115 Goudey
Warren Falconer171 115 Warren
RECONYISOAC Pseudo-TieVariousO&R EMS
SayervilleNewbridgeHVDC-Tie500New Bbridge
1.0Lake Erie Emergency Redispatch (LEER)
2.0RAMAPO PHASE ANGLE REGULATOR OPERATING PROCEDURE prepared by the NYPP/PJM Circulation Study Operating Committee.
3.0Operating Protocol for the Implementation of Commission Opinion No. 476, Docket No. EL02-23-000 (Phase II), New York Independent System Operator, Inc., FERC Electric Tariff, Original Vol. No. 2, Attachment M-1.
4.0Northeastern ISO/RTO Coordination of Planning Protocol
5.0Inter Control Area Transaction Agreement.
6.0Procedures to Protect for Loss of Phase II Imports (effective January 16, 2007, pursuant to Order issued January 12, 2007, in FERC Docket No. ER07-231-000).
7.0Unscheduled Transmission Service Agreement, PJM Interconnection L.L.C, Rate Schedule No. 30, Effective Date January 1, 2001.
8.0Joint Emergency Operating Protocol dated September 10, 2009, among PJM Interconnection, L.L.C., New York Independent System Operator, Inc., and Linden VFT, LLC (Filed by PJM on October 1, 2009, in FERC Docket No. ER09-996-000).
Effective Date: 8/16/2011 - Docket #: ER11-3814-000 - Page 1
[1]WEQ-007 “Inadvertent Interchange Payback Standards,” North American Energy Standards Board (NAESB), on-line at www.naesb.org.