April 25, 2012

 

CONTAINS CRITICAL ENERGY
INFRASTRUCTURE INFORMATION

 

By Electronic Delivery

Honorable Kimberly D. Bose Secretary

Federal Energy Regulatory Commission 888 First Street, NE

Washington, DC 20426

 

 

Re:    Filing of an Executed Interconnection Agreement Between the
New York Power Authority and Consolidated Edison Company
of New York, Inc., and Request for Critical Energy Infrastructure
Information Designation, Docket No. ER12-___-000

 

Dear Ms. Bose:

Pursuant to Section 205 of the Federal Power Act1 and Section 35.12 of the

Commission’s Regulations,2 the New York Power Authority (“NYPA”) and Consolidated
Edison Company of New York, Inc. (Con Edison”) hereby tender for filing an executed
Interconnection Agreement (“Agreement”), designated as Service Agreement No. 1873
between NYPA and Con Edison (collectively, “the Parties”).  With the exceptions noted
in Section II of this letter, the Interconnection Agreement conforms to the pro forma
Large Generator Interconnection Agreement (“LGIA”) that is contained in Attachment X
of the New York Independent System Operator, Inc.’s (“NYISO”) Open Access
Transmission Tariff (“OATT”).

 

 

 

 

 

 

1 16 U.S.C. § 824d (2006).

2 18 C.F.R. § 35.12 (2008).


 

 

Honorable Kimberly D. Bose April 25, 2012

Page 2

 

 

Con Edison and NYPA request a May 1, 2012 effective date for the

Interconnection Agreement and further request a waiver of the normal 60-day notice period, as discussed fully below.

The NYISO is not a party to this Agreement because the interconnection project
is not subject to the NYISO interconnection process, which requires a three party
agreement.  Two-party interconnection agreements are designated as Service Agreements
under the NYISO OATT.3  The agreements are being  filed by the Parties to the
Agreements, and the NYISO has indicated its intention to file comments in support of the
filing.4

 

 

 

I.BACKGROUND

The Agreement provides for an additional interconnection between transmission
facilities owned by NYPA and those owned by Con Edison.  The new transmission tie
will connect Con Edison’s Astoria East substation to NYPA’s Astoria Annex substation.
Both substations are located within a short distance (approximately 1000 feet) of each
other on property that Con Edison owns and that is also the site of several electric
generating plants.  One generating facility is currently connected to the Astoria Annex
substation, and that substation in turn is connected by transmission lines that NYPA owns
(Q35L&M) to Con Edison’s transmission facilities in Manhattan.  Several generating
facilities are connected to the Astoria East substation, including the Astoria Nos. 2 and 4
generators, which are owned by Astoria Generating Company, L.P. (“Astoria
Generating”).  Also connected to the Astoria East substation are distribution facilities that
Con Edison owns and uses to serve retail customers in portions of Queens.

The Agreement is necessitated by the decision of Astoria Generating to mothball
its No. 2 generator and by the long term outage of its No. 4 generator.  On December 14,
2011, Astoria Generating gave notice to the New York Public Service Commission
(“NYPSC”), the NYISO, and Con Edison that it would mothball the Astoria No. 2
generator effective June 11, 2012, and that the generator would be unavailable for an
indefinite period of time.  At the time, the Astoria No. 4 generator was out of service on a
long term basis because of an equipment failure.5  Con Edison considered the potential

 

3 Consolidated Edison Company of New York, Inc., 119 FERC ¶ 61,206 (2007); Consolidated Edison

Company of New York, Inc., Docket No. ER09-1515-000, Letter Order dated September 3, 2009; Niagara Mohawk Power Corporation, 121 FERC ¶ 61,183 (2007).

4 Id.  See also, Consolidated Edison Company of New York, Inc., Docket No. ER10-1193-000, Letter Order dated June 3, 2010; Consolidated Edison Company of New York, Inc., Docket No. ER08-895-000, Letter Order dated October 24, 2008.

5 On February 14, 2012, Astoria Generating gave notice that it is mothballing the Astoria No. 4 generator for an indefinite period.


 

 

Honorable Kimberly D. Bose April 25, 2012

Page 3

 

 

impact of Astoria Generating’s action on electric system reliability.  On February 3,

2012, Con Edison reported to the NYPSC that the mothballing of Astoria No. 2,

concurrent with the outage of Astoria No. 4, would cause localized reliability deficiencies for two transmission load areas in Queens commencing in the summer of 2012.6

 

Con Edison subsequently proposed the new transmission tie between the Astoria
Annex and Astoria East substations as a solution for the reliability deficiencies resulting
from the mothballing of the Astoria No. 2 generator and the unavailability of Astoria No.

4.  The new transmission tie would allow the delivery of energy that is available at the
Astoria Annex to the deficient transmission load areas via the Astoria East substation.
The new tie will be constructed in two phases because of time constraints.  Phase 1 will
connect the new tie from the Astoria East substation to the Q35L&M transmission lines
at a point near the Astoria Annex substation.  That connection can be completed prior to
the commencement of the 2012 summer season and the effective date for the mothballing
of Astoria No. 2.  Phase 2 will change the interconnection point for the new transmission
tie, from the Q35L&M lines to an air to gas bushing located within the fence line of the
Astoria Annex substation.  Con Edison expects to complete Phase 2 of the project prior to
the 2013 summer.

 

Con Edison presented the solution to the NYISO and to market participants at a
joint meeting of the NYISO’s Transmission Planning Advisory Subcommittee and
Electric System Planning Working Group on February 16, 2012.  Con Edison explained
that the transmission tie would solve the reliability deficiency attributable to Astoria No.

2 and is the only solution for that deficiency that could be constructed prior to the

effective date of the mothballing of Astoria No. 2.7 A small remaining deficiency

attributable to Astoria No. 4 can be solved through operational arrangements for the time
being.

Con Edison proposed the new transmission tie as a project under its local

transmission plan.  Con Edison posted the project as a modification to that plan and as an update to the base case depicted in the NYISO’s Form 715.  The NYISO agreed that the project was appropriately pursued under local plan because it will not have a material effect on the bulk power system.8

 

6 The deficiencies relate to the second contingency design and operating requirement, which is a local

reliability requirement established by the Reliability Rules of the New York State Reliability Council and the NYPSC’s regulations.

 

7 A small portion of the deficiency, which is attributable to the unavailability of the Astoria 4 generator,

would have to be addressed by a separate solution if Astoria 4 does not return to service within a reasonable
time.

8 The NYISO planning process does not apply to projects that affect power flows on designated interfaces by less than 10 MW.  See NYISO Procedure “System Reliability Impact Study Criteria and Procedures.” Section 3.7 of the NYISO OATT permits transmission owners to propose and construct transmission
facilities in the public interest and consistent with regulatory requirements.


 

 

Honorable Kimberly D. Bose April 25, 2012

Page 4

 

 

Con Edison will, at its sole expense, construct, own, and operate the new

transmission tie.  The interconnection of the tie to the Astoria Annex substation will
require the construction within the substation of system upgrade facilities - consisting
primarily of relay equipment and an extension of the gas-insulated bus.  Con Edison will
design, procure and construct those facilities at its own cost, and NYPA will own the
system upgrade facilities.  Con Edison will be responsible for the operation and
maintenance of the system upgrade facilities pursuant to an existing “Agreement between
Con Edison and NYPA for the Operation and Maintenance of the Facilities Associated
with Astoria Annex Substation 345kV Gas-Insulated Substation,” dated February 1,
2011.  Once constructed, the new transmission tie will become part of Con Edison’s
system and will be available for open access transmission service by the NYISO.

 

II. VARIATIONS FROM THE NYISO’S PRO FORMA LGIA

 

The Agreement substantially conforms to the pro forma Large Generator

Interconnection Agreement (“LGIA”) contained in Attachment X of the NYISO OATT. However, as discussed below, the Agreement differs from the pro forma LGIA in certain respects - most notably to reflect that the new tie is a transmission project, not a
generation project.

The Agreement is similar in that respect to the Interconnection Agreement that the Commission recently approved for the Hudson Transmission Partners (“HTP”) project, a merchant project that created a new tie between New Jersey and New York.9  The HTP
Interconnection Agreement modified the pro forma LGIA to conform it to the merchant transmission project proposed by HTP.  Accordingly, the Parties incorporated into the
Agreement the modifications that HTP proposed and the Commission approved, except
for terms relating to merchant projects that are not applicable to the regulated utility
project that Con Edison proposes here.

The following discussion summarizes the primary differences between the pro forma LGIA and the Agreement.  For the sake of clarity, the differences are divided into three categories:  variations to reflect NYPA’s unique legal status, variations between the HTP Interconnection Agreement and the pro forma LGIA, and variations between the Agreement and the HTP Interconnection Agreement.

The Commission has accepted changes to the pro forma LGIA terms where, as
here, there are unique circumstances associated with the interconnections, including

 

 

 

9 New York Independent System Operator, Inc., Docket No. ER11-3479-000, Letter Order dated June

28,2011. NYPA is not a party to the HTP Interconnection Agreement.  The representations made regarding the HTP Interconnection Agreement are solely those of Con Edison’s.


 

 

Honorable Kimberly D. Bose April 25, 2012

Page 5

 

 

“reliability concerns, novel legal issues or other unique factors.”10  In fact, many of the modifications to the pro forma LGIA in this Agreement are substantially similar or
identical to those previously accepted by the Commission.11  Con Edison and NYPA
respectfully request that the Commission accept these modifications in light of the unique factors and novel legal issues explained below.

 

A. Variations to Reflect NYPA’s Unique Legal Status

 

NYPA is a corporate municipal instrumentality and a political subdivision of the
State of New York (the “State”), organized under the laws of the State, and operating
pursuant to Title 1 of Article 5 of the New York Public Authorities Law.  As a result,
certain limited variations from the pro forma LGIA are necessary to reflect NYPA’s
unique legal status as a public authority governed under the New York Public Authorities
Law.

 

1.Compliance with New York’s Labor Law

Section 5.2 of the pro forma LGIA lists the general conditions applicable to the
Developer’s Option to Build.  The Parties have agreed to amend this list of conditions by
adding a statement that the Developer must comply with Section 220 of New York’s
labor law, which requires that for work performed on NYPA’s existing facilities,
workman, laborers, and mechanics must be paid at least the prevailing wage set forth in
that statute.  Section 220 also addresses pay supplements, work hours, and payroll
findings.  The Commission has previously accepted this change to the pro forma LGIA.12

 

2. NYPA’s Eminent Domain Authority

 

Under Section 1007 of the New York Public Authorities Law, NYPA has the right
to take real property through eminent domain when the NYPA trustees, in their
discretion, deem an eminent domain taking necessary or convenient to acquire real
property for the purposes described in such statute.  The Parties have proposed to modify
Article 5.13 of the Interconnection Agreement to make it clear that NYPA can only use

 

 

10 See PJM Interconnection, LLC, 111 FERC ¶ 61,163 at PP 10-11, reh’g denied 112 FERC ¶ 61,282
(2005).

11 See New York Independent System Operator, Inc. and Consolidated Edison Company of New York, Inc., 123 FERC ¶ 61,093 (Apr. 29, 2008) (accepting an interconnection agreement of a Merchant Transmission Facility); see also New York Independent System Operator, Inc. and Consolidated Edison Company of New York, Inc., Docket No. ER-11-2199-000 (December 28, 2010).

12 See New York Independent System Operator, Inc. and New York Power Authority, Letter Order, Docket No. ER08-1507-000 (November 4, 2008) and New York Independent System Operator, Inc. and New York Power Authority, Letter Order, Docket No. ER11-2654-000 (Feb. 9, 2011).


 

 

Honorable Kimberly D. Bose April 25, 2012

Page 6

 

 

efforts to acquire property by eminent domain if and to the extent consistent with State

law (i.e., New York Public Authorities Law § 1007).  NYPA must retain the right to have its trustees review, on a case-by-case basis, each request for NYPA to exercise its power of eminent domain and to exercise their discretion to approve or deny such request,
consistent with the requirements of New York State law.  The Commission has also
previously accepted this specific variation to the pro forma LGIA.13

 

B. Differences Between the HTP Interconnection

Agreement and the Pro Forma LGIA

The primary changes by the HTP Interconnection Agreement to the pro forma LGIA are as follows:

1. The pro forma term “Large Generating Facility” was replaced with “Transmission

Facility” throughout the Agreement.  Similarly, the definition of “Standard Large Generator Agreement” was revised to clarify that such term does not refer to this Interconnection Agreement.  The term “Standard Large Interconnection
Agreement” was replaced with “this Agreement,” “Interconnection Agreement,” or “Transmission Facility Interconnection Agreement.”

2. Revisions were necessary to account for the specific characteristics of a

transmission facility.  Unlike a Large Generating Facility, a Transmission Facility
“transmits” power.  Large Generating Facilities, by contrast, generate, produce, or
export power.  The words “export,” “generate,” or “produce,” were replaced, as
applicable, with the word “transmit.”14  Similarly, the following terms were
replaced, as follows:

“generation” with “generation or transmission facilities;”

“generating facilities” to “transmission facilities;”

“generating electricity for sale” with “transmitting electricity,” “generated at” to “transmitted on;”

“produce or absorb reactive power” to “transmit reactive power;” and

“production of electricity” to “transmission” or “transmission of electricity
over the  Transmission Facility;”

3. References to the NYISO Interconnection Study Process and Cost Allocation

procedure were eliminated because they did not apply to the HTP transmission expansion.

 

 

 

 

13 See id.

 

14 See, e.g., HTP Interconnection Agreement at §1 (“Definitions”); §6.1 (“Pre-Commercial Operation Date Testing and Modifications’); §9.5.2 (“Voltage Schedules”).


 

 

Honorable Kimberly D. Bose April 25, 2012

Page 7

 

 

4.Certain reactive power and voltage provisions in the pro forma LGIA also were

revised to conform to the unique operating requirements of the Transmission

Facility.

5.Several other provisions included in the generator-focused pro forma LGIA were

revised as follows:

Article 5.4 (“Power System Stabilizers”) and Article 9.5.4 (“Governors and
Regulators”) were deleted because they are inapplicable to a transmission
facility;

Article 5.17.2 (“Representations and Covenants”) was qualified by the
language, “as applicable to this Transmission Facility;”

Article 6.4 (“Right to Inspect”) was revised to delete the reference to Power
System Stabilizers;

Language regarding the right to observe testing of the  Transmission Facility
was added to the discussion in Article 6.3 (“Right to Observe Testing”) which
is limited, in the pro forma LGIA, to Attachment Facilities testing;

Article 9.6.4 (“System Protection and Other Control Requirements”) was
revised to account for the potential tripping of not only the Transmission
Facility, but also the Connecting Transmission Owner’s facilities;15

Article 9.6.4 was further revised to account for the manner and intervals at
which tests will be conducted related to System Protection Facilities;16

Article 9.6.5 (“Requirements for Protection”) was revised to add the

obligation to comply with the requirements of other applicable reliability

councils, and language was deleted regarding load interrupting capability and equipment that is not applicable to a Transmission Facility;

Article 24.4 (“Information Supplementation”) was revised (i) to delete

references to voltage and equipment tests that are applicable to generation

facilities but not transmission facilities and (ii) to clarify that Developer shall provide validated recordings of applicable tests.

6. Because no attachment facilities were associated with the HTP project, Article 5.8

was revised to refer to “the Attachment Facilities” rather than “their respective Attachment Facilities.”  The definition of “In-Service Date” in Article 1 was revised to mean the date upon which the Developer reasonably expects it will be ready to begin use of either Connecting Transmission Owner’s Attachment
Facilities or System Upgrade Facilities to obtain back feed power.

 

 

 

15 Id. at § 9.6.4.4.

16 Id. at § 9.6.4.6.


 

 

Honorable Kimberly D. Bose April 25, 2012

Page 8

 

 

7. Since there are no System Deliverability Upgrade Facilities and System
Deliverability Upgrades covered by the HTP Agreement, the reference in
Appendix A to System Deliverability Upgrade Facilities was eliminated and
references in the Appendices were revised to refer simply to “System Upgrade
Facilities” rather than “Stand Alone System Upgrade Facilities.”

8. Article 2.2 of the Interconnection Agreement (“Term of Agreement”) provided
for a term of twenty five (25) years, consistent with Article 2.2 of the pro forma
LGIA, which allows developers to specifically provides that the Parties may elect
a term longer than ten (10) years.

9. Certain errors were corrected including numbering errors, formatting errors, and
other ministerial revisions, including (i) updating the Table of Contents to reflect
the above-referenced revisions; and (ii) replacing the reference in Section 9.6.3 to
NPCC criteria A-3 with a reference to the NPCC Regional Reliability Reference
Directory that has replaced NPCC criteria A-3.

 

C. Differences Between the Agreement and the

HTP Interconnection Agreement

 

The primary changes by the Agreement relative to the HTP Interconnection Agreement are as follows:

1. The Recital paragraphs were conformed to reflect the parties and circumstances of
this project, rather than the HTP project.

2. Definitions of terms not used in the Agreement were deleted. In addition, the
reference to “other reliability councils that was included in the HTP
Interconnection Agreement was omitted, reconciling the text with the pro forma
LGIA. Definitions relevant to project were added.

3. References to the NYISO as a party to the agreement were deleted.

4. Characterizations of the project as a “merchant” undertaking were deleted.

5. Articles 4.1 and 13.4.2 were revised to delete references to interconnection
services and balancing of receipts and deliveries.

6. Article 5.3, (“Liquidated Damages”), Article 5.5 (“Equipment Procurement”),

Article 5.6 (“Construction Commencement”), Article 5.9 (“ Limited Operation”),
Article 5.10 (“ Developer’s Attachment Facilities”), Article 5.11 (“Connecting
Transmission Owner’s Attachment Facilities”), Article 5.15 (“ Early Construction
of Base Case Facilities”), Article 9.5.3 (“Payment for Reactive Power”), and


 

 

Honorable Kimberly D. Bose April 25, 2012

Page 9

 

 

Article 11.4 (“Special Provisions for Affected Systems”) were deleted because they are inapplicable to this project.

7. Article 6.1 references to the delivery of test energy have been deleted because it is
not relevant to the project.

8. Article 7 was revised to eliminate provisions relating to metering that are

inapplicable to the project. The new metering section states that revenue metering already exists and for telemetering, a multi functioning meter will be provided that will record relevant power flow information.

9. Article 9.5 relating to reactive power and voltage schedules includes the text of
the pro forma LGIA, rather than the modified provision of the HTP
Interconnection Agreement.

10. Article 9.6.1.2 relating to outage scheduling was revised to have Con Edison post
the outage schedules on the NYISO OASIS, and not NYPA.

11. Article 11 was revised to eliminate provisions relating to Affected Systems and
Security because no such systems exist with respect to the proposed project and
because no security was prescribed by the NYISO for the proposed project.

12. Article 18.3 relating to insurance was revised to delete references to forms of
coverage that are not commercially available.

13. Article 29.2 has been revised to state  that the provisions contained in the

Appendices take precedent over the terms in the Agreement, in the event of a
conflict.

 

 

III. REQUEST FOR CEII TREATMENT

Pursuant to the Commission’s regulations at 18 C.F.R. §388.112 and 18 C.F.R. §
388.113, Con Edison and NYPA request that the two one-line diagrams included as part
of Appendix A to the Agreement (Figure A-1 and A-2) be protected from disclosure as
Critical Energy Infrastructure Information (“CEII”).  These one-line diagrams contain
one-line schematics of transmission lines and the Astoria Annex and Astoria East
substations which, if disclosed, could pose a threat to the security and the reliability of
the New York State bulk power system.  These diagrams provide more than simply the
general location of critical infrastructure.  Unlike publicly available maps of power
transmission lines and generation and substation facilities, these schematics shows the
exact nature and specific location of facilities and transmission lines used to maintain the
reliability of the New York State bulk power system.  They reveal critical information
related to the facilities and transmission depicted therein that, if disclosed, could be
useful to a person seeking to disable the power grid.  Therefore, the disclosure of these


 

 

Honorable Kimberly D. Bose April 25, 2012

Page 10

 

 

CEII diagrams would pose a threat to the reliability of the New York State bulk power
system and to the health and safety of New York residents.  Moreover, the information
revealed in these schematics reveal CEII that FERC has determined to be exempt from
mandatory disclosure under 5 U.S.C. § 552(b)(7)(F). The diagrams have been omitted
from the Public version of the Interconnection Agreement included in this filing. The
diagrams are included only in the CEII version of the Interconnection Agreement in the
filing.

All communications relating to this request for CEII treatment should be addressed to the following:

For Con Edison:


John Beck

Section Manager

Consolidated Edison Company of New York, Inc.

4 Irving Place, Room 1450-S New York, NY  10003

Phone: (212) 460-4244 Fax: (212) 529-1130

 

For NYPA

James Sheldon

Director, Electrical Engineering New York Power Authority

123 Main Street

White Plains, NY  10601 Phone: (914) 681-6456
Fax: (914) 287-3005

 

 

 

IV.EFFECTIVE DATE


Paul A. Savage
Associate Counsel

Consolidated Edison Company of New York, Inc.

4 Irving Place, Room 1815-S New York, NY  10003

Phone: (212) 460-2764 Fax: (212) 529-9265

 

 

 

Andrew F. Neuman Special Counsel

New York Power Authority 123 Main Street

White Plains. NY  10601 Phone: (914) 390-8028 Fax:  (914) 390-8038


Con Edison and NYPA request that the Commission permit the Agreement to

become effective as of May 1, 2012.  The Commission has waived the 60-day notice

requirement, partially or entirely, with respect to other interconnection agreements where circumstances warrant.  A waiver in this case would serve the public interest by

(i) eliminating a reliability deficiency prior to the commencement of the peak summer
season and (ii) providing certainty with regard to investments and facilities that Con
Edison must make and construct to eliminate that deficiency.   The Agreement will not


 

 

Honorable Kimberly D. Bose April 25, 2012

Page 11

 

 

alter the rates or revenues of NYPA or Con Edison.  Accordingly, NYPA requests that the Commission grant a waiver of its prior notice requirements to the extent necessary to accommodate the requested effective date.

 

 

V. COMMUNICATIONS AND CORRESPONDENCE

Communications regarding this filing should be directed to:

For NYPA:

 

Andrew F. Neuman
Special Counsel

New York Power Authority
123 Main Street

White Plains, New York10601

(t) 914.390.8028

(f) 914.390.8038

Andrew.Neuman@nypa.gov

 

For Con Edison:

 

Paul A. Savage
Associate Counsel

Consolidated Edison Company
of New York, Inc.

4 Irving Place, Room 1815-S
New York, NY  10003
Phone: (212) 460-2764

Fax: (212) 529-9265

 

 

 

 

 

VI.DOCUMENTS SUBMITTED

This filing consists of the following documents:

A.this filing letter;

B.a clean Public version of the Agreement;


 

 

Honorable Kimberly D. Bose April 25, 2012

Page 12

 

C.a clean CEII version of the Agreement; and

D.a blacklined Public version showing the Agreement’s changes from

the NYISO’s pro forma LGIA.

 

 

VII.   SERVICE

Con Edison will serve this filing electronically on the NYPSC, the NYISO, and

NYPA.

 

 

VIII.  CONCLUSION

Wherefore, Con Edison and NYPA respectfully request that the Commission accept the attached Agreement effective as of May 1, 2012.

 

 

 

Respectfully submitted,

 

/s/ Andrew Neuman

 

New York Power Authority
Andrew Neuman, Esq. New York Power Authority

123 Main Street

White Plains, NY  10601-3170
Email: andrew.neuman@nypa.gov

 

s/ Marc Richter

 

Consolidated Edison Company of New York, Inc.
Marc Richter, Esq.

Vice President

Consolidated Edison Co. of New York, Inc.

4 Irving Place, Room 1815-s

New York, NY  10003

Email: richterm@coned.com