Marc Richter

Vice President

 

 

 

April 13, 2012

PUBLIC VERSION

 

 

Submitted As An E-Filing

Ms. Kimberly D. Bose Secretary

Federal Energy Regulatory Commission 888 First Street, N.E.

Washington, D.C.  20426

 

 

Re:    Consolidated Edison Company of New York, Inc.
Docket No. ER12-___-000

 

Dear Secretary Bose:

 

Pursuant to Section 205 of the Federal Power Act, 16 U.S.C. §824d (1994) and Part 35 of the Commission’s regulations (18 CFR Part 35), Consolidated Edison Company of New York, Inc. (“Con Edison”) submits for filing an Amended and Restated Interconnection Agreement by and between Con Edison and Astoria Energy LLC (“Astoria Energy”), dated November 2, 2011 (the “Amended IA”).1  The Amended IA amends an Interconnection Agreement dated February 27, 2004 by and between Con Edison and Astoria Energy (“Original IA”).2

 

The Original IA provided for the interconnection to Con Edison’s Astoria East 138 kV
substation of an electric generator that Astoria Energy constructed, owns, and operates at 17-10
Steinway Street in the Borough of Queens.  The generating units encompassed by the Original

 

1 The Amended IA has been designated Original Service Agreement No. 330 under the New York Independent System Operator, Inc. (“ NYISO”) FERC Open Access Transmission Tariff, Original Volume No. 1.

2 The Original IA was filed with and accepted by the Commission.  Consolidated Edison Company of New York, Inc., 107 FERC ¶ 61,103 (2004).


 

 

Ms. Kimberly D. Bose

April 13, 2012

Page 2

 

IA consisted of two steam turbine units and four combustion turbines.  The Original IA provided that Astoria Energy would construct the generating units in two power blocks each consisting of one steam turbine and two combustion turbines.  Astoria Energy proceeded with the construction of the first power block and placed it in commercial operation in May 2006.

 

Subsequently, Astoria Energy transferred the development and ownership rights to the
second power block to another legal entity, Astoria Energy II LLC (“AE II”).  At the request of
Con Edison, AE II elected to interconnect the second power block to a new substation (the
Astoria Annex substation) that is owned by the New York Power Authority (“NYPA”), rather
than to Con Edison’s Astoria East substation.  AE II executed a Large Generator Interconnection
Agreement (“AE II IA”) with the NYISO and NYPA for the second power block.3  The AE II IA
is not affected by this filing.

These changes in the project call for certain amendments to the Original IA to reflect that only the first power block is subject to the Original IA.  Those amendments involve the deletion or revision of provisions relating to the phases of the project, as follows:

Provisions relating to the generator lead for the second power block were deleted (Sec.

1.01);

The second power block milestone and construction provision was deleted (Sec.

3.04(a)(iii);

The second power block generating units were excluded (Schedule 1.01(a));

The Substation Modifications associated with the second power block were eliminated (Schedule 3.04(a)(i));

System Upgrade Facilities associated with the second power block were eliminated (Schedule 3.04(a)(ii));

The Point of Interconnection associated with the second power block was deleted (Schedule 3.04(b)(i));

The revenue meter associated with the second power block was eliminated (Schedule

3.04(a)(i); and

The one-line diagrams depicting the interconnection facilities were revised to reflect these changes (Schedule 3.04(b)(ii) and Annex II).

These changes are highlighted in the text of the attached red-lined version of the

Amended IA, except that the revisions to the facility diagrams appended to the agreement could not be redlined because of software limitations.   Enclosure No. 1 to this filing contains an
executed copy of the Amended IA and Enclosure No. 2 contains a red-lined copy of the
Amended IA indicating the revisions to the Original IA.

 

 

3 The AE II IA was filed with and accepted by the Commission.  New York Independent System Operator, Inc., Docket No. ER11-2654, Letter Order, dated February 9, 2011(“AE II Letter Order”).

 

2


 

 

Ms. Kimberly D. Bose

April 13, 2012

Page 3

 

The amendments to the Original IA conform that agreement to the modified

interconnection arrangements for the second power block that were established by the AE II IA and approved by the AE II Letter Order.  The amendments are limited to such conformance changes and would not create or alter any charges under the Original IA.4

 

Con Edison proposes that the Amended IA be effective as of June 16, 2012.  The Original IA remains in effect and will be superseded by the Amended IA when that agreement becomes effective.  Con Edison requests that the Commission waive the information filing requirements of Part 35 of its regulations, particularly of Section 35.13(a) (18 CFR 35.13(a)) because the
amendments reflected in the Amended IA will not alter Con Edison’s rates or revenues.  Con Edison is authorized to state that Astoria Energy supports this filing.

Pursuant to the Commission’s regulations at 18 CFR §388.112, Con Edison requests that
Annex II and Schedule 3.04(b)(ii) to the Amended IA be protected from disclosure as
Confidential Energy Infrastructure Information (“CEII”).  Those documents are diagrams of
electric transmission facilities that could be useful to a person in planning an attack on critical
infrastructure.  The annex and schedule have been omitted from the Amended IA that is included
in the Public Version of this filing.  They are included in the Amended IA in the CEII Version of
the filing.

 

All communications relating to this filing should be directed to the following:


 

Donald J. Stauber

Assistant General Counsel
Consolidated Edison Company

of New York, Inc.

4 Irving Place
Room 1815-s

New York, New York  10003 Phone: (212) 460-4494

Fax:(212) 677-5850

Email:  stauberd@coned.com

 

Leonard Singer
Couch White, LLC
540 Broadway
P.O. Box 22222

Albany, New York  12201 Phone:  (518) 320-3406

Email:  lsinger@couchwhite.com


John Beck

Section Manager, Interconnection Services Consolidated Edison Company

of New York, Inc.

4 Irving Place
Room 1450-s

New York, New York  10003 Phone:  (212) 460-4244

Fax:  (212) 529-1130
Email:  beckj@coned.com

 

Charles McCall
Astoria Energy LLC

& Astoria Energy II LLC 1710 Steinway Street

Astoria, New York  11105 Phone:  (718) 274-7700

Email: ChuckMccall@astoriaenergy.com


 

4 The NYISO was not a party to the Original IA because that agreement predated the NYISO’s adoption of its

standardized Large Generator Interconnection Agreement.  The NYISO is not a signatory to the Amended IA

because the amendment relates to a non-major modification to facilities under the Original IA.  See Consolidated Edison Company of New York, Inc., 119 FERC ¶61,206 (2007).

 

3


 

 

Ms. Kimberly D. Bose

April 13, 2012

Page 4

 

 

 

 

Copies of this filing have been served on Astoria Energy, AE II and the NYISO.

 

If any questions arise regarding this filing, please contact me at the above address or phone number.

 

Respectfully submitted,

 

By: ________/s/__________________
Marc Richter

Vice President

 

 

 

 

 

 

Enclosures

 

cc:Leonard Singer

Couch White, LLP

Karen Gach

New York Independent System Operator, Inc.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 