NYISO Tariffs --> Open Access Transmission Tariff (OATT) --> 35 OATT Attachment CC - Joint Operating Agreement Among And --> 35.20 OATT Att CC Schedules
The NYISO – PJM Coordination Agreement covers the PJM – NYISO Interconnection Facilities under the Operational Control of the NYISO and PJM. For Operational Control purposes, the point of demarcation for each of the Interconnection Facilities listed below is the point at which each Interconnection Facility crosses the PJM-New York State boundary, except as noted below.
The PJM-NYISO Interconnection contains twenty-three (23) alternating current (“AC”) Interconnection Facilities, seven (7) of which form one (1) AC pseudo-tie[1]; and further contains one (1) HVDC Interconnection Facility. These are tabulated below:
NY/PJM AC Interconnection Facilities:
PJMNYISODesignated (kV)Common Meter Point
BranchburgRamapo5018 500 Ramapo
Closter Sparkill751 69 Closter
E. Sayre N. Waverly956 115 E. Sayre
E. Towanda Hillside70 230 Hillside
Erie East South Ripley69 230 South Ripley
FranklinSugar LoafSJ 115 Sugar Loaf
FranklinSugar LoafSD 115 Sugar Loaf
Harings CornersBurns702 138 Harings
Harings Corners Nanuet45 34 Harings
Harings CornersW. Nyak701 69 Harings
Homer City Watercure30 345 Homer
Homer CityStolle Road37 345 Homer
Hudson FarragutC3403 345 Farragut
Hudson FarragutB3402 345 Farragut
Linden GoethalsA2253 230 Goethals
Montvale Pearl River491 69 Montvale
Montvale Blue Hill44 69 Montvale
Montvale Blue Hill43 69 Montvale
RECONYISOAC Pseudo-TieVariousO&R EMS
SayervilleNewbridgeHVDC-Tie500New Bridge
S. Mahwah Hilburn65 69 S. Mahwah
S. Mahwah S. Mahwah138/345 138/345S. Mahway
S. Mahwah Ramapo51 138 S. Mahwah
Tiffany Goudey952 115 Goudey
Warren Falconer171 115 Warren
1.0Lake Erie Emergency Redispatch (LEER)
2.0RAMAPO PHASE ANGLE REGULATOR OPERATING PROCEDURE prepared by the NYPP/PJM Circulation Study Operating Committee.
3.0Operating Protocol for the Implementation of Commission Opinion No. 476, Docket No. EL02-23-000 (Phase II), New York Independent System Operator, Inc., FERC Electric Tariff, Original Vol. No. 2, Attachment M-1.
4.0Northeastern ISO/RTO Coordination of Planning Protocol
5.0Inter Control Area Transaction Agreement.
6.0Procedures to Protect for Loss of Phase II Imports (effective January 16, 2007, pursuant to Order issued January 12, 2007, in FERC Docket No. ER07-231-000).
7.0Unscheduled Transmission Service Agreement, PJM Interconnection L.L.C, Rate Schedule No. 30, Effective Date January 1, 2001.
Effective Date: 7/25/2011 - Docket #: ER11-3663-000 - Page 1
[1]WEQ-007 “Inadvertent Interchange Payback Standards,” North American Energy Standards Board (NAESB), on-line at www.naesb.org.
[2] In a maximum generation emergency in the PJM Mid-Atlantic Area where PSE&G load needs to be curtailed, the PSE&G load would be curtailed pro-rata with curtailment of the ConEd requested service (and other firm service on the system). But, if NYISO is not also in a capacity emergency, the desired flow on ABC will be reduced by up to 400 MW to the extent necessary to avoid a PSEG load curtailment. ConEd may upgrade the transmission service for the 400 MW transaction to eliminate the reduction of the 400 MW transaction prior to load shed as described above by requesting such upgraded service and funding all necessary transmission upgrades as required by Part II and Part VI of the PJM OATT. The 600 MW transaction shall be reduced in the same manner as all other firm transactions in PJM.