Table 19.1 Data Requirements for Internal Generators for LBMP Bidders
|
Data Item
| Cat.
| Bid
Parameters
| Variability
| Comments
|
Company Name
| G
| --
| Static Required
| Parent organization.
|
Generator Name/No.
| G
| --
| Static Required
|
|
Generator Unit Code/ID
| G
| --
| Static Required
| Unique code which identifies the Generator to the ISO.
|
Bus
| G
| Bus No.
| Static Required
| Specific location of Generator within the NYCA.
|
Submitted By
| G
| Name
| May vary
Required
| Organization submitting Bid. Multiple organization can be authorized to submit
Bids with the ISO accepting the most recent. A single organization must be specified to receive invoices from the ISO.
|
DMNC
(Summer & Winter)
| P/G
| MW
| Static Required
| Dependable Maximum Net Capability. Confirmed by test for Generator’s with Installed Capacity contracts, or historical production data.
|
Power Factor
| P/G
| MW/MVA
| Static Optional
| Generator's tested Power Factor for producing Reactive Power (MVArs) at normal high operating limit MW output level, provided it is at least 90% of DMNC.
This is required for Generators receiving Voltage Support Payments.
|
Installed Capacity
Contracts
| G
| MW
| May vary
Required
| Installed Capacity contracts in effect with LSEs within the NYCA. The ISO may limit maximum and/or minimum amounts of Installed Capacity by location due to reliability Constraints.
|
Normal Upper Operating Limit
| C/D
| MW
| May change
Required
by hour for
Day-Ahead
| Maximum output of a Generator that could be expected in any hour of the following operating day. The ISO must be informed of a limit change that results in less Capability.
|
Emergency Upper Operating Limit
| C/D
| MW
| May change
Required by hour for Day-Ahead
| Maximum output that a Generator’s owner expects it can reach during extraordinary conditions. A Generator’s Emergency Upper Operating Limit may be no less than its Normal Upper Operating Limit.
|
Normal Response Rate
(NRR)
| P/C/D
| MW/min.
| May vary
Required
| To be provided as an expected response rate. Generators may specify up to three NRRs. The minimum acceptable response rate is 1% of a Generator's gross output per minute.
|
Regulation Response
Rate (RRR)
| P/C/D
| MW/Min.
| Same as
Optional NRR
| To be provided as an expected response for Regulation Service. If RRR differs from NRR, the total expected response rate is restricted to the maximum of the two rates.
|
Emergency Response
Rate (ERR)
| P/C/D
| MW/Min.
| Same as
NRR
| To be provided as expected response for reserve pickups; A Generator’s ERR must be greater than or equal to the capacity-weighted average of its NRRs.
|
Reactive Power
Capability
| P/G
| Piecewise linear
curve with MW as independent variable and +/- MVArs as dependent variable
| Static Optional
| Update as changed.
|
Physical Minimum Generation Limit
| P/G
| MW
| Static Required
| |
Notes:
Internal Generators LBMP bidders are located within the NYCA.
Cat. = Data Categories: G = General; P = Pre-Qualification; C = Commitment; B = Balancing; D = Dispatch; I = Installed Capacity.
Static Data remains relatively constant over the lifetime of Bids but can be changed.
General Data may be provided electronically or by mail, but requires a confirmation or Pre-Qualification process by the ISO.
Some data will require substantiation by a test; actual data Bid may be subject to validation checking against Pre-Qualification data.
Optional = Required only when providing or bidding to provide the associated service.
|
| | | | |