Docket Nos. ER21-2392-000 and ER21-2392-001 1
176 FERC ¶ 61,211
FEDERAL ENERGY REGULATORY COMMISSION
WASHINGTON, DC 20426
September 29, 2021
In Reply Refer To:
New York Independent System Operator, Inc.
New York Power Authority
Docket Nos. ER21-2392-000 and ER21-2392-001
New York Power Authority
123 Main Street
White Plains, NY 10601
Van Ness Feldman, LLP
1050 Thomas Jefferson St, NW
Washington, DC 20007
Attention: Gary D. Levenson and Gary D. Bachman
Counsel for the New York Power Authority
Dear Mr. Levenson and Mr. Bachman:
NYPA states that the revised tariff records are submitted to comply with the requirements of the Commission’s order conditionally granting NYPA transmission incentives for the Segment A project (specifically, the Commission granted an incentive return on equity (ROE) adder for the risks and challenges associated with the Segment A project).[3] NYPA explains that, in its request for the incentive ROE adder, NYPA committed to adopt the risk-sharing mechanism established by LSPG-NY in connection with recovery of its costs for the Segment A project, subject to necessary modifications to reflect NYPA’s formula rate template and protocols. According to NYPA, the Commission conditioned its grant of the requested incentive ROE adder on NYPA’s incorporation of such a cost containment mechanism into its formula rate template and protocols. NYPA notes that the Commission recently approved a settlement establishing LSPG-NY’s cost containment mechanism in its formula rate and protocols for LSPG-NY’s portion of its investment in the Segment A project.[4]
By direction of the Commission.
Debbie-Anne A. Reese,
Deputy Secretary.
[1] New York Independent System Operator, Inc., NYISO Tariffs, NYISO OATT, 14.2.3-14.2.3.1 OATT attach. H - NYPA Formula Rate, (4.0.0), NYISO OATT, 14.2.3.2 OATT attach. H - NYPA Formula Rate Implementation Proto, (2.0.0), and NYISO OATT, 14.2.3-14.2.3.1 OATT attach. H - NYPA Formula Rate, (5.0.0).
[2] Docket No. ER21-2392-000 (Initial Filing), Transmittal Letter at 1. Segment A is the Marcy to New Scotland Project in what is known as the AC Transmission Projects, which are public policy driven transmission additions to the transmission grid in the State of New York based on public policy transmission needs identified by the New York Public Service Commission. NYPA and LS Power Grid New York Corporation I (LSPG-NY) are joint developers of the Segment A portion of the AC Transmission Projects. See id., attach. B, NYISO OATT, attach. H, proposed § 14.2.3.2.9.
[3] Id., Transmittal Letter at 2 (citing N.Y. Power Auth., 169 FERC ¶ 61,125, at P 36 (2019) (NYPA Incentives Order)).
[4] Id. at 1, 7 (citing N.Y. Indep. Sys. Operator, Inc., 175 FERC ¶ 61,210 (2021)).
[5] Id. at 7-9.
[6] Docket No. ER21-2392-001 (Amended Filing), Transmittal Letter at 3.
[7] See 18 C.F.R. § 35.11 (2020); Cent. Hudson Gas & Elec. Corp., 60 FERC ¶ 61,106, reh’g denied, 61 FERC ¶ 61,089 (1992). Version 4.0.0 of the revised formula rate template filed in Docket No. ER21-2392-000 is rejected as moot. In the future, NYISO should use Associated Filing and Record Identifiers at the record level when amending a tariff record in a pending proceeding.