Amanda C. Downey
Counsel
December 30, 2015
The Honorable Kimberly D. Bose Secretary
Federal Energy Regulatory Commission 888 First Street, NE
Washington, DC 20426
Re:Niagara Mohawk Power Corporation d/b/a National Grid
Docket No. ER16-___-000
Filing of Amended Cost Reimbursement Agreement with New York Power Authority and Request for Waiver of Commission Notice Requirement
Dear Secretary Bose:
Pursuant to Section 205 of the Federal Power Act (“FPA”),1 and Part 35 of the
Federal Energy Regulatory Commission’s (“Commission”) regulations,2 Niagara
Mohawk Power Corporation d/b/a/ National Grid (“National Grid”) submits an amended
Cost Reimbursement Agreement (“Amended Reimbursement Agreement”) between
National Grid and the New York Power Authority (“NYPA”).3 The Amended
Reimbursement Agreement is designated as Service Agreement No. 2177 under the New
York Independent System Operator, Inc.’s (“NYISO”) Open Access Transmission Tariff
(“OATT”).
The Amended Reimbursement Agreement is an undisputed agreement pursuant to which National Grid will engineer, design, procure, construct, test, and commission
replacement or upgrade facilities on the National Grid transmission system that are
directly affected by NYPA’s planned installation of new Series Compensation Equipment on the existing Edic-Frazier 345 kV transmission line. National Grid respectfully
requests that the Commission grant waiver of its notice requirement to permit the
Amended Reimbursement Agreement to go into effect as of September 30, 2015, the
effective date agreed to by the Parties.
1
2
3
16 U.S.C. § 824d.
18 C.F.R. Part 35.
Together, National Grid and NYPA are referred to in the Amended Reimbursement Agreement
and in this transmittal letter as the “Parties.” The Amended Reimbursement Agreement amends the original version of that agreement (“Original Reimbursement Agreement”).
40 Sylvan Road, Waltham, MA 02451
T: 781-907-2136 F: 781-907-5701 amanda.downey@nationalgrid.com www.nationalgrid.com
The Honorable Kimberly D. Bose December 30, 2015
Page 2
I.Background
National Grid is a public utility with a transmission system in the State of New
York. NYPA is a corporate instrumentality of the State of New York with its own
transmission system in the State of New York. Both National Grid and NYPA have
placed their transmission systems under the operational control of the NYISO.
National Grid and NYPA entered into the Original Reimbursement Agreement to
facilitate NYPA’s planned installation of new Series Compensation Equipment on the
existing Edic-Frazier 345 kV transmission line (the Marcy South Series Compensation
Project or the “Project”). Previous to executing the Original Reimbursement Agreement,
NYPA undertook a study of adjoining transmission facilities and identified equipment on
National Grid’s transmission system that would require National Grid to engineer,
design, procure, construct, test, and commission replacement or upgrade facilities as part
of the Project. The scope of work addressed in the Original Reimbursement Agreement
covered National Grid facilities directly affected by the Project. The Commission
accepted the Original Reimbursement Agreement for filing effective November 21,
2014.4
Since the Commission accepted the Original Reimbursement Agreement for
filing, NYPA has requested changes to the existing scope of work under that agreement to better ensure satisfaction of Northeast Power Coordinating Council (“NPCC”) Bulk Power separation criteria and to make other changes.
II. The Amended Reimbursement Agreement
The Parties have revised the following provisions in the Amended Reimbursement Agreement to reflect the changes described above:
• Section 6.1 (setting forth the estimated cost of work); and
• Schedule A, including the addition of new Annex 1 thereto (setting forth the
scope of work).
As is true under the Original Reimbursement Agreement, National Grid is
performing services at actual cost as set forth in Articles 1.0 and 7.0 to the Amended
Reimbursement Agreement. The Commission should find the price of the services to be performed pursuant to the Amended Reimbursement Agreement to be just and reasonable because National Grid will perform these services at actual cost.
4
Commission Letter Order, Docket No. ER15-674-000 (Feb. 2, 2015).
The Honorable Kimberly D. Bose December 30, 2015
Page 3
III. Effective Date and Request for Waiver
Pursuant to section 35.11 of the Commission’s regulations,5 National Grid
respectfully requests waiver of the notice requirement contained in section 35.3 of the
Commission’s regulations6 to allow the Amended Reimbursement Agreement to become effective as of September 30, 2015, the effective date agreed to by the Parties.7
Good cause exists for the Commission to grant this waiver. Granting the waiver will accord with the intent of National Grid and NYPA to make the Amended
Reimbursement Agreement effective as of September 30, 2015. No prejudice will result to any party from granting the waiver. For these reasons, the Commission should find that good cause exists to grant an effective date of September 30, 2015.
IV.Attachments
In addition to this transmittal letter, this filing includes the following attachments:
• Clean version of the Amended Reimbursement Agreement (Attachment A);
• A document showing in red-line the differences between the Original
Reimbursement Agreement and the Amended Reimbursement Agreement (Attachment B); and
• An agreement between the Parties to revise the Original Reimbursement
Agreement as reflected in the Amended Reimbursement Agreement (Attachment
C).
518 C.F.R. § 35.11.
618 C.F.R. § 35.3.
7See the agreement between the Parties contained in Attachment C to this filing.
The Honorable Kimberly D. Bose December 30, 2015
Page 4
V.Communications and Service
Communications regarding this filing should be addressed to the following
individuals, whose names should be entered on the official service list maintained by the
Secretary for this proceeding:
Amanda C. DowneySean A. Atkins
CounselBradley R. Miliauskas
National Grid USAAlston & Bird LLP
Service Company, Inc.The Atlantic Building
40 Sylvan Road950 F Street, NW
Waltham, MA 02451Washington, DC 20004
(781) 907-2136(202) 239-3300
amanda.downey@nationalgrid.comsean.atkins@alston.com
bradley.miliauskas@alston.com
William L. Malee
Director, Transmission Commercial National Grid USA
40 Sylvan Road
Waltham, MA 02451 (781) 907-2422
bill.malee@nationalgrid.com
Copies of this filing have been served on NYPA, the NYISO, and the New York State Public Service Commission.
The Honorable Kimberly D. Bose December 30, 2015
Page 5
VI.Conclusion
For the reasons stated herein, National Grid respectfully requests that the
Commission accept the Amended Reimbursement Agreement effective as of September 30, 2015.
Respectfully submitted,
/s/ Amanda C. Downey
Amanda C. Downey
Counsel
National Grid USA
Service Company, Inc.
40 Sylvan Road
Waltham, MA 02451
Attorney for Niagara Mohawk Power
Corporation d/b/a National Grid