NYISO Tariffs --> Open Access Transmission Tariff (OATT) --> 35 OATT Attachment CC - Joint Operating Agreement Among And --> 35.21 OATT Att CC Schedules A & B

35.21Schedules A and B

Schedule A - Description Of Interconnection Facilities

The NYISO – PJM Coordination Agreement covers the PJM – NYISO Interconnection Facilities under the Operational Control of the NYISO and PJM.  For Operational Control purposes, the point of demarcation for each of the Interconnection Facilities listed below is the point at which each Interconnection Facility crosses the PJM-New York State boundary, except as noted below.

 

The PJM-NYISO Interconnection contains twenty-three (23) alternating current (“AC”) Interconnection Facilities, seven (7) of which form one (1) AC pseudo-tie[1]; and further contains one (1) HVDC Interconnection Facility as well as one (1) Variable Frequency Transformer (VFT). These are tabulated below:

 

NY/PJM AC Interconnection Facilities:

PJM            NYISO        Designated       (kV)      Common Meter Point

BranchburgRamapo5018500Ramapo

Cresskill Sparkill75169Cresskill

E. Sayre N. Waverly956115E. Sayre

E. Towanda Hillside70230Hillside

Erie East South Ripley69230South Ripley

 

Harings CornersCorporate Drive703138Harings

Harings Corners Pearl River4534Harings

Harings CornersW. Nyack70169Harings

Homer City Watercure30345Homer

Homer CityStolle Road37345Homer

Hudson FarragutC3403345Farragut

Hudson FarragutB3402345Farragut

Linden GoethalsA2253230Goethals

Linden VFTLinden CogenVFT345Linden VFT

Montvale Pearl River49169Montvale

Montvale Blue Hill4469Montvale

Montvale Blue Hill4369Montvale

S. Mahwah Hilburn6569S. Mahwah

S. Mahwah S. MahwahBK 258138/345S. Mahwah

S. Mahwah Ramapo51138S. Mahwah

WaldwickS. MahwahJ3410345Waldwick

WaldwickS. MahwahK3411345Waldwick

Tiffany Goudey952115Goudey

Warren Falconer171115Warren

 

RECONYISOAC Pseudo-TieVariousO&R EMS

 

SayervilleNewbridgeHVDC-Tie500Newbridge

 

Schedule B - Other Existing Agreements:

1.0Lake Erie Emergency Redispatch (LEER)

2.0RAMAPO PHASE ANGLE REGULATOR OPERATING PROCEDURE prepared by the NYPP/PJM Circulation Study Operating Committee.

3.0Operating Protocol for the Implementation of Commission Opinion No. 476, Docket No. EL02-23-000 (Phase II), New York Independent System Operator, Inc., FERC Electric Tariff, Original Vol. No. 2, Attachment M-1.

34.0Northeastern ISO/RTO Coordination of Planning Protocol

45.0Inter Control Area Transaction Agreement.

56.0Procedures to Protect for Loss of Phase II Imports (effective January 16, 2007, pursuant to Order issued January 12, 2007, in FERC Docket No. ER07-231-000).

67.0Joint Emergency Operating Protocol dated September 10, 2009, among PJM Interconnection, L.L.C., New York Independent System Operator, Inc., and Linden VFT, LLC (Filed by PJM on October 1, 2009, in FERC Docket No. ER09-996-000).

 

 

Effective Date: 1/29/2014 - Docket #: ER14-461-000 - Page 1


[1]WEQ-007 “Inadvertent Interchange Payback Standards,” North American Energy Standards Board (NAESB), on-line at www.naesb.org.