October 25, 2019

 

By Electronic Delivery

The Honorable Kimberly D. Bose Secretary

Federal Energy Regulatory Commission 888 First Street, N.E.

Washington, D.C.  20426

Re:    Reliability Coordination Agreement Between New York Independent System
Operator, Inc. and Alcoa Power Generating, Inc.

Docket No. ER20-___-000

Dear Secretary Bose:

 

Pursuant to Section 205 of the Federal Power Act (“FPA”)1 and Section 35.13 of the
Commission’s regulations,2 the New York Independent System Operator, Inc. (“NYISO”)
submits for filing an executed Reliability Coordination Agreement (“RC Agreement”) between
the NYISO and Alcoa Power Generating, Inc. (“APGI”) (collectively, NYISO and Alcoa are
referred to as “Parties”).  As described in more detail below, the RC Agreement is a non-
conforming version of the Operating Agreement for Non-Incumbent Transmission Owners
(“Non-Incumbent TOA”), which is contained in Section 31.11 (Attachment Y, Appendix H) of
the NYISO Open Access Transmission Tariff (“OATT”).3  Under the RC Agreement, the
NYISO will provide the reliability services normally accorded a Non-Incumbent Transmission
Owner (“NTO”) under the Non-Incumbent TOA, but will not provide any corresponding market
services.

 

The NYISO respectfully requests that the Commission waive the applicable prior notice requirements, and allow the RC Agreement to become effective as of October 25, 2019, the date that the RC Agreement was executed by the Parties.  A clean, executed copy of the RC
Agreement is submitted with this filing letter as Attachment I.

 

 

 

 

 

 

1 16 U.S.C. § 824d.

2 18 C.F.R. § 35.13.

3 The Commission accepted the Non-Incumbent TOA for filing in 2018.  See New York Independent System Operator, Inc., 162 FERC ¶ 61,107 (2018).

 

10 Krey Boulevard, Rensselaer, New York 12144 | www.nyiso.com


 

 

Honorable Kimberly D. Bose October 25, 2019

Page 2

I. RELIABILITY COORDINATION AGREEMENT

 

APGI’s Long Sault Division owns and has operational control over a series of discrete
115 kV transmission lines and certain related facilities near Massena, New York.  These
facilities, referred to in the RC Agreement as Reliability Coordination Customer (“RCC”)
Transmission Facilities, connect certain manufacturing facilities owned by Alcoa Corporation
with generation and transmission facilities owned by neighboring utilities, including the New
York Power Authority and National Grid USA.  APGI provides open access transmission service
over the RCC Transmission Facilities pursuant to an OATT accepted for filing by the
Commission.4

 

The RCC Transmission Facilities are part of the Bulk Power System regulated by the
Commission pursuant to FPA Section 215, and APGI is registered with the North American
Electric Reliability Corporation (“NERC”) as a Transmission Owner and a Transmission
Operator with respect to the RCC Transmission Facilities pursuant to NERC’s Reliability
Functional Model.  APGI has an agreement in place with the Northeast Power Coordinating
Council (“NPCC”), the applicable Regional Entity, and NERC regarding APGI’s obligations to
comply with Reliability Standards applicable to Transmission Owners and Transmission
Operators.  To ensure full reliability of the New York Control Area (“NYCA”), as well as the
broader Bulk Power System, the NYISO has agreed to provide to APGI, in its capacity as a
Transmission Operator, Reliability Coordination Service.  The RC Agreement defines the nature
of that service, as well as the respective obligations of both the NYISO and APGI in connection
with the NYISO’s provision of Reliability Coordination Service to APGI.

As discussed above, the RC Agreement uses the terms and conditions set forth in the

Non-Incumbent TOA, but modifies those terms and conditions to include only the reliability

services under the Non-Incumbent TOA, and not the market services otherwise governed by that agreement.  APGI provides open access transmission service under its own OATT, and therefore does not require the market services otherwise offered under the Non-Incumbent TOA.5

The services to be provided by NYISO to APGI under the RC Agreement constitute a

limited subset of the services normally provided to an NTO under the Non-Incumbent TOA, and
focus on the monitoring and reliable operation of the RCC Transmission Facilities.  Among the
key services to be provided by the NYISO under the RC Agreement are the following functions
with respect to the RCC Transmission Facilities:  (1) the provision of outage coordination
service, (2) the performance of operations planning analyses, (3) the conduct of real-time
assessments, monitoring, and wide-area situational awareness, (4) the performance of certain
Planning Coordinator and Balancing Authority functions, (5) the administration of a
methodology for calculating System Operating Limits and Interconnection Reliability Operating

 

 

4 See Letter Order, Alcoa Power Generating, Inc., Docket Nos. ER16-2222-000, et al., issued October 28, 2016 (accepting APGI’s OATT for filing).

5 Although the provision of stand-alone reliability coordination services without accompanying market

services has been a practice in other regions (see, e.g., Module F of the Midcontinent Independent System Operator, Inc. Open Access Transmission, Energy and Operating Reserve Markets Tariff), it constitutes a unique circumstance in the NYCA, and one that the NYISO does not expect to recur.

 

2


 

 

Honorable Kimberly D. Bose October 25, 2019

Page 3

Limits, (6) the approval of system restoration plans, (7) the conduct of system restoration drills, and (8) the issuance of operating instructions to APGI.

 

The NYISO will provide Reliability Coordination Service to APGI without monetary
compensation.  In exchange for the provision of Reliability Coordination Service, APGI agrees
to conform to a series of registration and operational requirements.  These include (1)
maintenance of APGI’s registration with NERC and NPCC as a Transmission Owner and a
Transmission Operator, (2) the installation of equipment, including telemetry and metering
equipment, identified by the NYISO as necessary for the performance of Reliability
Coordination Service, (3) compliance with all applicable NYISO procedures and manuals
identified by the NYISO as required for the provision of Reliability Coordination Service, (4) the
provision to NYISO of any data, operating plans, operating procedures, studies, reports, or other
information identified by the NYISO as necessary for the provision of Reliability Coordination
Service, (5) the obligation to follow all operating instructions issued by the NYISO in its
capacity as a Reliability Coordinator and Balancing Authority, (6) the performance of all
applicable Transmission Operator obligations, as determined by NPCC, under the applicable
Reliability Standards, (7) compliance with all applicable Reliability Rules issued by NERC,
NPCC, or the New York State Reliability Council (“NYSRC”) as identified by NYISO for the
provision of Reliability Coordination Service, (8) prompt conduct of investigations of
malfunctions, failures, and/or outages of equipment, facilities, or transmission related to the
provision of Reliability Coordination Service, and the provision to the NYISO of the results of
such investigations, and (9) the prompt provision of any information requested by the NYISO in
connection with relevant audits or investigations performed by the Commission, NERC, NPCC,
NYSRC, or the NYISO itself.  The RC Agreement allows APGI to take actions under
appropriate circumstances to maintain Safe Operations, and to delegate certain functions to third
parties.

 

The remainder of the RC Agreement provides terms governing assignment, limitations of liability, indemnification, force majeure, term and termination of the RC Agreement,
confidentiality, governing law, the application of the Mobile-Sierra Doctrine, and related
matters.  These provisions are substantially the same as comparable provisions in the pro forma Non-Incumbent TOA.

 

II.PROPOSED EFFECTIVE DATE

The NYISO respectfully requests that the Commission allow the RC Agreement to

become effective as of October 25, 2019, the date that the RC Agreement was executed by the
Parties.  The RC Agreement is designed to strengthen the reliability of the NYCA and the
broader Bulk Power System, and an earlier effective date will help to promote reliability.
Accordingly, the NYISO submits that good cause exists for a waiver of the Commission’s prior
notice requirements necessary to allow the RC Agreement to become effective as of October 25,
2019.

 

 

 

 

 

3


 

 

Honorable Kimberly D. Bose October 25, 2019

Page 4

 

III.COMMUNICATIONS


Robert E. Fernandez, General Counsel
Raymond Stalter, Director, Regulatory Affairs
Karen G. Gach, Deputy General Counsel
*Christopher R. Sharp, Senior Compliance
Attorney

New York Independent System Operator, Inc.

10 Krey Boulevard

Rensselaer, NY 12144
Tel: (518) 356-6000
Fax: (518) 356-4702

rfernandez@nyiso.com rstalter@nyiso.com

kgach@nyiso.com
csharp@nyiso.com

*Designated for Service

 

IV.SERVICE


*Brian M. Zimmet

Hunton Andrews Kurth LLP 2200 Pennsylvania Ave, NW Washington, DC  20037

Tel:  (202) 955-1500
Fax:  (202) 778-2201

bzimmet@HuntonAK.com


The NYISO will send an electronic link to this filing to the official representative of
APGI, to each participant on its stakeholder committees, and to the New York Public Service
Commission. In addition, a complete copy of the documents included with this filing will be
posted on the NYISO’s website at www.nyiso.com.

 

V.CONCLUSION

Wherefore the NYISO respectfully requests that the Commission accept the RC Agreement for filing with an effective date of October 25, 2019.

 

Respectfully submitted,

/s/ Christopher R. Sharp

Christopher R. Sharp

Counsel for

New York Independent System Operator, Inc.

 