The NYISO – PJM Coordination Agreement covers the PJM – NYISO Interconnection Facilities under the Operational Control of the NYISO and PJM. For Operational Control purposes, the point of demarcation for each of the Interconnection Facilities listed below is the point at which each Interconnection Facility crosses the PJM-New York State boundary, except as noted below.
The PJM-NYISO Interconnection contains twenty-three (23) alternating current (“AC”) Interconnection Facilities, seven (7) of which form one (1) AC pseudo-tie[1]; and further contains one (1) HVDC Interconnection Facility as well as one (1) Variable Frequency Transformer (VFT). These are tabulated below:
NY/PJM AC Interconnection Facilities:
PJM NYISO Designated (kV) Common Meter Point
BranchburgRamapo5018500Ramapo
Cresskill Sparkill75169Cresskill
E. Sayre N. Waverly956115E. Sayre
E. Towanda Hillside70230Hillside
Erie East South Ripley69230South Ripley
Harings CornersCorporate Drive703138Harings
Harings Corners Pearl River4534Harings
Harings CornersW. Nyack70169Harings
Homer City Watercure30345Homer
Homer CityStolle Road37345Homer
Hudson FarragutC3403345Farragut
Hudson FarragutB3402345Farragut
Linden GoethalsA2253230Goethals
Linden VFTLinden CogenVFT345Linden VFT
Montvale Pearl River49169Montvale
Montvale Blue Hill4469Montvale
Montvale Blue Hill4369Montvale
S. Mahwah Hilburn6569S. Mahwah
S. Mahwah S. MahwahBK 258138/345S. Mahwah
S. Mahwah Ramapo51138S. Mahwah
WaldwickS. MahwahJ3410345Waldwick
WaldwickS. MahwahK3411345Waldwick
Tiffany Goudey952115Goudey
Warren Falconer171115Warren
RECONYISOAC Pseudo-TieVariousO&R EMS
SayervilleNewbridgeHVDC-Tie500Newbridge
1.0Lake Erie Emergency Redispatch (LEER)
2.0RAMAPO PHASE ANGLE REGULATOR OPERATING PROCEDURE prepared by the NYPP/PJM Circulation Study Operating Committee.
3.0Operating Protocol for the Implementation of Commission Opinion No. 476, Docket No. EL02-23-000 (Phase II), New York Independent System Operator, Inc., FERC Electric Tariff, Original Vol. No. 2, Attachment M-1.
34.0Northeastern ISO/RTO Coordination of Planning Protocol
45.0Inter Control Area Transaction Agreement.
56.0Procedures to Protect for Loss of Phase II Imports (effective January 16, 2007, pursuant to Order issued January 12, 2007, in FERC Docket No. ER07-231-000).
67.0Joint Emergency Operating Protocol dated September 10, 2009, among PJM Interconnection, L.L.C., New York Independent System Operator, Inc., and Linden VFT, LLC (Filed by PJM on October 1, 2009, in FERC Docket No. ER09-996-000).
Effective Date: 1/29/2014 - Docket #: ER14-461-000 - Page 1
[1]WEQ-007 “Inadvertent Interchange Payback Standards,” North American Energy Standards Board (NAESB), on-line at www.naesb.org.