10 Krey Boulevard Rensselaer, NY 12144
March 19, 2014
By Electronic Delivery
Ms. Kimberly D. Bose, Secretary
Federal Energy Regulatory Commission 888 First Street, NE
Washington, DC 20426
Re: New York Independent System Operator, Inc., Docket ER08-1281-___;
Broader Regional Markets Informational Report and Request to Modify the Reporting Obligation
Dear Ms. Bose:
In accordance with paragraph 33 and ordering paragraph “D” of the Federal Energy
Regulatory Commission’s (“Commission’s” or “FERC’s”) December 30, 2010 Order on
Rehearing and Compliance in Docket No. ER08-1281 (“December 2010 Order”),1 the New
York Independent System Operator, Inc. (“NYISO”) hereby submits this Report on Broader
Regional Markets (“Report”). Ordering paragraph “D” of the December 2010 Order states that
the “RTO/ISO parties are hereby directed to submit informational reports, as discussed in the
body of this order.” In footnote 35 of its December 2010 Order the Commission stated that
it does not intend to issue public notice or issue an order on this Informational Report.
Paragraph 33 of the December 2010 Order instructs the NYISO:
“in collaboration with its neighboring RTO/ISOs, NERC and other
market participants, to submit a report, as an information filing,
addressing (i) the effects of the reforms on reducing congestion
that results from loop flows and the costs associated with
mitigating congestion; (ii) the effects of the implementation of the
enhanced interregional transaction coordination initiative; and (iii)
recommendations and analyses as to whether the buy-through
congestion proposal is required, and if so, when it should be
implemented.35”
35 These reports will be for informational purposes only. They will not be noticed and the Commission does not intend to act on them.
1 New York Independent System Operator, Inc., 133 FERC ¶ 61,276 (2010).
Ms. Kimberly D. Bose, Secretary March 19, 2014
Page 2
While the NYISO is responsible for submitting this informational Report to the
Commission, the contents of the Report were developed through collaboration between and
among PJM Interconnection, LLC (“PJM”), the Midcontinent Independent System Operator, Inc. (“MISO”), the Ontario Independent Electricity System Operator (“IESO”) and the NYISO
(collectively the “Lake Erie ISOs and RTOs”), with input from the NYISO’s stakeholders and the North American Electric Reliability Corporation (“NERC”).
I.Improvements that the Lake Erie ISOs and RTOs have made since 2008
A.Market Design Improvements the ISOs/RTOs Have Completed or Are
Presently Developing
The Lake Erie ISOs and RTOs present the following summary of the market design
features that have been, or will be, implemented to improve coordination between markets and reduce Lake Erie loop flow.
1.NYISO’s Interface Pricing Improvements
In December 2010, the Commission instructed the NYISO to develop interface pricing
reforms to address the price incentives that create loop flow concerns.2 The NYISO’s interface
pricing rules, as accepted by the Commission in 2013,3 incorporate four key aspects. First, the
NYISO models the Michigan/Ontario interface in the same way PJM does. Second, the NYISO
includes expected unscheduled power flows (“UPF”) in both its Day-Ahead Market (“DAM”) and
Real-Time Market (“RTM”). Third, the NYISO uses its scheduling path validation process to
ensure that External Transaction Bids are economically evaluated and scheduled consistent with
their expected power flow impacts.4 Finally, to calculate prices at its Keystone Proxy Generator
Bus that represents a significant portion of the facilities that interconnect the New York Control
Area (“NYCA”) to PJM, the NYISO (a) treats uncontrolled alternating current (“A/C”)
transmission lines as free-flowing tie lines, (b) includes expected (Day Ahead) or actual (realtime) UPF over the interface facilities in its pricing, and (c) recognizes the demonstrated
intermediate- and long-term effectiveness of the ABC, JK and Ramapo Phase Angle Regulators (“PARs”) in aligning actual power flows with scheduled power flows on PAR controlled
transmission facilities at the PJM/NYCA border. The NYISO’s interface pricing rules also
incorporate Commission-accepted tariff obligations and contractual obligations into the NYISO’s development of its Keystone Proxy Generator Bus prices.
2 New York Independent System Operator, Inc., 133 FERC ¶ 61,276 at PP 27 and 31 (2010).
3 New York Independent System Operator, Inc., 142 FERC ¶ 61,202 (2013).
4 Dr. Patton, President of the NYISO’s Market Monitoring Unit, explained why it is appropriate for the NYISO to
continue to use its bid validation software: “The NYISO’s path validation process is designed to ensure that the actual
power flows associated with the transactions are as consistent with the scheduled flows as possible. Precluding
circuitous paths substantial reduces unscheduled loop flows and reduces market participants’ ability engage in
patterns of transactions that may constitute manipulation of the RTO’s interface pricing.” See NYISO’s January 18,
2013 Interface Pricing Compliance Filing in Docket Nos. ER08-1281 and ER13-780, Attachment I at P 16.
Ms. Kimberly D. Bose, Secretary March 19, 2014
Page 3
The NYISO’s interface pricing policy relies on its scheduling path validation
process.5 NYISO Bid validation occurs as soon as a Bid is submitted to the NYISO’s Market
Information System (“MIS”), and before Bids are made available to be economically evaluated
for scheduling by the NYISO’s Day-Ahead or Real-Time Market software. The NYISO’s Bid
validation only allows feasible transactions that contain valid NERC e-Tag data, to be
economically evaluated for possible scheduling. The NYISO’s Bid validation software will not
validate Bids submitted to schedule External Transactions over any of the eight circuitous
Prohibited Transmission Paths identified in Section 16.3.3.8 of (Attachment J to) the NYISO
Open Access Transmission Tariff (“OATT”). The Commission has instructed the NYISO to add
additional prohibited paths if necessary to prevent new sources of Lake Erie loop flow from
being introduced in the future.6
The Commission found that the NYISO’s interface pricing policy satisfies the
requirements to align scheduled and real-time energy flows and to utilize NERC eTag validation
to enhance the alignment of scheduled and actual power flows. NYISO accounts for expected
unscheduled power flows in its Day-Ahead Market based on recently observed Lake Erie
circulation. “In the real-time market, NYISO accounts for the difference between scheduled and
actual power flows measured at its interface with Ontario, i.e., actual Lake Erie circulation.”7
The NYISO’s interface pricing rules produce prices that are consistent with the value of
actual power deliveries to New York and are similar to the prices produced by PJM’s pricing
method. Greater consistency in regional pricing methods, combined with NYISO’s rules that
prohibit the use of circuitous scheduling paths have diminished both the ability and the
incentives for Market Participants scheduling External Transactions to cause Lake Erie loop
flow. Instead, more power is being scheduled consistent with the path over which it will actually
flow.
2. PJM/NYISO Market-to-Market Implementation
The Commission authorized the NYISO and PJM to begin coordinated congestion
management/market-to-market coordination (“M2M”) in January 2013.8 The M2M coordinated
congestion management process allows transmission constraints that are significantly impacted
by generation dispatch changes in both the NYISO and PJM markets or by the operation of the
Ramapo PARs to be jointly managed in the real-time security-constrained economic dispatch
models of both RTOs.9 This joint real-time management of transmission constraints near the
5 New York Independent System Operator, Inc., 142 FERC ¶ 61,202 at P 26 (2013).
6 Id. at P 27.
7 Id. at P 22.
8 New York Independent System Operator, Inc., 138 FERC ¶ 61,192 (2012).
9 NYISO/PJM M2M includes two types of coordination: (1) re-dispatch coordination; and (2) Ramapo PAR
coordination. For re-dispatch coordination, the non-monitoring RTO re-dispatchs its generation to help manage congestion in the monitoring RTO, when economic, if one of the pre-defined flowgates becomes congested in the monitoring RTO. For Ramapo PAR coordination, the Ramapo PARs are operated to reduce overall congestion if certain pre-defined flowgates become congested in one or both RTOs.
Ms. Kimberly D. Bose, Secretary March 19, 2014
Page 4
market borders provides a more efficient and lower cost transmission congestion management solution, and facilitates price convergence at the market boundaries. Real-time coordination results in a more efficient economic dispatch solution to manage the real-time transmission constraints that impact both markets.
In its Orders accepting the rules NYISO and PJM developed to implement M2M, the
Commission explained “the Market-to-Market Coordination Process was developed specifically
in response to problems associated with Lake Erie loop flows.”10 The Commission Order
accepting the M2M revisions to the parties’ Joint Operating Agreement concluded “that
coordinating the redispatch of resources and PAR operations in both NYISO and PJM as
compared to each market operating independently, and thereby limiting the set of resources
available for redispatch to resources located within the control area where the constraint is
located, is a preferred method for addressing interregional transmission constraints and the Lake
Erie loop flows.”11
The Lake Erie ISOs and RTOs have learned to proactively address possible new causes
of Lake Erie loop flow. In February 2013, one of the two Ramapo PARs at the PJM/New York
border experienced an unplanned forced outage. To address the expected impact of the PAR
outage on their transmission systems, interchange scheduling practices, and implementation of
M2M coordination, the NYISO and PJM requested a temporary waiver from their Commission
accepted JOA provisions to permit them to operate their systems in a way that better reflected
expected power flows during the Ramapo PAR outage.12 The waiver request allowed NYISO
and PJM to maximize the total interchange capability between the RTOs while one PAR was out of service and to continue to achieve the target interchange flow over the Branchburg - Ramapo (5018) A/C transmission line (the “5018 line”).13 Specifically, NYISO and PJM requested
permission to temporarily reduce the net scheduled interchange that is expected to flow over the 5018 line, from 61 percent to 46 percent, while the PAR was being replaced. The waiver applied to the finite period of May 15, 2013 until the Ramapo PARs were returned to normal operation. NYISO and PJM are dedicated to proactively addressing interregional coordination issues as they arise, and involving the Commission when necessary, to more efficiently manage
interregional transmission constraints and the Lake Erie loop flow.
Potomac Economics, the NYISO’s external market monitoring unit, (“MMU”) has been
reviewing M2M operations between NYISO and PJM.14 The MMU regularly analyzes both the
efficacy of re-dispatch coordination and the efficacy of Ramapo PAR coordination. In its most
recent quarterly report, the MMU “finds that the Ramapo Line was reasonably efficient in 72
10 New York Independent System Operator, Inc., 140 FERC ¶ 61,205 at P 22 (2012).
11 New York Independent System Operator, Inc., 138 FERC ¶ 61,192 at P 20 (2012).
12 New York Independent System Operator, Inc., 143 FERC ¶ 61,153 at P 5 (2013).
13 The Ramapo PARs are utilized to control flows, and achieve target flow, over the 5018 line between NYISO and
PJM.
14 See Quarterly Report on the New York ISO Electricity Markets Third Quarter 2013, slides 61-68,
http://www.nyiso.com/public/webdocs/markets_operations/documents/Studies_and_Reports/Reports/MMU_Quarter
ly_Reports/2013/NYISO%20Quarterly%20Report%20-%20Quarter%203.pdf.
Ms. Kimberly D. Bose, Secretary March 19, 2014
Page 5
percent of the hours with congestion in NY and/or PJM.” During this period, M2M re-dispatch
coordination was not utilized often enough to allow reporting of that components efficacy. The
MMU presents this quarterly review to New York Market Participants at stakeholder meetings.15
The M2M coordination process has provided NYISO and PJM a set of very effective
tools to assist their management of congestion caused by unscheduled power flows including
Lake Erie loop flow. During the first year of implementation, 2013, the NYISO estimated that
the value of NYISO/PJM M2M was $4.7M.16 The estimate represents the value New York
realizes from Ramapo PAR coordination. This includes (1) the estimated savings to NYISO for
additional deliveries into New York, and (2) PJM compensation to NYISO for additional
deliveries into PJM (as compared to the Ramapo Target Value,17 excluding service to RECO
load). The identified value is net of any settlements to PJM when PJM’s transmission system is
congested.
3. Implementation of More Frequent Scheduling
Enhanced Interregional Transaction Coordination (“EITC”) permits the scheduling of
inter-Balancing Authority transactions on a more frequent basis than hourly schedules.18
PJM, MISO and NYISO are all capable of scheduling interregional interchange on a 15-
minute basis. MISO and PJM implemented the ability to schedule interregional interchange on a
15-minute basis on May 1, 2004. On July 27, 2011, NYISO activated 15-minute scheduling at
its Chateauguay D/C interface with Hydro-Quebec. In 2012 NYISO activated 15-minute
scheduling at all of its interfaces with PJM, including all Scheduled Lines.19 When Transmission
Customers offer interregional energy on a 15-minute basis, the RTO/ISO dispatchers have the
ability to alter schedules within an hour to address changing system conditions, including
changes in unscheduled power flows like Lake Erie loop flow. This dispatching flexibility
allows the RTO/ISOs to respond to the price impacts that Lake Erie loop flow has on their
transmission systems by altering intra-hour external transaction schedules. The RTO/ISO
dispatchers are no longer locked into achieving hourly external transaction schedules.
15 The most recent presentation is available at the following link:
http://www.nyiso.com/public/webdocs/markets_operations/documents/Studies_and_Reports/Reports/MMU_Quarter
ly_Reports/2013/NYISO%20Quarterly%20Report%20-%20Quarter%203.pdf.
16 http://www.nyiso.com/public/webdocs/markets_operations/committees/mc/meeting_materials/2014-01-
29/Operations_Report_201312.pdf
17 The Ramapo Target Value is defined in the NYISO/PJM JOA, Schedule D, Section 7.2.1. The Ramapo Target Value is based on the net interchange schedule between the NYISO and PJM plus the deviation of actual flows and desired flows across the ABC and JK interfaces.
18 New York Independent System Operator, Inc., 134 FERC ¶ 61,186 (2011).
19 The NYISO and PJM activated 15-minute scheduling on their primary interface on June 27, 2012. Fifteen minute scheduling was implemented on the Neptune and Linden VFT scheduled line interfaces on October 30, 2012 and November 28, 2012, respectively.
Ms. Kimberly D. Bose, Secretary March 19, 2014
Page 6
In its order accepting the NYISO’s EITC proposal, the Commission recounted that
enhanced scheduling options at the NYISO’s borders promote more efficient interregional
transmission, reduce uplift costs associated with real-time event management and congestion
management, support system balancing efforts by expanding the pool of resources available to
system operators, and lower total system operating costs by improving price signals.20 Potomac
Economics’ analysis identified a potential annual production cost savings for all NYISO
interfaces of $175 million.21
The NYISO has made use of the additional flexibility that 15-minute scheduling
provides. The NYISO varied external transaction schedules at its PJM Keystone Proxy
Generator Bus in over 33% of all quarter hours in 2013.22 Since implementation, the NYISO has consistently received 15-minute transaction offers at four of the five interfaces that allowed 15-
minute scheduling in real-time.23
Moving forward, the NYISO will focus on improving the 15-minute scheduling protocol
by implementing Coordinated Transaction Scheduling (“CTS”) with both PJM and ISO-New
England (“ISO-NE”) as well as evaluating the feasibility of 5-minute scheduling with Hydro-
Quebec.
4.PJM/NYISO and ISO New England/NYISO Coordinated Transaction
Scheduling
The CTS Real-Time Market rules, recently accepted by the Commission,24 allow Imports
and Exports to be scheduled based on a bidder’s willingness to purchase energy at a source in
one Control Area and sell it at a sink in another Control Area if the forecasted price at the sink
minus the forecasted price at the corresponding source is greater than or equal to the bid dollar
value.25 The NYISO intends to implement CTS with PJM in November of 2014 and CTS with
ISO-NE in the fourth quarter of 2015. CTS between NYISO and PJM will be implemented at all
four of the Proxy Generator Buses over which interchange between the two areas can be
scheduled.
20 New York Independent System Operator, Inc., 134 FERC ¶ 61,186 at P 8 (2011).
21 Id.
22 33% is a measure of schedule changes across the xx:15, xx:30 and xx:45 quarter hours. The xx:00 time was
excluded because changes across xx:00 can occur due to changes in offer sets and would not provide evidence of improved inter-regional scheduling.
23 The fifth interface is a Scheduled Line where the capability has been pre-sold to anchor tenants that choose to schedule on an hourly basis.
24 See New York Independent System Operator, Inc., 139 FERC ¶ 61,048 (2012) and New York Independent System Operator, Inc., 146 FERC ¶ 61,097 (2014).
25 Transmission Customers using CTS will submit a single CTS Interface Bid to indicate their desire to
simultaneously buy Energy in one Control Area and sell Energy into the other Control Area based on the forecasted price difference between the NYISO and PJM markets at the relevant location.
Ms. Kimberly D. Bose, Secretary March 19, 2014
Page 7
As the Commission recognized in its order accepting the NYISO’s CTS with PJM filing, “CTS will enhance market efficiency of interregional transactions and provide substantial
benefits to consumers in both PJM and NYISO.” “CTS should also minimize counter intuitive
flows, such as flows going from a high priced control area to a low priced control area, by
incorporating projected price differences between the NYISO and PJM markets into scheduling decisions.” In addition, “CTS should improve scheduling efficiency for both regions by
introducing a new scheduling option… that will allow bidding of different MW quantities at
different prices for each 15 minute interval within an hour.”26 CTS will further improve
scheduling efficiency for transactions between NYISO and PJM by establishing intra-hour
schedules 15 minutes closer to actual, real-time operations. Establishing intra-hour schedules
closer to the actual 15 minute scheduling interval will improve the accuracy of cross-border
scheduling decisions because those decisions will reflect updated system conditions, including
any price impact of unscheduled Lake Erie loop flow.27
The Commission found that both CTS with PJM and CTS with ISO-NE will provide
substantial benefits to customers in the three affected regions. In its CTS with PJM order, the
Commission finds “that CTS will enhance market efficiency of interregional transactions and
provide substantial benefits to consumers in both PJM and NYISO … joint studies performed by
PJM and NYISO estimate potential production cost savings ranging from $9 million/year to $26
million/year.”28 The order accepting the NYISO’s CTS with ISO-NE filing similarly states,
“CTS will provide substantial benefits to consumers in both ISO-NE and NYISO by addressing
inefficiencies present in the current external transaction scheduling process …, for the combined
ISO-NE and NYISO region, Potomac Economics estimates that CTS will result in $129 million
to $139 million in annual consumer savings, and $9 million to $11 million in annual production
cost savings.”29
5.PJM/MISO Interchange Optimization
PJM and MISO began discussions on the development of an Interchange Optimization
solution for stakeholder consideration as part of the MISO-PJM Joint and Common Market effort
to address seams issues on the MISO-PJM interface. Current plans call for the development of a
proposal to be presented to stakeholders for their endorsement in the Summer 2014 time frame,
with their approval being sought in the Fall 2014 followed by a FERC filing in early 2015.
B. Physical Improvements Implemented Since 2008
As of April 5, 2012, all four circuits comprising the Michigan/Ontario interconnection
had in-service PARs. Starting on that date, the MISO and IESO began actively operating the
PARs to better conform actual power flows to scheduled power flows. The expectation was that
26 New York Independent System Operator, Inc., 146 FERC ¶ 61,097 at P 33 (2014).
27 Id. at P 13.
28 Id. at P 33.
29 New York Independent System Operator, Inc., 139 FERC ¶ 61,048 at P 29 (2012).
Ms. Kimberly D. Bose, Secretary March 19, 2014
Page 8
such operations, in conjunction with controls already operational elsewhere on the system, would help reduce the unscheduled flows which cause Lake Erie Circulation (“LEC”).
In January 2014, MISO, PJM and IESO completed an evaluation of the PARs on the
Ontario-Michigan interface and their ability to maintain actual flow within a 200 MW bandwidth
of scheduled flow and produced an Evaluation Report.30 Based on an analysis using one year of
actual operating data when all PARs on the Ontario-Michigan interface were operational, the
evaluation found the PARs are able to keep Lake Erie loop flow within a ±200 MW control band
during 73.1% of the 15-minute periods during the one-year study period. The simulated loop
flow calculated without PAR control would only have been within the control band for 43.4% of
the year. During most of the periods that the loop flow strayed outside the 200 MW bandwidth,
the flow was over by a small margin and the flow was expected to return within the 200 MW
bandwidth within the next few 15-minute periods. MISO and IESO set the Ontario-Michigan
interface status to “Regulated” 95.5% of the time during the study period.
The purpose of the Evaluation Report was to recount the actual performance of the
Ontario-Michigan (ONT-MI) interface PARs over a one-year period during which the PARs
were operational, and to provide insight into the effectiveness of the PARs in controlling LEC
flow. The Evaluation Report follows from the Regional Power Control Device Coordination
(“RPCDC”) Study report published in 2011 as a joint effort among IESO, MISO, NYISO, and
PJM.
Although the RPCDC Study recommended a follow-up study (Second Study) be performed after the Ontario-Michigan PARs enter service and operational data had been collected for a year, the Evaluation Report should not be considered as meeting that recommendation for three reasons:
• First, one of the Ramapo PARs was out-of-service from February 2013 until late-
December 2013. Since the one-year of operating data used in this analysis (8/1/12-
7/31/13) contains seven months during which there was not a fully functioning set of
PARs on the PJM-NYISO interface, the data does not support an analysis on how the
various power control devices around Lake Erie influence LEC or could have their
operations coordinated to minimize loop flows.
• Second, rather than defer the study until one year of operating data with a fully
functioning set of PARs on the PJM-NYISO interface is available, the study to support
the Evaluation Report was performed in 2013 to address a Joint and Common Market
(JCM) initiative that MISO/PJM evaluate the ability of the Ontario-Michigan PARs to
manage LEC by having actual flow equal scheduled flow. If the Ontario-Michigan PARs
are effective in managing LEC, the JCM initiative will recommend they be included in
the MISO/PJM market flow calculations and in the historic allocation process.
30 The Ontario-Michigan PAR Performance Evaluation Report (“Evaluation Report”) is posted at http://www.miso-
pjm.com/documents.aspx.
Ms. Kimberly D. Bose, Secretary March 19, 2014
Page 9
• Third, NYISO elected not to participate in this study and Evaluation Report but did
participate in the first RPCDC Study. NYISO has indicated that it is willing to
participate in a second study at some point in the future, provided that actual operating
data includes the impacts of all Ramapo PARs. Therefore, this study should be
considered a limited scope study that addressed a specific JCM initiative. A second study
is still planned for the future and is anticipated to include the involvement of all four
RTOs/ISOs around Lake Erie.
Section I.B. of this Report was prepared by MISO, PJM and IESO. The NYISO does not join in this section of the Report.31
II.The Lake Erie ISOs and RTOs Agree That Implementing Buy-Through of
Congestion is Premature at This Time
The objective of the proposed Buy-Through of Congestion Broader Regional Market
solution is to (a) identify the sources of loop flow caused by interregional transaction scheduling,
(b) determine the costs incurred in supporting the loop flows by each impacted region, and
(c) allocate the costs incurred by the off-contract path Balancing Authorities to the scheduling
entity, or remove the associated schedules if the scheduling entity is not willing to pay the full
cost of flowing its transaction(s). Implementing Buy-Through of Congestion will result in a
more complete identification, and accurate assignment, of the costs to move power between
regions, and will provide an economic alternative to the administrative/physical curtailment
processes. Buy-Through of Congestion will allow the scheduling entity to decide whether or not
it is willing to pay the congestion charges caused by its transaction’s off-contract path flow
impacts. If a scheduling party indicates it is not willing to pay congestion charges, its transaction
will be removed if the off-contract path flow impacts add to congestion costs in an off-contract
path ISO or RTO.
The Lake Erie ISOs and RTOs need time to understand how the collective set of market
solutions discussed herein will affect Lake Erie loop flow and how the market solutions should
account for the operation of all of the controllable devices around Lake Erie. The only way to
understand the impact of these market solutions is to gain operational experience with the
recently, and soon to be, implemented Broader Regional Market improvements and to study the
resulting operational data. NYISO, PJM, MISO and IESO all agree that it is not necessary to
begin to develop the proposed Buy-Through of Congestion Broader Regional Market solution at
31 The NYISO does not possess the necessary information and has not been given the opportunity to analyze and
substantiate MISO’s and IESO’s claims. All of the Lake Erie ISOs and RTOs agree that it would be counter-
productive for NYISO and PJM to address the operation of the Michigan/Ontario PARs in this informational Report. On October 20, 2010, MISO and International Transmission Company d/b/a ITCTransmission (“ITC”) submitted a Federal Power Act Section 205 filing to the Commission, in Docket No. ER11-1844, to allocate a portion of the cost of ITC’s Bunce Creek PARs (two of the five Michigan/Ontario PARs) to customers in New York and PJM. On
December 20, 2011, the FERC Chief Administrative Law Judge set Docket No. ER11-1844 for hearing before an Administrative Law Judge. The presiding Administrative Law Judge issued a post hearing initial decision on
December 18, 2012, Midwest Indep. Transmission Sys. Operator, Inc., 141 FERC ¶ 63,021 (2012), which remains pending before the Commission. All of the hearing parties (including MISO, NYISO and PJM) are waiting for a Commission order on the Administrative Law Judge’s initial decision.
Ms. Kimberly D. Bose, Secretary March 19, 2014
Page 10
this time. The Lake Erie ISOs and RTOs need more time to analyze the other recently, and soon to be, implemented programs before determining whether or not the Buy-Through of Congestion Broader Regional Market solution will provide sufficient additional benefits to merit its
development and implementation.
III. Request for Waiver or Modification of Reporting Obligation
The December 2010 Order imposed semiannual reporting obligations on the NYISO, in collaboration with its neighboring ISOs and RTOs, NERC and other market participants,
commencing one year after the implementation of interface pricing reform and congestion
management/market-to-market coordination.
“[O]ne year after the implementation of interface pricing reform
and congestion management/market-to-market coordination, and
every six months thereafter until the market initiatives are fully
implemented, we require the NYISO, in collaboration with its
neighboring RTO/ISOs, NERC and other market participants, to
submit a report, as an information filing, addressing: (i) the effects
of the reforms on reducing congestion that results from loop flows
and the costs associated with mitigating congestion; (ii) the effects
of the implementation of the enhanced interregional transaction
coordination initiative; and (iii) recommendations and analyses as
to whether the buy-through congestion proposal is required, and if
so, when it should be implemented.”32
The ISOs and RTOs respectfully request that the Commission amend this informational filing obligation to require annual reports to the Commission. Postponing the next informational filing to March 20, 2015 will provide necessary time for the ISOs and RTOs to develop a more
substantive update for the Commission than could be provided in September 2014. Certain
initiatives described above (CTS, for example) will require the majority of 2014 to complete and, therefore, the status will not change significantly in the next six months. Also, an additional year of operating experience with the features that entered service in 2012-2013, and the features
being implemented in 2014, will allow the ISOs and RTOs to better understand their impact
before providing an update to the Commission.
IV. Communications and Correspondence
All communications and service in this proceeding should be directed to:
32 New York Independent System Operator, Inc., 133 FERC ¶ 61,276 at P 33 (2010) (original footnotes omitted).
Ms. Kimberly D. Bose, Secretary March 19, 2014
Page 11
Robert E. Fernandez, General Counsel
Raymond Stalter, Director, Regulatory Affairs
*Alex M. Schnell, Registered Corporate Counsel *James H. Sweeney, Attorney
New York Independent System Operator, Inc.
10 Krey Boulevard
Rensselaer, NY 12144
Tel: (518) 356-6000
Fax: (518) 356-8825
aschnell@nyiso.com
jsweeney@nyiso.com
* Designated to receive service.
V.Service
The NYISO will send an electronic link to this filing to the official representative of each
party to this proceeding, to the official representative of each of its customers, to each participant
on its stakeholder committees, to the New York Public Service Commission, and to the New
Jersey Board of Public Utilities. In addition, the complete filing will be posted on the NYISO’s
website at www.nyiso.com.
VI.Conclusion
The NYISO respectfully requests that the Commission accept this Report as satisfying the requirements set forth in the Commission’s December 2010 Order and accept the proposed annual reporting requirement that is proposed in Section III of this Report.
Respectfully submitted,
/s/ Alex M. Schnell
Alex M. Schnell, Registered Corporate Counsel James H. Sweeney, Attorney
New York Independent System Operator, Inc.
cc:Michael A. Bardee
Gregory Berson
Anna Cochrane
Jignasa Gadani
Morris Margolis
Michael McLaughlin
David Morenoff
Daniel Nowak
CERTIFICATE OF SERVICE
I hereby certify that I have this day served the foregoing document upon each person
designated on the official service list compiled by the Secretary in this proceeding in accordance
with the requirements of Rule 2010 of the Rules of Practice and Procedure, 18 C.F.R. §
385.2010.
Dated at Rensselaer, NY this 19th day of March, 2014.
By:/s/ John C. Cutting
John C. Cutting
New York Independent System Operator, Inc.
10 Krey Blvd.
Rensselaer, NY 12144 (518) 356-7521