The interconnection facilities covered by these cost allocation rules are those required for the proposed project to reliably interconnect to the transmission system in a manner that meets the NYISO Minimum Interconnection Standard for ERIS, and the NYISO Deliverability Interconnection Standard for CRIS.
The interconnection facilities covered by these cost allocation rules are comprised of the following three types of facilities: Attachment Facilities, System Upgrade Facilities and System Deliverability Upgrades.
Effective Date: 6/30/2010 - Docket #: ER10-1657-000 - Page 1