UNITED STATES OF AMERICA
BEFORE THE
FEDERAL ENERGY REGULATORY COMMISSION
)
New York Independent System Operator, Inc.)Docket No. ER14-2006-000
)
REQUEST FOR LEAVE TO ANSWER AND ANSWER
OF THE NEW YORK INDEPENDENT SYSTEM OPERATOR, INC.
Pursuant to Rule 213 of the Rules of Practice and Procedure of the Federal Energy
Regulatory Commission (“Commission”),1 the New York Independent System Operator, Inc.
(“NYISO”) respectfully seeks leave to answer and submits this answer (“Answer”). The Answer
responds to the June 11, 2014, protest of Demand Response Supporters (“Protest”)2 regarding
the NYISO’s May 21, 2014, compliance filing in the above-captioned proceeding (“Compliance
Filing”) to permit the participation of demand response facilitated by behind-the-meter
generation in its Day-Ahead Demand Response Program (“DADRP”).3
The Commission should reject the Protest and accept the NYISO’s proposed tariff
revisions without modification. As described below, the NYISO’s proposed tariff revisions
protested by Demand Response Supporters are necessary for the NYISO to satisfy the
Commission’s directives in its November 22, 2013, order (“November Order”) to ensure that
resources are compensated only for their actual Demand Reduction,4 maintain system reliability,
1 See 18 C.F.R. § 385.213 (2013).
2 New York Independent System Operator, Inc., Protest of Demand Response Supporters, Docket No. ER14-2006-000 (June 11, 2014) (“Protest”). Demand Response Supporters consist of EnerNOC, Inc., Viridity, Inc., Comverge, Inc., and EnergyConnect, a Johnson Controls Company.
3 New York Independent System Operator, Inc., Compliance Filing of New York Independent System Operator, Inc., Docket No. ER14-2006-000 (May 21, 2014) (“Compliance Filing”).
4 Capitalized terms not otherwise defined herein shall have the meaning specified in Article 2 of the NYISO’s Market Administration and Control Area Services Tariff and Article 1 of the NYISO’s Open Access Transmission Tariff.
1
and provide for comparable treatment of demand response resources participating in the DADRP.5
I.REQUEST FOR LEAVE TO ANSWER
The Commission has discretion to, and routinely accepts, answers to protests where, as
here, they help to clarify complex issues, provide additional information, are otherwise helpful in the development of the record in a proceeding, or assist in the decision-making process.6 The NYISO’s Answer to the Protest satisfies these standards and should be accepted because it
addresses inaccurate or misleading statements, and provides additional information that will help the Commission to fully evaluate the arguments in this proceeding.
II.ANSWER
A.The Metering of a Demand Side Resource’s Local Generator Is Required to Ensure
Demand Side Resources Are Only Compensated for Actual Demand Reduction, to
Maintain System Reliability, and to Ensure Comparable Treatment of Demand Side
Resources
Demand Response Supporters protest the NYISO’s proposed tariff requirement that a
Demand Side Resource participating in the DADRP that has a Local Generator must have an
hourly-interval meter that measures the output of that generator, regardless of whether the
Demand Side Resource plans to use the Local Generator in the program. For the reasons
5 Demand Response Supporters v. New York Independent System Operator, Inc., Order Granting Complaint, in Part, 145 FERC ¶ 61,162 (2013) (“November Order”) at P 37.
6 See, e.g., Southern California Edison Co., 135 FERC ¶ 61,093 at P 16 (2011) (accepting
answers to protests “because those answers provided information that assisted [the Commission] in [its] decision-making process”); New York Independent System Operator, Inc., 134 FERC ¶ 61,058 at P 24 (2011) (accepting answers to protests and answers because they provided information that aided the
Commission in better understanding the matters at issue in the proceeding); New York Independent
System Operator, Inc., 140 FERC ¶ 61,160 at P 13 (2012) and PJM Interconnection, LLC, 132 FERC ¶ 61,217 at P 9 (2010) (accepting answers to answers and protests because they assisted in the
Commission’s decision-making process).
2
described below, the Commission should reject the Protest and accept the NYISO’s proposed metering requirement without modification.
The NYISO measures a Demand Side Resource’s Load reduction, as scheduled in the
NYISO’s Day-Ahead Market for Energy, by reference to an estimated baseline of Load for that
Demand Side Resource. The NYISO currently uses the Customer Baseline Load (“CBL”)
methodology to calculate the estimated baseline Load of a Demand Side Resource participating
in the DADRP.
The NYISO proposes to require that each Local Generator of a Demand Side Resource
participating in the DADRP have an hourly-interval meter that measures the output of the
generator, so that the NYISO can monitor the accuracy of the Demand Side Resource’s baseline
and confirm that actual Demand Reduction is occurring in response to the NYISO’s scheduling
the resource in its Day-Ahead Market. This requirement is consistent with the Commission’s
directive in the November Order that the NYISO develop tariff provisions to ensure Demand
Side Resources “are compensated only for the demand response service they actually provide.”7
When a Demand Side Resource has one or more Local Generators, the NYISO cannot rely solely on the Demand Side Resource’s net Load meter to ensure that the resource’s baseline is accurate and that the resource is only being compensated for Demand Reduction it provides in response to its schedule in the NYISO’s Energy market. If the NYISO does not have visibility regarding the output of behind-the-meter generation, the NYISO cannot determine through the net Load meter data whether actual Demand Reduction is occurring, rather than a resource using a Local Generator to improperly influence the calculation of its baseline.
7 November Order at P 37.
3
A change in a Local Generator’s output in conjunction with an upcoming economic
schedule could result in overstatement of either the baseline or the in-day adjustment to the
baseline, which would result in the NYISO compensating the resource for more Load reduction than it actually performed during the scheduled period. For example, a Demand Side Resource could selectively lower the output of a Local Generator to increase the amount of energy it
requires from the NYISO’s markets to satisfy its Load, resulting in an overstated baseline. In such instance, the NYISO would not be able to discern whether any reduction from the
improperly overstated baseline of the Demand Side Resource’s Load as measured by the net Load meter is actual Load reduction resulting from the resource curtailing its Load or operating its Local Generator in response to the schedule the resource received in the NYISO’s Day-Ahead Market or is phantom Load reduction based on the overstated baseline.
A Demand Side Resource could also selectively operate a Local Generator to exclude
from the calculation of its baseline certain days in which its Load is lower than usual, resulting in
the resource being compensated based on its Load reduction from a higher, overstated baseline
level. On days in which a Demand Side Resource expects to have lower than usual Load, such
as during a planned partial or full shutdown of a facility, the Demand Side Resource could
selectively operate a Local Generator differently from its normal output level in a manner that
will not draw the NYISO’s attention to a significant change in net Load, but would exclude the
low Load day from the baseline calculation under the NYISO’s exclusion requirements for low
usage days. While Demand Response Supporters make light of the risk of baseline
manipulation, finding it “difficult to imagine,”8 the Commission has assessed penalties to
8 Protest at p 7.
4
demand response providers in other regions for manipulating their baselines by using behind-the-
meter generators to inflate these baselines and, thus, getting paid for phantom Load reductions.9
In developing its compliance filing, the NYISO evaluated several alternatives for
addressing these concerns, including considering the potential costs associated with the different
options, before settling on the proposed metering requirement. Other Suppliers participating in
the NYISO’s Energy market are required to connect through their local Transmission Owner and
install real-time metering and telemetry that is then relayed to the NYISO every six seconds. For
example, Demand Side Resources that provide real-time services, such as Operating Reserves
and Regulation Service, through the NYISO’s Demand Side Ancillary Services Program
(“DSASP”) are required to have real-time metering and telemetry.10 The Commission
referenced these DSASP metering and telemetry requirements in its November Order as part of
its determination that the NYISO had previously enacted measurement and verification
requirements that ensure demand response facilitated by behind-the-meter generation is
compensated only for the actual Demand Reduction.11 The NYISO, however, did not adopt this
approach for the DADRP because it concluded after careful evaluation that real-time metering
and telemetry, which are relatively expensive to install and maintain, are not required at this time
to measure and verify Demand Side Resources’ participation in the DADRP. Instead, the
NYISO initially proposed to stakeholders that a Demand Side Resource with a Local Generator
9 See, e.g., Rumford Paper Company, Order Approving Stipulation and Consent Agreement, 142 FERC ¶ 61,218 (2013); Rumford Paper Company, Order to Show Cause and Notice of Proposed Penalty, 140 FERC ¶ 61,030 (2012).
10 The telemetry and real-time metering requirements for DSASP are required to maintain
reliability and to satisfy the reliability rules of the Northeast Power Coordinating Council for resources providing Operating Reserves and Regulation Service.
11 November Order at P 37 fn 46.
5
participating in the DADRP must install a New York State Public Service Commission
(“NYPSC”)-approved revenue-grade, hourly-interval meter for its Local Generator. The data
from this meter would be reported after-the-fact to the NYISO solely for monitoring purposes.
In response to stakeholder concerns about cost, the NYISO modified the required metering from
the NYPSC-approved revenue-grade, hourly-interval meters to the more affordable hourly-
interval meter that can measure the output of the Local Generator within a 2% accuracy
threshold.12 The NYISO’s revised proposal in the Compliance Filing minimizes the investment
for a Demand Side Resource with a Local Generator that would like to participate in the DADRP
as compared to the other reasonable alternatives, and still provides the NYISO with the data
needed to verify a Demand Side Resource’s participation in the DADRP.
Demand Response Supporters argue that this metering requirement is inexplicable for the portion of Local Generators that are renewable resources, which output they argue cannot be reasonably controlled or manipulated. The DADRP, however, is an economic demand response program in which the Demand Reduction Provider13 is paid for its provision of a specific
quantity of reduced electricity demand that it offers in the NYISO’s Day-Ahead Market for
Energy. When the Demand Reduction Provider offers Demand Reduction in the NYISO’s Day-
Ahead Market for Energy, its offer is evaluated against other Suppliers. As with a conventional
Supplier, the NYISO expects that the offer reflects a Demand Side Resource’s capability to
12 The NYISO’s proposed use of non-revenue grade metering for a Local Generator should
significantly reduce the costs of such metering. A Demand Side Resource in New York State has the
option of obtaining metering from many sources, including its respective Transmission Owner. The
purchased meter may qualify for an incentive payment from the New York State Energy Research and
Development Authority (“NYSERDA”) that could offset a significant portion of the meter’s costs.
13 The “Demand Reduction Provider” may offer the Demand Reduction of an individual Demand Side Resource registered as a DADRP resource or a group of Demand Side Resources collectively
registered as a single DADRP resource.
6
deliver the specific quantity of Load reduction associated with its offer, including the ability to manage that Load reduction for the duration of its schedule. Accordingly, the definition of a Demand Side Resource requires that the resource be able to control demand in a responsive, measurable, and verifiable manner within time limits.14 If a Demand Side Resource cannot accurately manage its Load quantity due to uncontrollable behind-the-meter renewable
resources, the NYISO will not be able to determine an accurate baseline for the Demand Side Resource or confirm that actual Demand Reduction is occurring. Given the potential impact of behind-the-meter renewable resources on the Load of a Demand Side Resource, metering these resources is just as important as other behind-the-meter resources.
Finally, the NYISO’s proposed metering requirements should apply equally to all
Demand Side Resources with a Local Generator that participate in the DADRP, regardless of
whether the resource indicates that it will participate in the program by curtailing its Load,
operating a Local Generator, or some combination of both. As the Commission directed in the
November Order, the NYISO’s tariff provisions should provide for comparable treatment in the
DADRP of resources providing demand response facilitated by behind-the-meter generation and
all other demand response resources.15 The potential for baseline manipulation facilitated by
behind-the-meter generation exists for any Demand Side Resource with a Local Generator,
regardless of whether the resource informs the NYISO of its intent to operate a Local Generator
to provide Demand Reduction. The NYISO’s proposed metering requirement is necessary to
14 A “Demand Side Resource” is defined in Section 2.4 of the Services Tariff as “A Resource
located in the NYCA that is capable of controlling demand in a responsive, measurable and verifiable
manner within time limits... ” (emphasis added). The NYISO’s proposed revisions to this definition in
the Compliance Filing do not change the requirement that a Demand Side Resource must be capable of controlling its demand in a responsive, measureable and verifiable manner.
15 November Order at P 37 (emphasis added).
7
protect against such manipulation and to ensure compensation only for actual Demand Reduction
and should apply on a comparable basis to all resources with a Local Generator participating in
the DADRP.16 In addition, the Demand Side Resources currently enrolled in the DADRP have
elected not to participate at all in the DADRP over the past three years even without such
metering requirements.17 There is, therefore, no basis for Demand Response Supporters’
argument that applying these metering requirements to currently enrolled resources will
somehow negatively shift the economics of their participation in the program. However, the
NYISO’s proposed revisions to permit demand response facilitated by behind-the-meter
generation to participate in the DADRP could facilitate new enrollees in the DADRP that are
interested in participating in the program.
For these reasons, the Commission should accept the NYISO’s proposed metering
requirements as applicable to all Demand Side Resources with a Local Generator participating in the DADRP.
16 The NYISO believes that all of its proposed revisions in the Compliance Filing are within the scope of Commission’s directives in the November Order, including the applicability of the proposed metering requirement to all Demand Side Resources with a Local Generator that participate in the
DADRP. To limit the metering requirement to only a subset of Demand Side Resources with a Local Generator that participate in the DADRP would result in two tiers of participation requirements, rather than the comparable treatment of resources, without good cause, as the NYISO’s need to ensure
compensation only for actual Demand Reduction and to protect against baseline manipulation applies equally to all resources participating in the DADRP.
17 As reported in the NYISO’s annual year-end reports, the offer activity and resulting schedules for DADRP activity began to decline in 2009 and dropped off completely by the next year-end report. See, e.g., New York Independent System Operator, Inc., Annual Report in Docket No. ER01-3001-000; Docket No. ER01-3001-000 (January 15, 2014) at Attachment II at p 4 (indicating no activity in the
DADRP during the reporting period).
8
B.The Prior 30 Days of Meter Data Are Required to Ensure Demand Side Resources
Are Only Compensated for Actual Demand Reduction
Demand Response Supporters protest the NYISO’s proposed tariff revision to require
that a Demand Side Resource provide its hourly-interval metered Load data for all hours of each of the thirty days preceding the day the resource is scheduled. For the reasons set forth below, the Commission should reject the Protest and accept the NYISO’s proposed reporting
requirement without modification.
A Demand Side Resource participating in the DADRP is already responsible for
maintaining the 30 days of meter data requested by the NYISO.18 This meter data is used by the
Demand Reduction Provider in calculating the Demand Side Resource’s baseline. As an initial
matter, the Demand Reduction Provider uses the previous thirty days of data as part of the first
step in developing the Demand Side Resource’s CBL. In this first step, the Demand Side
Resource’s peak hourly Load is reviewed over the past thirty days to calculate the seed value that
is used to determine which days to exclude from the calculation of the CBL pursuant to the
NYISO’s low usage exclusion criteria.19 The seed value is determined by looking at all hours of
a day, not just at those hours in which the Demand Side Resource was scheduled. In addition,
the Demand Side Resource’s CBL is calculated using the meter data from the ten preceding
eligible days. Because weekend, low usage, and other scheduled days are excluded from the
18 See, e.g., Article 10 of the NYISO Market Administration and Control Areas Services Tariff; Section 6.4 of the NYISO Day-Ahead Demand Response Manual.
19 Section 5.1.I.A of the NYISO Day-Ahead Demand Response Manual (“Step 1. Establish the
CBL Window. Establish a set of days that will serve as representative of participant’s typical usage.
A.1.a Determine the participant’s peak hourly load over the past 30 days or the period covered by the load
data file, whichever is smaller. This value becomes the initial seed value for the average event period
usage level.”)
9
CBL calculation, meter data from as far back as thirty days could be required to calculate the baseline.
The NYISO requires the requested data to verify the accuracy of the Demand Side
Resource’s CBL and to confirm that actual Demand Reduction occurred.20 Because the Demand Side Resource could be scheduled for multiple, non-contiguous hours during the course of a day, the NYISO requires all twenty-four hours of each day to ensure it can verify the in-day
adjustment calculation of the baseline.
The submission to the NYISO for measurement and verification purposes of a small
subset of the data that is already required to be maintained by the Demand Side Resource and is
already used by the Demand Reduction Provider is reasonable and does not constitute an
unreasonable burden to the resource. In developing its compliance filing, the NYISO reviewed
several alternatives to the proposed reporting requirement and determined that its proposed
requirement was the least burdensome. The NYISO’s request for the prior thirty days of data is
not a rolling requirement, but is only initiated when the resource is scheduled. This data
reporting requirement is in lieu of the data that is normally provided to the NYISO by Suppliers
in the NYISO’s Energy market that are in communication with the NYISO via telemetry.21
Because the NYISO is not requiring telemetry for the DADRP, the NYISO will not have access
to the data required to verify the seed value that allows for the exclusion of low usage days or
20 Because the NYISO will always require the previous thirty days of meter data to determine the
low usage days for the baseline calculation, it does not make sense and would be administratively more
burdensome to the NYISO and Demand Side Resource to require the NYISO to request anew the thirty
days of meter data after each time the Demand Side Resource is scheduled, as suggested by Demand
Response Supporters.
21 For comparison, the NYISO’s reporting requirements for DSASP resources, real-time telemetry and after-the-fact hourly interval meter data, are identical to those of other Suppliers of Operating
Reserves and Regulation Service.
10
sufficient data to confirm the CBL against which the Demand Side Resource’s performance is
measured, unless the NYISO establishes the proposed 30-day reporting requirement for each
DADRP schedule. The current requirement to submit data to the NYISO for settlement purposes
occurs at 55 days after the scheduled Load reduction occurs, which provides the Demand
Reduction Provider with sufficient time to verify the meter data, calculate the baseline, and
determine the actual Load reduction prior to submitting that Load reduction data to the NYISO
for settlement.
For these reasons, the Commission should accept the NYISO’s proposed reporting requirement and reject the Protest.
III.CONCLUSION
WHEREFORE, the New York Independent System Operator, Inc. respectfully requests that the Commission accept the NYISO’s proposed tariff revisions in the Compliance Filing and reject the Protest.
Respectfully submitted,
/s/ Michael J. Messonnier, Jr.
Michael J. Messonnier, Jr. Counsel for the
New York Independent System Operator, Inc.
Date: June 26, 2014
Cc: Michael Bardee
Gregory Berson
Anna Cochrane
Jignasa Gadani
Morris Margolis
Michael McLaughlin
David Morenoff
Daniel Nowak
11
CERTIFICATE OF SERVICE
I hereby certify that I have this day served the foregoing document upon each person
designated on the official service list compiled by the Secretary in this proceeding in accordance with the requirements of Rule 2010 of the Rules of Practice and Procedure, 18 C.F.R. §385.2010.
Dated at Rensselaer, NY this 26th day of June, 2014.
/s/ Mohsana Akter
Mohsana Akter
New York Independent System Operator, Inc.
10 Krey Blvd.
Rensselaer, NY 12144 (518) 356-7560